List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. Miniaturization of high average power, high peak power, wide bandwidth antennas

    SBC: XL Scientific, LLC            Topic: A16123

    Verus Research is pleased to respond to the A16-123 Army Phase-II SBIR solicitation. To meet the Armys Phase-II requirements in a risk-mitigated fashion, Verus Research will leverage its innovative Ferengi family-of-antennas technology which was conceived, designed, and experimentally demonstrated by Verus Research under the previous Army-funded Phase-I Base A16-123 SBIR effort. For the proposed P ...

    SBIR Phase II 2019 Department of DefenseArmy
  2. Reactor for Control of Fugitive Emissions of Toxic Gases

    SBC: Coyote Aerospace/high Mesa            Topic: N/A

    A need to control the fugitive emissions of hazardous vapors, volatile organic compounds (VOCs) and hazardous air pollutants (HAPs) has been identified in operations at Army plants and depots. The High Mesa Technologies (HMT)/Coyote Aerospace team proposes to meet this need using proven silent discharge plasma (SDP) techniques, developed by the Electric Power Research Institute and Los Alamos Nat ...

    SBIR Phase I 1997 Department of DefenseArmy
  3. Advanced Armor Vehicle Design

    SBC: Physics Mathematics &            Topic: N/A

    This project applies a combination of Artificial Neural Networks (ANN), Genetic Algorithms (GA), and CAD software to the problem of optimum armor design. Previous work for TACOM has established the efficacy of ANN/GA as applied to the problem of 1-D armor design. This new work will extend the concept to full 3-D vehicle geometries (CAD models). The CAD part of the code will handle the 3D data d ...

    SBIR Phase I 1997 Department of DefenseArmy
  4. Integration of Performance Models Into Virtual Prototyping Environment

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    An opportunity exists for performance models to be integrated into a continuous data flow process receiving data from design tool output and providing results to wargames used for analysis. Design tool outputs an providing results to wargames used for analysis. Design processes specify shape, configuration, materials, function and other required design components to achieve a conceptualized capab ...

    SBIR Phase II 1997 Department of DefenseArmy
  5. Low Temperature Processing of Boron Carbide Cement Composite for Tough, Wear Resistant Structures

    SBC: TPL, INC.            Topic: N/A

    Natural materials such as tooth, bone or shell consist of a high volume fraction of ceramic grains coated by thin layers of proteinaceous film. The ceramic grains are grown in situ in a pre-formed organic polymer matrix. The organic portion provides high toughness, while the ceramic component provides stiffness. This unique microstructure allows for mechanical properties superior to man-made ce ...

    SBIR Phase I 1997 Department of DefenseArmy
  6. VARIATIONAL EVALUATION OF EM COUPLING TO A WIRE INSIDE A CAVITY

    SBC: Applied Physics Technologies            Topic: N/A

    CONTRACTOR WILL DEVELOP A LAGRANGIAN FORMULATION FOR THE ELECTROMAGNETIC RESPONSE OF A METALLIC ENCLOSURE WITH THIN, SLIGHTLY DIFFUSIVE WALLS AND A WIRE SPANNING THE ENCLOSURE. CONTRACTOR WILL FIRST DERIVE A LAGRANGIAN OPERATOR ON THE FIELDS WHICH IS STATIONARY WHEN MAXWELL'S EQUATIONS ARE SATISFIED. THE LAGRANGIAN WILL THEN BE USED TO DETERMINE THE ENCLOSURE EIGENMODES (WIRE INCLUDED) AND THE AMP ...

    SBIR Phase I 1987 Department of DefenseArmy
  7. EMP ENVIRONMENT PREDICTION FOR COLLIMATED SOURCES

    SBC: Applied Physics Technologies            Topic: N/A

    CODES CURRENTLY EXIST THAT WILL CALCULATE THE ELECTROMAGNETIC ENVIRONMENT (EMP) PRODUCED BY A BEAM OF COLLIMATED GAMMA RAYS. THE COLLIMATION MAY BE EITHER CYLINDRICAL OR CONICAL. THE CURRENT EFFORT WILL BE TO INSTALL THE CODES ON AN ARMY CRAY COMPUTER AND TO SET THEM UP AND RUN THEM FOR PROBLEMS OF INTEREST TO THE ARMY.

    SBIR Phase I 1987 Department of DefenseArmy
  8. DEVELOPMENT OF A HIGH RANGE PARTICLE VELOCITY GAGE

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THERE IS AN ESTABLISHED NEED FOR A SIMPLE ROBUST TRANSDUCER TO MEASURE PARTICLE VELOCITY IN SEVERE BLAST AND SHOCK ENVIRONMENTS SUCH AS NUCLEAR AND HIGH EXPLOSIVE TESTS. A GAGE CONCEPT IS PROPOSED FOR DEVELOPMENT, BASED ON THE PROVEN MEASUREMENT PRINCIPLES USED IN THE HIGHLY SUCCESSFUL DX GAGE, BUT RECONFIGURED MECHANICALLY AND ELECTRICALLY TO WITHSTAND THE HARSH SHOCK ENVIRONMENTS. THE CONCEPT RE ...

    SBIR Phase I 1987 Department of DefenseArmy
  9. DEVELOPMENT OF APPROXIMATIONS FOR A FAST-METHOD OF MOMENTS TECHNIQUE BASED ON NORMAL MODES

    SBC: Electro Magnetic            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  10. SELF-DEVELOPMENT X-RAY FILM

    SBC: Energy Optics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government