You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SBIR Phase I: AIDE: The Data Analyst's Assistant
SBC: Acsiom Labs Inc. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Three Dimensional Volumetric Image Display = A New Computer Display for Information Visualization
SBC: ACT Research Corporation Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Process-Control Instrument for Multi-Chamber Platforms
SBC: Active Impulse Sys, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Sensitive Semiconductor Optical Detector for Bore Hole Logging
SBC: RADIATION MONITORING DEVICES, INC. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: A Novel Flat Panel Detector for X-Ray Diffraction
SBC: RADIATION MONITORING DEVICES, INC. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Protein Crystals as Novel Materials for Chromatography
SBC: ALTUS BIOLOGICS, INC. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Low Cost Composite Plate for Proton Exchange Membrane (PEM) Fuel Cell
SBC: ANALYTIC POWER LLC Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Low Cost, High Power Gradient Cryo-Amplifiers for Magnetic Resonance Imaging (MRI)
SBC: AMERICAN SUPERCONDUCTOR CORPORATION Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Supercritical Fluid Viral Inactivation in a Varying Potential Electrical Field
SBC: APHIOS CORPORATION Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Sky Explorer: A Low-Cost Telescope/CCD Camera System, Incorporating Interactive Software, to Enrich High School Science and Technology Learning in Astronomy
SBC: Boston Engineering Service Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation