You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SBIR Phase I: Recurrent Adaptive Critics for Nonlinear Systems Control
SBC: ACCURATE AUTOMATION CORPORATION Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Neural Network Methods for Robust System Identification
SBC: ACCURATE AUTOMATION CORPORATION Topic: N/AN/A
SBIR Phase I 1996 National Science Foundation -
SBIR Phase I: Intelligent Agents Using Situation Assessment
SBC: ACCURATE AUTOMATION CORPORATION Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
NEW METHOD OF OXIDATION- REDUCTION OF HAZARDOUS ORGANICS
SBC: American Combustion Inc Topic: N/AAN EVALUATION OF THE FEASIBILITY OF A NEW METHOD OF OXIDATION - REDUCTION OF HAZARDOUS ORGANICS BY THE USE OF A SACRIFICIAL METAL IN A SPONTANEOUS PROCESS TRIGGERED BY CEMENTATION OF A NOBLE METHOD WILL BE PREFORMED. EFFECTS ASSOCIATED WITH MAJOR PROCESS PARAMETERS SUCH AS PH,MIXING, ATMOSPHERE, ETC. ON THE EFFICIENCY AND RATES OF OXIDATION - REDUCTION OF VARIOUS CLASSES OF HAZARDOUS ORGANICS WILL ...
SBIR Phase I 1988 National Science Foundation -
EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
KRYPTON-81 DATING IN POLAR ICE SAMPLES
SBC: ATOM SCIENCES, INC. Topic: N/AAIR BUBBLES TRAPPED IN POLAR ICE AT THE TIME OF ICE FORMATION PROVIDE VALUABLE CLUES TO AID IN OUR UNDERSTANDINGOF THE CAUSES OF GLOBAL CLIMATE CHANGE. IT IS VITAL IN THISEFFORT THAT THE AGE OF THE ICE (WHICH MAY BE 500,000 YRS. ORMORE IN SOME LOCATIONS) BE ESTABLISHED. PRESENTLY, THERE ISNO METHOD FOR DATING ICE ABSOLUTELY BEYOND 50,000 YRS. A NEW METHOD FOR DATING POLAR ICE IN THE RANGE OF 50,00 ...
SBIR Phase I 1990 National Science Foundation -
MEASUREMENT OF CARBON 14 ISOTOPICALLY SELECTIVE RESONANCE IONIZATION MASS SPECTROSCOPY
SBC: ATOM SCIENCES, INC. Topic: N/A(14)C DATING BY MEANS OF RADIOACTIVE DECAY COUNTING, AND RECENTLY BY MEANS OF TANDEM ACCELERATOR MASS SPECTROMETER (TAMS) IS EXTREMELY IMPORTANT IN A WIDE RANGE OF FIELDS INCLUDING ANTHROPOLOGY, ARCHAEOLOGY, HYDROLOGY, OCEANOGRAPHY, AND OTHERS. PROPOSED HERE IS A NEW METHOD FORCOUNTING (14)C OR, MORE SPECIFICALLY, MEASURING (14)C/(12)C AND (14)C/(13)C RATIOS, THAT REQUIRES SMALLER SAMPLES BY THREE ...
SBIR Phase I 1990 National Science Foundation -
SBIR Phase I: A New Instrument for Surface Characterization
SBC: ATOM SCIENCES, INC. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SCHEDULING TECHNOLOGY FOR SEMICONDUCTOR FABRICATION
SBC: Caps Logistics, Inc. Topic: N/AMINIATURIZATION OF ELECTRONIC COMPONENTS INTO INTEGRATED CIRCUITS (SEMICONDUCTOR DEVICES) HAS DRAMATICALLY AFFECTED OUR LIVES. NO WHERE IS THIS MORE APPARENT THAN THE LARGE DEPENDENCY AMERICAN MANUFACTURING HAS ON SEMICONDUCTOR DESIGN AND FABRICATION. THE PRODUCTION OF AN INTEGRATED CIRCUIT REQUIRES A FOUR STAGE PROCESS: 1) WAFER FABRICATION; 2) WAFER PROBE; 3) ASSEMBLY (PACKAGING); AND 4) FINAL T ...
SBIR Phase I 1988 National Science Foundation -
SBIR Phase I: Commercially Viable Deposition of Catalytic Films Onto Proton Conducting Membranes
SBC: CCVD, Inc dba MicroCoating Technologies (MCT) Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation