You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Water Quality Monitoring Device

    SBC: Gky And Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  2. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  3. THE RESEARCH INVESTIGATOR'S TECHNOLOGY SYSTEM "RITA"

    SBC: Intellicorp            Topic: N/A

    COORDINATING INFORMATION EXCHANGE BETWEEN A LARGE NUMBER OF INTERRELATED RESEARCH AND DEVELOPMENT (R&D) PROJECTS HAS TYPICALLY BEEN CONDUCTED USING HIERARCHICAL DATA BASE MANAGEMENT SOFTWARE FOR CATALOGING AND RETRIEVING PROJECT RECORDS. AN INTELLIGENT R&D INVESTIGATOR'S ASSISTANT, ONE THAT USED OBJECT-ORIENTED PROGRAMMING TECHNIQUES TO CLASSIFYPROJECTS AND THAT COULD EMPLOY SUBJECTIVE KNOWLEDGE A ...

    SBIR Phase I 1990 Department of Transportation
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. LASER RADAR MEASUREMENT SYSTEM FOR ROADSIDE ENCROACHMENT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  6. Software for In-Flight Detection of Widespread Fatigue in Engine Disks

    SBC: Monitoring Technology Corp            Topic: N/A

    The proposed project will demonstrate unique digital signal processing software for automated, early detection of Widespread Fatigue (WF) damage in turbine engine disks. The software, known as RVMD is based on recently patented technology in Rotational Vibrationa Monitoring (RVM). RVMD will measure loss of disk structural rigidity due to WF defects, both from High Cycle and Low Cycle Fatigue. ...

    SBIR Phase I 1996 Department of Transportation
  7. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  8. MEASURING LIVE LOAD STRESSES ON BRIDGES

    SBC: SCIENCE & ENGINEERING ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Transportation
  9. High Resolution Data Sources and Applications for Transportation Planning

    SBC: Shenandoah Mountain            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  10. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government