You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High Fidelity Front End Simulation for Complex Physics-Based Processing Systems

    SBC: Sedna Digital Solutions, LLC            Topic: N05059

    This effort will establish the baseline design of an advanced sonar simulator/stimulator suite for current and future systems with fidelity comparable with recorded at-sea data. This effort will bring together existing simulator designs with design changes or extensions to provide high fidelity simulation data for system certification and algorithm development while maintaining applicability to t ...

    SBIR Phase II 2007 Department of DefenseNavy
  2. Obsolescence Management Decision Making and Planning Tool

    SBC: Advanced Systems/Supportability Engineering Technologies And Tools, Inc.            Topic: N05162

    The US Navy is tasked with managing the complex problem of forecasting and scheduling shipyard resources and ships through the shipyards to accomplish required ship and ship system maintenance and upgrade actions.NAVSEA, in cooperation with the Commander, U.S. Fleet Forces Command (CFFC), schedules maintenance availability periods for submarines, ships, and aircraft carriers. The CFFC develops sch ...

    SBIR Phase II 2007 Department of DefenseNavy
  3. Combat Systems of the Future

    SBC: Advanced Systems/Supportability Engineering Technologies And Tools, Inc.            Topic: N05149

    ASSETTs Phase II base effort under SBIR N05-149 provides three key products which result from the documented methodology and processes established during Phase I:(1) Requirements associated with the Combat System of the Future (CSoF) developed from our robust methodology and captured in an Initial Capabilities Document (ICD) and Cognitive Specification, (2) CSoF architectural prototype and associa ...

    SBIR Phase II 2007 Department of DefenseNavy
  4. Improved Propeller De-Icing Systems

    SBC: NOESIS, INC.            Topic: N03007

    Defense Holdings, Inc. has developed an innovative approach to replacing existing carbon brushes that are used to transfer electrical power across a sliding interface. This technology, employing a brush constructed of hair-fine metal fibers, promises to provide significant improvements to the efficiency of current transfer, with attendant reductions in electrical noise, sliding surface heating, an ...

    SBIR Phase II 2007 Department of DefenseAir Force
  5. Secure Software Platform for Real-Time Software Anti-Tamper

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: MDA05020

    Software reverse engineering has become a science of well-defined methods, tools, and philosophies. Known approaches – such as white-box, black-box, and gray-box attacks – and highly-intricate tools – such as debuggers, decompilers, and disassemblers – can be combined to reveal the secrets of software intellectual property and to steal once-secret code and data. Current approaches to sof ...

    SBIR Phase II 2007 Department of DefenseMissile Defense Agency
  6. Non-Intrusive Health Monitoring for Post-Battle Wellness Management

    SBC: AFrame Digital, Inc.            Topic: SB052012

    AFrame's proposal to deliver a prototype system for Phase II will improve care for recovering warfighters and lead to easier transitions through the stepdown from hospital and rehabilitation settings to homecare and independence. Using advanced probabilistic reasoning, the system determines a patient’s vital sign baseline and sends intelligent alerts on important variations from that baseline d ...

    SBIR Phase II 2007 Department of DefenseDefense Advanced Research Projects Agency
  7. USW Intelligent Controller

    SBC: ADAPTIVE METHODS, INC.            Topic: N06050

    This Phase 2 project will develop and integrate intelligent controller technology into the Navy’s Undersea Warfare-Decision Support System (USW-DSS). Technologies to be developed include (1) XMAP cross-platform sensor data fusion, (2) XMAP contact state estimation, and (3) common tactical picture (CTP) synchronization. XMAP track-to-track association innovations include its ability to exploit ...

    SBIR Phase II 2007 Department of DefenseNavy
  8. Optical Jitter Control for Laser Communications

    SBC: A-TECH CORPORATION            Topic: AF06255

    Applied Technology Associates (ATA) proposes to design, implement, and test a prototype Laser Communications Optical Motion Mitigation (LCOMM) system to provide two critical control capabilities to laser communications systems: seamless switching between acquisitions and tracking modes, and handling short sensor outages while minimizing outgoing beam jitter to less that 1-μrad rms. An important c ...

    SBIR Phase II 2007 Department of DefenseAir Force
  9. Advanced Data Fusion

    SBC: DECISIVE ANALYTICS CORPORATION            Topic: MDA05057

    In working with our Phase I sponsor, we identified a clear opportunity to develop an advanced BMDS Human Machine Interface (HMI) mockup that can serve as the platform for testing, training, and refinement of advanced algorithms in the BMDS. We will build out the results of our Phase I algorithm development efforts and integrate them into a fully transportable HMI mockup. The mockup will provide a ...

    SBIR Phase II 2007 Department of DefenseMissile Defense Agency
  10. Advanced Data Fusion

    SBC: DECISIVE ANALYTICS CORPORATION            Topic: MDA05057

    In working with our Phase I sponsor, we identified a clear opportunity to develop an advanced BMDS Human Machine Interface (HMI) mockup that can serve as the platform for testing, training, and refinement of advanced algorithms in the BMDS. We will build out the results of our Phase I algorithm development efforts and integrate them into a fully transportable HMI mockup. The mockup will provide a ...

    SBIR Phase II 2007 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government