Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. A NEW TECHNOLOGY CALLED "CHEMICAL PARAMETER SPECTROMETRY" IS MODIFIED TO BE ABLE TO ANALYZE SOLID, LIQUID, AND GASEOUSSAMPLES.

    SBC: Transducer Research Inc.            Topic: N/A

    A NEW TECHNOLOGY CALLED "CHEMICAL PARAMETER SPECTROMETRY" IS MODIFIED TO BE ABLE TO ANALYZE SOLID, LIQUID, AND GASEOUSSAMPLES. THE EXPERIMENTS PERFORMED IN THIS WORK RESULT IN THE DESIGN FOR A PROTABLE INSTRUMENT (BLACK BOX) THAT CAN IDENTIFY VIRTUALLY ALL HAZARDOUS COMMODITIES. THE HAZARD OUS SPILLS IDENTIFICATION SYSTEM IS PORTABLE, FULLY A YAUTOMATED, AND RUGGED. IT WILL IDENTIFY HAZARDOUS SUBS ...

    SBIR Phase I 1985 Department of Transportation
  2. DNA Profiles from Single FIngerprints

    SBC: Independent Forensics of Illinois, LLC            Topic: HSB0151001

    The goal of this project is to develop a validated, commercial quality reagent kit for the reliable collection of fingerprints (i.e., latent ridge impressions) that would subsequently be used for both comparison and DNA profiling. The kit would provide all required materials, reagents, solutions and would include a detailed protocol describing the steps to (i) identify latent ridge impressions (al ...

    SBIR Phase I 2015 Department of Homeland Security
  3. FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE

    SBC: Coin Systems Inc            Topic: N/A

    FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE MIS-HANDLING, EMPLOYEE FRAUD, EMPLOYEE THEFT. THIS STUDY WILL FOCUS ON THE FEASIBILITY OF IMPLEMENTING T THE ELECTRONIC/MICRO PROCESSOR BASED COLLECTION ...

    SBIR Phase I 1985 Department of Transportation
  4. Next Generation Freight Truck for Autorack Cars

    SBC: Sharma & Associates, Inc.            Topic: 151FR3

    Autorack cars transport one of the most valuable commodities – fully assembled Automobiles. Due to the longer and higher profile of an Autorack and the fact that heavy automobiles are loaded on to high deck levels, freight trucks with improved track-to-vehicle dynamics as well as higher speed capabilities are desired in anticipation of higher speed passenger service and shared corridors. Unique ...

    SBIR Phase I 2015 Department of Transportation
  5. Next Generation First Responder Communication Hub

    SBC: Integrated Solutions For Systems, Inc.            Topic: HSB0151005

    As technology advances, First Responders are presented with a growing suite of increasingly sophisticated sensors and communication tools that provide vital, up-to-the-minute situational awareness information about their surroundings, location and status of nearby First Responders, and personal well-being. For example, programs such as the Department of Homeland Security (DHS) Apex Next Generation ...

    SBIR Phase I 2015 Department of Homeland Security
  6. Wireless Compatible Digital Train Line (WiDTL) for Passenger Type Vehicles in a Train Consist

    SBC: Sharma & Associates, Inc.            Topic: 151FR1

    This project seeks to define the performance requirements for a wireless Digital Train Line (WiDTL) through definition of functionality and performance expected, and translating these into network equipment specifications and architecture that wireless network equipment manufacturers can build towards. The effort will include an in-depth review of wireless technology as it applies to sensitive and ...

    SBIR Phase I 2015 Department of Transportation
US Flag An Official Website of the United States Government