You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
A FUEL/AIR DRIVE FLUX COMPRESSOR POWER UNIT FOR ELECTROTHERMAL GUNS
SBC: KTECH CORP. Topic: N/AThe Ktech Team proposes a feasibility study of a fuel/air driven flux compression power unit (FCPU) for electric guns. Through variations of inductance gradients and through changes in scale, the proposed technology will be applicable to both electrothermal/chemical and electromagnetic guns. In the Phase 1 effort, we develop simulation models to predict the performance of the flux compression po ...
SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency -
An Improved Plasma Opening Switch for DECADE
SBC: NumerEx Topic: N/ACURRENT ATTEMPTS TO USE THE PLASMA OPENING SWITCH (POS) FOR DECADE HAVE NOT YET BEEN ENTIRELY SUCCESSFUL DUE TO THE APPARENT INABILITY OF THE SWITCH TO OPEN EFFICIENTLY TO A HIGH-IMPEDENCE LOAD. RESEARCH DIRECTED TOWARD IMPROVING THE PERFORMANCE OF THE POS IN THE LONG-CONDUCTION TIME REGIME HAS BEEN FRUSTRATED BY THE INABILITY OF COMPUTATIONAL TOOLS TO OPERATE IN THE PARAMETER REGIMES OF INTEREST ...
SBIR Phase II 1997 Department of DefenseDefense Threat Reduction Agency -
A NOVEL FIELD PROGRAMMABLE GATE ARRAY FOR SPACE APPLICATIONS
SBC: MISSION RESEARCH CORP. Topic: N/AMission Research Corporation proposes the development of a unique FPGA (field programmable gate array) for applications in space and other military and civilian environments requiring the versatility of reconfigurability with retention of the configuration in an unpowered state. The FPGA will be capable of being configured once and retaining that configuration for a minimum of 10 years even with ...
SBIR Phase II 1997 Department of DefenseDefense Threat Reduction Agency -
DEVELOPMENT OF A HIGH DYNAMIC RANGE DOWNHOLE SIGNAL CONDITIONING MODULE
SBC: Applied Research Associates, Inc. Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency -
DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION
SBC: Shonka Research Associates Topic: N/ATWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.
SBIR Phase II 1990 Nuclear Regulatory Commission -
DYNAMIC PRESSURE GAGE DEVELOPMENT FOR SUBSONIC FLOWS
SBC: Tech Reps Inc Topic: N/ATHE OBJECTIVE OF THIS PROJECT IS TO DEVELOP AN IMPROVED DIFFERENTIAL PRESSURE GAGE FOR DETERMINING DYNAMIC PRESSURE WITHIN BLAST AND SHOCK WAVE FLOWS WHERE THE FLOWS ARE SUBSONIC. DERIVATION OF DYNAMIC PRESSURE FROM A MEASUREMENT OF THE DIFFERENCE BETWEEN STAGNATION PRESSURE AND SIDE-ON OR STATIC PRESSURE REQUIRES USE OF THE SIDE-ON PRESSURE RECORD TO CORRECT FOR COMPRESSIBILITY EFFECTS. CURRENTLY ...
SBIR Phase I 1988 Department of DefenseDefense Threat Reduction Agency -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
EMP AND HPM SUPPRESSION TECHNIQUES
SBC: Integrated Sciences Topic: N/ASurvival of present day microelectronic circuits depends on their protection from self generated and external electromagnetic interference. This proposal is oriented toward the class of interference generally referred to as overvoltage transients. Means for mitigating these transients include gas discharge tubes, and various solid state devices. Each of these has their own advantages in particu ...
SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency -
FAST-RISE HIGH PRESSURE GAUGE FOR LONG-DURATION NUCLEAR AIRBLAST
SBC: KTECH CORP. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency