You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Intelligent Urgent Stop

    SBC: AUTONOMOUS SOLUTIONS INC            Topic: A18155

    As autonomous vehicles become more prevalent in day-to-day military and industry operations, the technology surrounding functionally-safe autonomous subsystems must become increasingly reliable. A vehicle’s kinetic energy must be safely dissipated during a stop. Steering and braking must be done intelligently to maintain vehicle control and mitigate vehicle wear and tear. There are many factors ...

    SBIR Phase I 2019 Department of DefenseArmy
  2. Light Weight Man-portable High Frequency (HF) Antenna

    SBC: TOTAL QUALITY SYSTEMS, INC.            Topic: A19034

    According to Jane’s, “High Frequency (HF) communication systems are witnessing a resurgence as forward deployed and small unit teams seek to overcome emerging challenges associated with operating in Command and Control Denied or Degraded Environments (C2D2Es)”. According to senior service personnel from across the NATO special operations community, HF communications are being considered by m ...

    SBIR Phase I 2019 Department of DefenseArmy
  3. Transparent Cryogenic Probe Card Based on Silicon Carbide MEMS

    SBC: NIELSON SCIENTIFIC LLC            Topic: A19049

    We propose developing a small pitch probe card with a pitch down to 5 µm that will have minimal thermally induced deformations over an operational temperature range of 77 to 300 Kelvin. The probe card design will contain eight probe points initially, but the number of points can be increased or decreased as needed by the customer. The pitch can also be specified anywhere from 5 µm and up. The pr ...

    SBIR Phase I 2019 Department of DefenseArmy
  4. Non-Explosive Non Nuclear Electro-Magnetic Pulse (EMP) Power Supply

    SBC: LOKI INC            Topic: A19081

    The overall technical objective of the phases of this effort, as stated in the solicitation, is to design and construct compact non-explosive power supplies that can be used to power HPM systems, and to conduct proof-of-principle demonstrations of those supplies. The main goal of our Phase I effort is to determine the technical feasibility of each of our proposed concepts early in the Phase, and t ...

    SBIR Phase I 2019 Department of DefenseArmy
  5. Electric Coolant Pump for High-Temperature Power Generation Cooling Applications

    SBC: ELECTRIC DRIVETRAIN TECHNOLOGIES LLC            Topic: A19091

    OBJECTIVE: The objective of this SBIR effort will be to design, build and demonstrate an experimental coolant pump capable of continuous operation in an engine compartment while pumping coolant at 105°C Programs such as the Advanced Powertrain Demonstrator (APD), the Combat Vehicle Prototype (CVP) and the Next Generation Combat Vehicle (NGCV), as well as other Technology Insertion programs such a ...

    SBIR Phase I 2019 Department of DefenseArmy
  6. Deep Learning Architecture for a Wide Variety of Sensors

    SBC: AUTONOMOUS SOLUTIONS INC            Topic: A19097

    Autonomous Solutions, Inc. is seeking to develop a sensing architecture that fuses information from both deterministic and machine-learned algorithms to provide a sophisticated world model for autonomous vehicle road-following and obstacle detection. This architecture allows for safe and efficient navigation through road networks to accomplish a mission, both in military applications such as AGR a ...

    SBIR Phase I 2019 Department of DefenseArmy
  7. High Fidelity Multi-Dimensional Fire Modeling and Simulation for Composite Structure Response

    SBC: REACTION ENGINEERING INTERNATIONAL            Topic: A17073

    The overall goal of this effort is to quantify the system-level response of structure/shelters to fires. Proposed is a physics-based, multi-dimensional simulation software to quantify the system-level response during fires and to reduce the amount of full-system experimental testing required to ensure personnel safety. An existing REI-developed user interface designed to offer a full suite of tool ...

    SBIR Phase II 2019 Department of DefenseArmy
  8. Reproducible high yield production of structural proteins for biologically-derived fibers as an alternative to nylon

    SBC: Technology Holding, LLC            Topic: A14015

    A novel method for spider silk production is proposed from genetic engineering to fabric production utilizing microbial organisms. Industrially viable process blocks are utilized in each step of the bioprocess to allow for scalability of the overall process towards commercialization. Department of Defense (DoD) and civilian markets have been proven through buy in of DoD entities as well as private ...

    SBIR Phase II 2019 Department of DefenseArmy
  9. High-Temperature Composites for Large-caliber Armament Applications

    SBC: HIFUNDA LLC            Topic: A19004

    To be entered

    SBIR Phase I 2019 Department of DefenseArmy
  10. Dual-Voltage Lithium-Ion 6T Batteries for Low-voltage and High-voltage Applications

    SBC: SPEAR POWER SYSTEMS, INC            Topic: A18096

    The development of a modular, scalable battery system designed to support the Army’s 6T program will substantially reduce life cycle costs to the Army and DoD at large. Spear’s VoltFlex permits 6T lithium ion batteries to operate in either 24V or 48V modes. Spear’s novel switching mechanism identified in Phase I, will be further refined in Phase II and used in conjunction with the 24V and 48 ...

    SBIR Phase II 2019 Department of DefenseArmy
US Flag An Official Website of the United States Government