You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Blockchain Forensic Analytics

    SBC: Integra FEC LLC            Topic: HSB0191008

    As blockchain technologies continue to evolve and emerge, DHS and numerous other Federal agencies have an increasing need to trace new cryptocurrencies and cryptotokens to support investigations and enforcement actions. Some new cryptocurrencies, such as Zcash and Monero, are designed to provide anonymity to users and thus pose challenges to enforcement agencies looking to track and curtail illici ...

    SBIR Phase I 2019 Department of Homeland Security
  2. Complex Distributed Telephony Denial of Service (TDoS) Defense

    SBC: SECURELOGIX CORPORATION            Topic: HSB0151003

    TDoS is a form of DoS that affects government, enterprise, and small business voice systems. It is the most significant threat to voice systems and by far the most likely form of voice-based DoS. TDoS attackers use SIP, free IP-PBXs, call generators, and spoofed calling numbers to cheaply and anonymously flood their victims with calls. The attackers have the advantage, because attacks are easy to ...

    SBIR Phase I 2015 Department of Homeland Security
  3. Complex Distributed Telephony Denial of Service (TDoS) Defense- FY15 I-CORPS

    SBC: SECURELOGIX CORPORATION            Topic: HSB0151003

    This award is for participation in the I-CORPS Program through DHS SBIR CRPP funds. Basic requirements include: Attend the initial seminar at the prescribed location (three to four days) Attend the closing lessons learned seminar seven weeks later at the identical location as the opening seminar Carry out one hundred face to face interviews with potential customers.

    SBIR Phase I 2015 Department of Homeland Security
  4. Critical Program Information (CPI) Identification and Assessment Tool

    SBC: Management Analysis Network, LLC, The            Topic: SCO183002

    Protecting the effectiveness of US advanced weapon systems and the technology they rely on is a national priority. Unfortunately, individuals tasked with this mission are met with disjointed guidance, no training, and competing processes to consider. It is no wonder adversaries continue to exploit these weaknesses in the Department of Defense (DOD); stealing our Critical Program Information (CPI) ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  5. DNA Profiles from Single FIngerprints

    SBC: Independent Forensics of Illinois, LLC            Topic: HSB0151001

    The goal of this project is to develop a validated, commercial quality reagent kit for the reliable collection of fingerprints (i.e., latent ridge impressions) that would subsequently be used for both comparison and DNA profiling. The kit would provide all required materials, reagents, solutions and would include a detailed protocol describing the steps to (i) identify latent ridge impressions (al ...

    SBIR Phase I 2015 Department of Homeland Security
  6. Electro-optical Seeker

    SBC: POLARIS SENSOR TECHNOLOGIES INC            Topic: OSD181002

    Mission times for high velocity projectiles (HVP) are very short and detection and discrimination of targets must happen quickly and decisively. One way to achieve this is through the enhanced contrast resulting from polarized sensing, which tends to highlight manmade objects and suppress natural background clutter. Thermal polarimetric sensing in a small package has been demonstrated already but ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  7. Electro-optical Seeker Based on HgCdTe Photodetection

    SBC: EPISENSORS INC            Topic: OSD181002

    The capability to reliably and remotely detect and track tactical surface targets in a high-velocity projectile after launch is a critical need. The discrimination of man-made objects can be assisted by the detector technology, with options including two-color detectors and polarimetric filtering in the thermal infrared bands. The level of complexity in the focal plane array affects its survivabil ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  8. High Acceleration and Hypervelocity Inertial Measurement Unit

    SBC: ENGENIUSMICRO LLC            Topic: OSD181001

    Gun-launched applications currently expose inertial measurement units (IMUs) to harsh acceleration, shock, and vibration environments. Furthermore, as they become smarter, they present tighter constraints on size, weight, power, and cost (SWaP-C), while still requiring high levels of performance. New accelerometer technology must reduce SWaP-C while operating through high-g acceleration environmen ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  9. High Acceleration and Hypervelocity Inertial Measurement Unit

    SBC: NANOHMICS INC            Topic: OSD181001

    Nanohmics proposes to develop a chip-scale inertial measurement unit (IMU) for munitions applications. The miniaturization is key to extreme-G survivability and operation. Models and simulations will provide primary support for the feasibility and a hardware demonstration will provide additional proof-of-concept and improve the program risk assessment prior to a Phase II program.

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
  10. High Velocity Gun-Launched Projectile and Sabot Structures

    SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC.            Topic: SCO182003

    The development of a guided hypervelocity projectile (HVP) must surmount a number of significant technical challenges. Texas Research Institute Austin (TRI Austin) proposes to address leading edge/control surface challenges, sabot design, and the sub-projectile issues through the selection of materials, material processes, and component manufacturing methods. TRI Austin has assembled a team of tec ...

    SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government