You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Maritime Surface Search Phased Array for Combatant-Craft
SBC: TRIDENT SYSTEMS LLC Topic: SOCOM15001Naval Special Warfare (NSW) needs a new Surface Search Phased Array (SSPA) radar which can detect locate and track maritime objects of interest on the water and in the air while also being low observable (LO), low probability of detection (LPD) and low probability of intercept (LPI) as a replacement for the commercial maritime radars currently employed on the RIB and the MK-5 and for employment on ...
SBIR Phase I 2015 Department of DefenseSpecial Operations Command -
Novel Approaches to Fully Digital Optical Solutions
SBC: PERCEPTIVE INNOVATIONS, INC. Topic: SOCOM15003"In this Phase I effort, the PI2 team will perform a set of technology and algorithmic trade studies with the goal of finding innovative new system concepts for a head-mounted display system for TALOS using all digital processing, and with extremely low latency (objective: 1.2ms, threshold: 5ms) from light into the sensor to light out of the display. We approach this with trade studies to survey t ...
SBIR Phase I 2015 Department of DefenseSpecial Operations Command -
Miniature Target Recognition and Display System (MTRDS)
SBC: McQ Inc. Topic: SOCOM15006The purpose of this SBIR is to develop a hand emplaced ruggedized device that provides motion detection sensing, day/night imaging, and image processing; to detect and identify personnel in the vicinity of the system. This device must be as low SWAP-C (size weight power and cost) as possible, connect to a hand held display 100m-200m away via a wired or wireless link, detect personnel with a 45-60 ...
SBIR Phase I 2015 Department of DefenseSpecial Operations Command -
Maritime Surface Search Phased Array for Combatant-Craft
SBC: FIRST RF CORPORATION Topic: SOCOM15001In this Phase I effort, FIRST RF will develop and evaluate concepts for advanced Surface Search Phased Array radar systems that will be integrated on Naval Special Warfare Combatant-Craft. A phased array system allows for dynamic beam steering with graceful degradation and eliminates the need for mechanical pointing of the antenna aperture. The FIRST RF SSPA radar system will detect, locate, track ...
SBIR Phase I 2015 Department of DefenseSpecial Operations Command -
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/ASEVERAL STATES ARE CURRENTLY SEEKING MUCH-NEEDED NEW LOW-LEVEL RADIOACTIVE DISPOSAL SITES IN ACCORDANCE WITH THE LOW-LEVEL RADIOACTIVE WASTE POLICY ACT OF 1980. ANY NEW COMMERCIALREQUIREMENT THAT A SITE BE CAPABLE OF BEING MODELED AND THATITS PERFORMANCE BE ASSURED FOR 500 YEARS. FOR MOST SITES, THE HYDROGEOLOGICAL AND RADIONUCLIDE TRANSPORT CHARACTERIS- TICS OF THE UNSATURATED ZONE ARE MAJOR FACT ...
SBIR Phase II 1989 Nuclear Regulatory Commission -
Development of a Performance Assessment Process Controller
SBC: Innovative Tech. Solutions Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
QUANTIFICATION OF CONSERVATISMS IN SEISMIC RISK ESTIMATES THROUGH ENGINEERING ADVANCEMENT OF SEISMIC PRA
SBC: Risk Engineering Inc. Topic: N/AN/A
SBIR Phase I 1989 Nuclear Regulatory Commission -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/ATHE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...
SBIR Phase II 1989 Nuclear Regulatory Commission -
DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION
SBC: Shonka Research Associates Topic: N/ATWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.
SBIR Phase II 1990 Nuclear Regulatory Commission