You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Critical Program Information (CPI) Identification and Assessment Tool

    SBC: Management Analysis Network, LLC, The            Topic: SCO183002

    Protecting the effectiveness of US advanced weapon systems and the technology they rely on is a national priority. Unfortunately, individuals tasked with this mission are met with disjointed guidance, no training, and competing processes to consider. It is no wonder adversaries continue to exploit these weaknesses in the Department of Defense (DOD); stealing our Critical Program Information (CPI) ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  2. High Acceleration and Hypervelocity Inertial Measurement Unit

    SBC: ENGENIUSMICRO LLC            Topic: OSD181001

    Gun-launched applications currently expose inertial measurement units (IMUs) to harsh acceleration, shock, and vibration environments. Furthermore, as they become smarter, they present tighter constraints on size, weight, power, and cost (SWaP-C), while still requiring high levels of performance. New accelerometer technology must reduce SWaP-C while operating through high-g acceleration environmen ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  3. Electro-optical Seeker

    SBC: POLARIS SENSOR TECHNOLOGIES INC            Topic: OSD181002

    Mission times for high velocity projectiles (HVP) are very short and detection and discrimination of targets must happen quickly and decisively. One way to achieve this is through the enhanced contrast resulting from polarized sensing, which tends to highlight manmade objects and suppress natural background clutter. Thermal polarimetric sensing in a small package has been demonstrated already but ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  4. Electro-optical Seeker Based on HgCdTe Photodetection

    SBC: EPISENSORS INC            Topic: OSD181002

    The capability to reliably and remotely detect and track tactical surface targets in a high-velocity projectile after launch is a critical need. The discrimination of man-made objects can be assisted by the detector technology, with options including two-color detectors and polarimetric filtering in the thermal infrared bands. The level of complexity in the focal plane array affects its survivabil ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  5. Trace Explosives Particle and Vapor Sample Collection System Using Concentration of Scavenger Particles

    SBC: ENERTECHNIX, INC.            Topic: N/A

    Enertechnix proposes to adapt its novel aerodynamic lens aerosol concentration technology to provide high flow rate, high efficiency sampling of particles and vapors for use in the detection of Vehicle Borne Improvised Explosives Devices. Our approach combines forced air jet(s) for dislodging particles and vapors from the vehicle surfaces, concentration and collection of dislodged particles, and s ...

    SBIR Phase I 2008 Department of Homeland Security
  6. Non-Radioactive Alternative to Replace Radioactive Sources in Commercial Applications

    SBC: STARFIRE INDUSTRIES LLC            Topic: N/A

    This Starfire Industries Phase I SBIR project specifically addresses the need to replace Am-Be sources for the well-logging industry and other applications where sealed radioactive sources are being used. Market factors inhibiting DT fusion neutron generators from replacing Am-Be sources are: (1) still use radioactive tritium (licensing/export), (2) tube lifetimes are measured in hundreds of hours ...

    SBIR Phase I 2008 Department of Homeland Security
US Flag An Official Website of the United States Government