List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. Miniaturization of high average power, high peak power, wide bandwidth antennas

    SBC: XL Scientific, LLC            Topic: A16123

    Verus Research is pleased to respond to the A16-123 Army Phase-II SBIR solicitation. To meet the Armys Phase-II requirements in a risk-mitigated fashion, Verus Research will leverage its innovative Ferengi family-of-antennas technology which was conceived, designed, and experimentally demonstrated by Verus Research under the previous Army-funded Phase-I Base A16-123 SBIR effort. For the proposed P ...

    SBIR Phase II 2019 Department of DefenseArmy
  2. DEVELOPMENT OF SIMULATIONS TO DETECT IMPAIRED DRIVERS

    SBC: Kunz Associates Inc.            Topic: N/A

    N/A

    SBIR Phase II 1985 Department of DefenseArmy
  3. DEVELOPMENT OF A HIGH RANGE PARTICLE VELOCITY GAGE

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THERE IS AN ESTABLISHED NEED FOR A SIMPLE ROBUST TRANSDUCER TO MEASURE PARTICLE VELOCITY IN SEVERE BLAST AND SHOCK ENVIRONMENTS SUCH AS NUCLEAR AND HIGH EXPLOSIVE TESTS. A GAGE CONCEPT IS PROPOSED FOR DEVELOPMENT, BASED ON THE PROVEN MEASUREMENT PRINCIPLES USED IN THE HIGHLY SUCCESSFUL DX GAGE, BUT RECONFIGURED MECHANICALLY AND ELECTRICALLY TO WITHSTAND THE HARSH SHOCK ENVIRONMENTS. THE CONCEPT RE ...

    SBIR Phase I 1987 Department of DefenseArmy
  4. SELF-DEVELOPMENT X-RAY FILM

    SBC: Energy Optics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  5. PERSONNEL REQUIRE SOME MEANS OF EYE PROTECTION AGAINST VARIOUS TYPES OF LASERS WHILE INVOLVED IN OPERATIONAL SITUATIONS, BUT ALSO NEED TO BE ABLE TO SEE IN A NORMAL MANNER.

    SBC: Delphi Research Inc            Topic: N/A

    PERSONNEL REQUIRE SOME MEANS OF EYE PROTECTION AGAINST VARIOUS TYPES OF LASERS WHILE INVOLVED IN OPERATIONAL SITUATIONS, BUT ALSO NEED TO BE ABLE TO SEE IN A NORMAL MANNER. WE PROPOSE HERE INDIRECT VIEWING SYSTEM CONTAINING A MIRROR WHICH WILL NOT PASS ANY LIGHT INTENSE ENOUGH TO HARM THE EYE BUT WILL OTHERWISE ALLOW NORMAL VIEWING. THE MIRROR WILL BE CONSTRUCTED OF REFLECTIVE THIN FILM AND ORGANI ...

    SBIR Phase I 1985 Department of DefenseArmy
  6. VARIATIONAL EVALUATION OF EM COUPLING TO A WIRE INSIDE A CAVITY

    SBC: Applied Physics Technologies            Topic: N/A

    CONTRACTOR WILL DEVELOP A LAGRANGIAN FORMULATION FOR THE ELECTROMAGNETIC RESPONSE OF A METALLIC ENCLOSURE WITH THIN, SLIGHTLY DIFFUSIVE WALLS AND A WIRE SPANNING THE ENCLOSURE. CONTRACTOR WILL FIRST DERIVE A LAGRANGIAN OPERATOR ON THE FIELDS WHICH IS STATIONARY WHEN MAXWELL'S EQUATIONS ARE SATISFIED. THE LAGRANGIAN WILL THEN BE USED TO DETERMINE THE ENCLOSURE EIGENMODES (WIRE INCLUDED) AND THE AMP ...

    SBIR Phase I 1987 Department of DefenseArmy
  7. EMP ENVIRONMENT PREDICTION FOR COLLIMATED SOURCES

    SBC: Applied Physics Technologies            Topic: N/A

    CODES CURRENTLY EXIST THAT WILL CALCULATE THE ELECTROMAGNETIC ENVIRONMENT (EMP) PRODUCED BY A BEAM OF COLLIMATED GAMMA RAYS. THE COLLIMATION MAY BE EITHER CYLINDRICAL OR CONICAL. THE CURRENT EFFORT WILL BE TO INSTALL THE CODES ON AN ARMY CRAY COMPUTER AND TO SET THEM UP AND RUN THEM FOR PROBLEMS OF INTEREST TO THE ARMY.

    SBIR Phase I 1987 Department of DefenseArmy
  8. CONTOUR DESCRIPTIONS FOR MACHINE VISION

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseArmy
  9. SIMULATION/MODELING OF ROBOTIC VEHICLES ON THE BATTLEFIELD

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    THE RECENT TECHNOLOGICAL ADVANCES IN COMPUTER SYSTEMS, PRIMARILY THOSE RELATED TO INTEGRATED CIRCUITS, HAVE RESULTED IN MOVING THE ROBOTIC SYSTEM FROM THE CONCEPTUAL DRAWING BOARD TO A FEASIBLE SYSTEM WITH SEVERAL PROTOTYPES, SUCH AS THE DARPA AUTOMATED LAND VEHICLE (ALV), CURRENTLY UNDER DEVELOPMENT. AS THESE PROJECTS MOVE FORWARD REMAINING ENGINEERING PROBLEMS ARE BEING SOLVE, AND, IN ALL PROBAB ...

    SBIR Phase I 1987 Department of DefenseArmy
  10. MONITOR FOR AIRBORNE LEAD

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government