  1. Novel Manufacturing of Bimetallic Gun Barrels

    SBC: Ormond, LLC            Topic: A18090

    Gun barrels are subjected to wear and erosion from the hot propellant gases and high loads from the passage of projectiles.Sustained fire duration and rate of fire are largely limited by barrel thermal considerations, since the heat buildup in the barrel can cause rounds to fire prematurely (cook-off) or weaken the barrel and cause catastrophic failure. A cost effective solution of using a wear re ...

    SBIR Phase I 2019 Department of DefenseArmy
  2. Miniaturization of high average power, high peak power, wide bandwidth antennas

    SBC: XL Scientific, LLC            Topic: A16123

    Verus Research is pleased to respond to the A16-123 Army Phase-II SBIR solicitation. To meet the Armys Phase-II requirements in a risk-mitigated fashion, Verus Research will leverage its innovative Ferengi family-of-antennas technology which was conceived, designed, and experimentally demonstrated by Verus Research under the previous Army-funded Phase-I Base A16-123 SBIR effort. For the proposed P ...

    SBIR Phase II 2019 Department of DefenseArmy
  3. THREE-DIMENSIONAL VISCOUS FLOW ANALYSIS FOR MOVING BODIES PAST FIXED STRUCTURES

    SBC: Amtec Engineering Inc            Topic: N/A

    THE USE OF COMPUTER CODES THAT SIMULATE FLUID FLOWS IS BECOMING INCREASINGLY IMPORTANT IN THE DESIGN OF AIRCRAFT COMPONENTS. THE CURRENT STATE OF THE TECHNOLOGY OF NUMERICAL SIMULATION OF VISCOUS FLUID FLOWS IS SUFFICIENT FOR DEVELOPING ENGINEERING TOOLS FOR FLOW ANALYSIS OF VARIOUS TYPES OF COMPLEX THREE-DIMENSIONAL FLUID FLOWS. OF PARTICULAR INTEREST ARE FLOWS WITH AERODYNAMIC BODIES PERIODICALL ...

    SBIR Phase I 1987 Department of DefenseArmy
  4. VARIATIONAL EVALUATION OF EM COUPLING TO A WIRE INSIDE A CAVITY

    SBC: Applied Physics Technologies            Topic: N/A

    CONTRACTOR WILL DEVELOP A LAGRANGIAN FORMULATION FOR THE ELECTROMAGNETIC RESPONSE OF A METALLIC ENCLOSURE WITH THIN, SLIGHTLY DIFFUSIVE WALLS AND A WIRE SPANNING THE ENCLOSURE. CONTRACTOR WILL FIRST DERIVE A LAGRANGIAN OPERATOR ON THE FIELDS WHICH IS STATIONARY WHEN MAXWELL'S EQUATIONS ARE SATISFIED. THE LAGRANGIAN WILL THEN BE USED TO DETERMINE THE ENCLOSURE EIGENMODES (WIRE INCLUDED) AND THE AMP ...

    SBIR Phase I 1987 Department of DefenseArmy
  5. EMP ENVIRONMENT PREDICTION FOR COLLIMATED SOURCES

    SBC: Applied Physics Technologies            Topic: N/A

    CODES CURRENTLY EXIST THAT WILL CALCULATE THE ELECTROMAGNETIC ENVIRONMENT (EMP) PRODUCED BY A BEAM OF COLLIMATED GAMMA RAYS. THE COLLIMATION MAY BE EITHER CYLINDRICAL OR CONICAL. THE CURRENT EFFORT WILL BE TO INSTALL THE CODES ON AN ARMY CRAY COMPUTER AND TO SET THEM UP AND RUN THEM FOR PROBLEMS OF INTEREST TO THE ARMY.

    SBIR Phase I 1987 Department of DefenseArmy
  6. DEVELOPMENT OF A HIGH RANGE PARTICLE VELOCITY GAGE

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THERE IS AN ESTABLISHED NEED FOR A SIMPLE ROBUST TRANSDUCER TO MEASURE PARTICLE VELOCITY IN SEVERE BLAST AND SHOCK ENVIRONMENTS SUCH AS NUCLEAR AND HIGH EXPLOSIVE TESTS. A GAGE CONCEPT IS PROPOSED FOR DEVELOPMENT, BASED ON THE PROVEN MEASUREMENT PRINCIPLES USED IN THE HIGHLY SUCCESSFUL DX GAGE, BUT RECONFIGURED MECHANICALLY AND ELECTRICALLY TO WITHSTAND THE HARSH SHOCK ENVIRONMENTS. THE CONCEPT RE ...

    SBIR Phase I 1987 Department of DefenseArmy
  7. DEVELOPMENT OF APPROXIMATIONS FOR A FAST-METHOD OF MOMENTS TECHNIQUE BASED ON NORMAL MODES

    SBC: Electro Magnetic            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  8. SELF-DEVELOPMENT X-RAY FILM

    SBC: Energy Optics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  9. LIGHT-WEIGHT FIELD PORTABLE REMOTE EXPLOSIVES DEPLOYMENT SYSTEM

    SBC: Flow Research Inc            Topic: N/A

    THE PROPOSED PROJECT ADDRESSES THE NEED FOR A SYSTEM TO DEPLOY EXPLOSIVES UNDERGROUND. THE SYSTEM WOULD BE BASED ON A GUIDED HORIZONTAL BORING TOOL CAPABLE OF MAKING EXCAVATIONS UP TO 400 FEET IN LENGTH AT DEPTHS UP TO 7 FEET. THE TOOL USES PRESSURIZED FLUID JETS TO CUT THROUGH A WIDE VARIETY OF SOIL TYPES. THE BORING TOOL COULD BE USED TO EITHER DROP AN EXPLOSIVE DEVICE AT A DESIRED LOCATION OR T ...

    SBIR Phase I 1987 Department of DefenseArmy
  10. FRAME-TO-FRAME COHERENCE APPROACH TO EFFICIENT 3-D ANIMATION

    SBC: Intelligent Systems Research, Inc.            Topic: N/A

    CURRENT 3-D ANIMATION TECHNIQUES INVOLVES SIMPLE SHOWING SEPARATELY PREPARED IMAGES IN A SEQUENCE. THESE TECHNIQUES ARE SOMETIMES CALLED REPEAT-STATIC TECHNIQUES BECAUSE THEY MAKE NO USE OF THE SIMILARITY BETWEEN THE SUCCESSIVE IMAGES IN THE PREPARATION OF THE IMAGES. FOR REALISTIC ANIMATION REQUIRING THOUSANDS OF FRAMES, THE COMPUTATIONAL COST CAN BE PROHIBITIVE, AND THE TURN-AROUND TIME UNACCEPT ...

    SBIR Phase I 1987 Department of DefenseArmy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government