You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator
SBC: Fm Technologies Inc Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A CONTINUOUS CRYOPUMP/PELLET-FABRICATION APPARATUS FOR FUSION
SBC: Cryogenic Applications F, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Energy -
A Dedicated PET Scanner for Imaging Gene Expression in Mice
SBC: CTI SERVICES, INC. Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A 34 GHz High-Power Micro-Pulse Klystron
SBC: Fm Technologies Inc Topic: N/A161 A 34 GHzHigh-Power Micro-Pulse Klystron--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82374 Amount: $75,000 High-current pulses of electrons are widely used in injector systems for electron accelerators, such as industrial linacs, as well ...
SBIR Phase I 1997 Department of Energy -
A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators
SBC: Fm Technologies Inc Topic: N/A149 A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82375 Amount: $75,000 The development of high-current, short-duration pulses of electrons used in injectors of particle a ...
SBIR Phase I 1997 Department of Energy -
A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles
SBC: Commercial Electronics, Inc. Topic: N/A86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...
SBIR Phase I 1997 Department of Energy -
A LOW NITROGEN OXIDE HIGH PERFORMANCE POWER SYSTEMS (HIPPS) COAL/GAS BURNER
SBC: Johanson And Assoc Topic: N/ATHIS PROJECT WILL INVESTIGATE AN INNOVATIVE BURNER FOR THE CONTROL OF OXIDES OF NITROGEN (NOX) FROM THE COMBUSTION OF FOSSIL FUEL, I.E., COAL AND NATURAL GAS, AND IN THE FUTURE EXTEND TO 100 PERCENT COAL TO MEET OR EXCEED THE REQUIREMENTS OF THE HIGH PERFORMANCE POWER SYSTEM (HIPPS). THE HIPPS IS A COMBINED CYCLE POWER PLANT CONSISTING OF AN INDIRECTLY FIRED BRAYTON TOPPING CYCLE AND A CONVENTION ...
SBIR Phase I 1994 Department of Energy -
A Micro-Pulse Electron Injector
SBC: Fm Technologies Inc Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A MULTIMEDIA-AUGMENTED SOFTWARE TUTORIAL FOR THE HIGH ACCEPTANCE RECOIL POLARIMETER DEVICE
SBC: PLANNING SYSTEMS, INC. Topic: N/ATHIS PROJECT WILL ASSESS THE FEASIBILITY OF USING MULTIMEDIA-AUGMENTED SOFWEARE TUTORIALS TO SUPPORT TEACHING THE PRINCIPLES OF EXPERIMENTAL NUCLEAR PHYSICS. THE DETECTOR SYSTEM FOR THE PHOTON TAGGING FACILITY AT THE CONTINUOUS ELECTRON BEAM ACCELERATOR FACILITY (CEBAF) IN NEWPORT NEWS, VIRGINIA IS NOW UNDER CONSTRUCTION AT THE NUCLEAR DETECTOR LABORATORY OF THE CENTER FOR NUCLEAR STUDIES OF THE ...
SBIR Phase I 1994 Department of Energy -
An Automated Weather Balloon Raniosonde Launcher
SBC: Erc, Inc. Topic: N/A21 An Automated Weather Balloon Radiosonde Launcher--ERC, Inc., P.O. Box 417, 1940 Elk River Dam Road, Tullahoma, TN 37388-0417; (615) 455-9915 Dr. John P. Foote, Principal Investigator Mr. John T. Lineberry, Business Official DOE Grant No. DE-FG02-97ER82370 Amount: $74,994 Weather balloons are a primary tool used in the study of weather patterns by researchers supported by the Department of ...
SBIR Phase I 1997 Department of Energy