You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Countermeasures to Covert Access Methods to Reduce Attack Susceptibility and Ensure Trust
SBC: EDAPTIVE COMPUTING INC Topic: OSD09IA2ABSTRACT:Sophisticated methods for infiltrating and compromising computer systems have continuously demonstrated their ability to defeat current operating system and network defenses. Computing assets such as the BIOS, hardware device drivers, and COTS hardware from non-trusted supply chains have been proven to include malware and/or Trojan horse applications. These subversive software programs pr ...
SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense -
High Power Density SOFC Stack
SBC: NEXTECH MATERIALS, LTD. Topic: OSD13EP4Small unmanned aerial systems (S-UAS), unmanned ground systems (UGS), vehicle auxiliary power units (APU), and mobile power generation units require high efficiency power systems capable of operating on logistically available fuels (JP-8, diesel) to enable long endurance operation.In particular, S-UASs in the Group 2 (2155 lbs)/Group 3 ( 150 cm2 active area) in the Phase I and then to the stack le ...
SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense -
Increasing the Specific Power of Epitaxial Lift-Off Solar Cells for Cost-Effective, High-Efficiency, Flexible Photovoltaics
SBC: MICROLINK DEVICES INC Topic: OSD13EP3Photovoltaics (solar cells) are an attractive technology to provide renewable energy sources for forward operating bases, man-portable power sources, and tactical applications. Solar arrays can provide base power greatly reducing the need for logistical fuels, continuous battery recharging for warfighters on the move, and integrated power sources for remote, autonomous systems, e.g. UAVs. To be ef ...
SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense -
Deep Analytics for Data in Cyber-Physical Systems
SBC: EDAPTIVE COMPUTING INC Topic: OSD13LD1Our proposal specifically addresses the stated requirements of the solicitation; we will develop and deploy tools, methods, and models for improving collaboration between human and cyber-physical systems. The proposed HARVEST Phase II solution builds on previous Edaptive Computing, IncInc. (ECI) knowledge and technology itself innovative to create a knowledge discovery system which extracts and ...
SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense -
Non-freezing Portable Vehicle Wash Tunnels
SBC: Integrated Solutions for Systems, Inc. Topic: HSB0121001The Non-Freezing Portable Vehicle Wash Tunnel is a light-weight, portable and cost-effective means of disinfecting vehicles and equipment However, a critical part of the decontamination process that has yet to be addressed is the application of disinfectant chemicals to the inside of livestock transport trailers and the vehicle undercarriage -especially those that have transported potentially infe ...
SBIR Phase II 2015 Department of Homeland Security -
High-Throughput Computer Vision/Etegent Technologies, LTD
SBC: ETEGENT TECHNOLOGIES, LTD. Topic: SCO182007Etegent is proposing an agile hardware platform to enable object detection at extremely high pixel per watt rates and is also capable of quickly incorporating new algorithmic approaches. The core enabling technology of this system is a multicore system on a chip (SoC) server utilizing several low-power COTS processors configured with a high-speed interconnect switch. Etegent has developed a variet ...
SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense -
Critical Program Information (CPI) Identification and Assessment Tool
SBC: Management Analysis Network, LLC, The Topic: SCO183002Protecting the effectiveness of US advanced weapon systems and the technology they rely on is a national priority. Unfortunately, individuals tasked with this mission are met with disjointed guidance, no training, and competing processes to consider. It is no wonder adversaries continue to exploit these weaknesses in the Department of Defense (DOD); stealing our Critical Program Information (CPI) ...
SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense -
Virtual Shooter
SBC: Radiance Technologies, Inc. Topic: HSB0121004The Phase II Virtual Shooter project objective is the design, development, fabrication, assembly, and test of a 6 degree-of-freedom (DOF) device which will fully simulate the recoil reactions of a wide range of human shooters, hand guns, and ammunition types. This program is based on the work now being completed under Phase I of SBIR topic no. H-SB012.1-004, contract number HSHQDC-12-C-00039, revi ...
SBIR Phase II 2015 Department of Homeland Security -
Personal Neutron Detector Based on Cadmium Telluride
SBC: LITHIUM INNOVATIONS COMPANY, LLC Topic: HSB0151009Lithium Innovations will explore the fabrication of a prototype, low-cost neutron detector based on a Li-6 sensitized cadmium-telluride semiconductor detector. The detector will be demonstrated to have high sensitivity to thermal neutrons, be very robust and configured as a pager neutron detector. The effort will build on Lithium Innovations unique expertise in forming lithium sheets for sputter t ...
SBIR Phase I 2015 Department of Homeland Security -
Novel Navigation Sensor Suite for 155 mm Artillery
SBC: ORBITAL RESEARCH INC Topic: OSD181001An affordable suite of sensors will be strategically packaged to produce a reliable, highly accurate and robust IMU capable of surviving the launch and flight environment of a 155mm projectile. This proposed Enhanced Precision IMU (EP-IMU) will be sufficiently small (less than 1.5 cu in), light weight and low power for integration into a 155mm projectile and will provide accurate data measurements ...
SBIR Phase I 2019 Department of DefenseOffice of the Secretary of Defense