You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Intelligent In-Line Power Disconnect System

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0131005

    This proposal is for an intelligent, in-line, power disconnect system (I2P) which is directly applicable to existing power line infrastructure. It requires no interruption in utility service for installation. The proposed connection would be coupled with strain sensing gauges and an array of sensors to facilitate gathering of real-time usage statistics, and assist in determining locations of dow ...

    SBIR Phase I 2013 Department of Homeland Security
  2. Quick Disconnect System for Power Distribution Hardening and Resiliency

    SBC: STREAMLINE AUTOMATION LLC            Topic: HSB0131005

    Recent data shows that reported natural disasters have nearly ten-folded over the past century. Aside from the threat to human lives, they pose a great threat to America's infrastructure and power grid. Nearly 90% of all power interruption occurs at the distribution level and over 75% of these are weather related. The proposed Phase I effort aims to combat these unavoidable threats by developin ...

    SBIR Phase I 2013 Department of Homeland Security
  3. RF Tracking in Wooded Areas

    SBC: Xandem Technology LLC            Topic: HSB0131001

    This SBIR Phase I project will investigate the possibility of using a network of low-cost, battery-powered radio frequency (RF) transceivers to detect, localize and track the movements of people illegally trying to enter the US borders through wooded areas. The system uses radio tomography (RT), i.e., the changes in radio signal strength (RSS) measurements on the static links of the network over t ...

    SBIR Phase I 2013 Department of Homeland Security
  4. Non-freezing Portable Vehicle Wash Tunnels

    SBC: Integrated Solutions for Systems, Inc.            Topic: HSB0121001

    Our approach utilizes a mature, portable inflatable beam shelter to house modified commercial car wash equipment operated by an automated control system. The inflatable beam shelters are currently deployed with the US Military and are commonly used as decontamination shelters for military vehicles. The commercial wash equipment is modified to withstand the caustic chemical environment necessar ...

    SBIR Phase II 2013 Department of Homeland Security
  5. Virtual Shooter

    SBC: Radiance Technologies, Inc.            Topic: HSB0121004

    The Phase II Virtual Shooter project objective is the design, development, fabrication, assembly, and test of a 6 degree-of-freedom (DOF) device which will fully simulate the recoil reactions of a wide range of human shooters, hand guns, and ammunition types. This program is based on the work now being completed under Phase I of SBIR topic no. H-SB012.1-004, contract number HSHQDC-12-C-00039, rev ...

    SBIR Phase II 2013 Department of Homeland Security
  6. Kappler SBIR-2012.2-005 Phase II

    SBC: KAPPLER INC            Topic: HSB0122005

    Kappler proposes to further define and develop a novel fabric composite that when integrated into Personal Protective Equipment (PPE) garments, provides protection to the wearer from multiple threats. The proposed research builds on the strength of the Phase I effort where Kappler validated the base fabric's capability to protect from chemical, biological, and flame hazards, and simultaneously be ...

    SBIR Phase II 2013 Department of Homeland Security
  7. Quick User Vetting for a Multi-jurisdictional Event

    SBC: Oasys International Corporation            Topic: HSB0191002

    The Public Safety Community (Community) would like to share information between jurisdictions, but need to trust with a reasonable certainty that the users viewing this information are who they say they are. Similarly, the Federal government and other organizations need to be reasonably sure that their new users are accessing the right information online. Identity proofing a user, either remotely ...

    SBIR Phase I 2019 Department of Homeland Security
  8. Dynamical Network Models for Mission Risk Assessment of Emergency Response Systems

    SBC: Achilles Heel Technologies, Inc            Topic: HSB0191007

    The integration of new cyber technologies in emergency response systems can allow profound improvements in system performance, but also expose the systems to systemic security and privacy risks.Thus, there is a critical need for design-time risk-assessment tools for emergency response systems, which allow evaluation and mitigation of threat impacts across their heterogeneous cyber and physical com ...

    SBIR Phase I 2019 Department of Homeland Security
  9. Bilayer Nanofibers as Wearable Sensors for Detecting Fentanyl Compounds

    SBC: Vaporsens, Inc.            Topic: HSB0181001

    Drug overdose is now the leading cause of death for Americans under 50 years old, with fentanyl claiming more lives than any other drug. Alarmingly, the problem is increasing, with fentanyl overdoses claiming nearly twice as many lives in 2016 compared to 2015. In addition to users, first responders are at risk for exposure to fentanyl as they perform their duties. Fentanyl is extremely dangerous ...

    SBIR Phase II 2019 Department of Homeland Security
  10. High Acceleration and Hypervelocity Inertial Measurement Unit

    SBC: ENGENIUSMICRO LLC            Topic: OSD181001

    Gun-launched applications currently expose inertial measurement units (IMUs) to harsh acceleration, shock, and vibration environments. Furthermore, as they become smarter, they present tighter constraints on size, weight, power, and cost (SWaP-C), while still requiring high levels of performance. New accelerometer technology must reduce SWaP-C while operating through high-g acceleration environmen ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government