You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS
SBC: Accident Prevention Group Topic: N/ACURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.
SBC: Corpe Corp. Topic: N/AAT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM
SBC: EPOCH ENGINEERING, INC. Topic: N/AWHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA
SBC: Frh, Inc. Topic: N/ACHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES
SBC: Future Resources Associate Inc Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
SMART WATER-REACTIVE GROUTS FOR UNDERGROUND ENTOMBMENT FACILITIES
SBC: Guyer Santin, Inc. Topic: N/ATHIS PROPOSAL IS TO ADDRESS THE FEASIBILITY OF WATER-REACTIVE GROUTS AS A "SMART" MATERIAL CAPABLE OF BEING PLACED DURING CONSTRUCTION BUT NOT ACTIVATED UNTIL A THREAT EVENT OCCURS WHICH DEGRADES THE ORIGINAL WATERTIGHT INTEGRITY. WHEN SUCH DEGRADATION OCCURS, IT WILL EXPOSE THE WATER-REACTIVE GROUT TO GROUNDWATER. THIS WILL TRIGGER THE HARDENING PROCESS WHICH WILL AUTOMATICALLY AFFECT A EAL AT TH ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
CONTROL ROOM INLEAKAGE TEST
SBC: Lagus Applied Technology Inc. Topic: N/AA SIMPLIFIED RECONNAISSANCE-TYPE TEST IS PROPOSED THAT UTILIZES THE TECHNIQUES OF TRACER GAS VENTILATION TESTING TO QUANTIFY THE UNFILTERED AIR INLEAKAGE INTO AN OPERATING NUCLEAR POWER PLANT CONTROL ROOM. THE TEST WILL BE DEVELOPED TO ENCOMPASS THE FIVE BASIC TYPES OF CONTROL ROOM EMERGENCY VENTILATION SYSTEMS. A THOROUGH ERROR ANALYSIS WILL ALSO BE UNDERTAKEN. A DETAILED TESTING PROTOCOL SUITABL ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
MEASUREMENT BASED DEPENDABILITY ANALYSIS FOR DIGITAL SYSTEMS
SBC: SOHAR, INC. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER
SBC: W Peter Trower Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
A REMOTE LASER INSPECTION SYSTEM FOR NUCLEAR REACTOR COMPONENTS
SBC: METROLASER, INCORPORATED Topic: N/ATHE DAMAGE FROM OPERATING STRESSES, AGING, AND ENVIRONMENT ACT TO MODIFY THE VIBRATIONAL MODAL PATTERNS OF NUCLEAR REACTOR COMPONENTS. WE PROPOSE TO EVALUATE THE FEASIBILITY OF APPLYING HOLOGRAPHIC TECHNIQUES FOR MONITORING AND QUANTIFYING THESE PATTERNS. THESE MEASUREMENTS COULD BE PERFORMED REMOTELY AND WITH MINIMUM DISRUPTION OF PLANT OPERATIONS. THE APPLICATION OF HOLOGRAPHY TO AUGMENT THE USE ...
SBIR Phase I 1991 Nuclear Regulatory Commission