You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Nanomachine Device for Semiconductor Process Control Monitoring

    SBC: XALLENT INC.            Topic: None

    Conventional characterization and test methods are increasingly ineffective when applied to structures less than 100 nanometers, causing challenges across R&D, process control and failure analysis. An increasing number of subtle defects become prominent drivers of failure as device size and operating margins decrease, e.g., processing anomalies in thin gate oxides, substrate problems related to do ...

    SBIR Phase I 2019 Department of CommerceNational Institute of Standards and Technology
  2. Combined Cleaning and Guided Wave Inspection System for Hazardous Liquid Pipelines

    SBC: ULC TECHNOLOGIES LLC            Topic: 180PH2

    Pipeline operators employ cleaning tools for improving product throughput, inhibiting corrosion, and preparing their pipes for inline inspection. For many pipeline risk models, improving the scope and quality of input data is a long-term process. If the combined cost of pigging and inspecting was low and could be done simultaneously, pipeline operators would be encouraged to perform inspections mo ...

    SBIR Phase II 2019 Department of Transportation
  3. Parking-Cruising Caused Congestion & Targeting Public Mitigation Investments

    SBC: NELSON/NYGAARD CONSULTING ASSOCIATES, INC.            Topic: 142FH2

    Cruising for parking is a problem that cities have long struggled to address. Recent efforts by the FHWA in San Francisco, Minneapolis, Los Angeles, and other cities have advanced the state of knowledge but large gaps remain. This project seeks to address these important gaps by using GPS traces, GPS-augmented travel surveys, and GPS traces with driver video to quantify the extent of cruising, and ...

    SBIR Phase I 2015 Department of Transportation
  4. A Tool for Building Semantically Interoperable Specification and Standards

    SBC: XSB INC            Topic: 9010273R

    Standards and specifications are widely used in government and industry to define requirements for products and processes and insure interoperability, safety, and quality of industrial and domestic products. Specifications and standards documents almost always cross-reference other standards and specification. Taken together, the web of interdependent standards forms an immensely important knowled ...

    SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology
  5. Using Alternative Energy to Reduce Greenhouse Gas Production in the Transportation Sector

    SBC: INNOVATIVE DYNAMICS INC.            Topic: 142OS1

    IDI is proposing an electrically assisted e-bike system, designed to increase the usage of bicycles for daily commute, specifically targeting areas and demographics with below average bicycle usage, and adverse weather conditions. This design is intended for usage alongside traditional bikes in bike share programs across the country. The primary benefit is attract those otherwise unwilling or unab ...

    SBIR Phase I 2015 Department of Transportation
  6. POST CRASH AIRCRAFT FUEL-FED PREVENTION

    SBC: BELTRAN, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Transportation
  7. DEVELOPMENT OF A CAR BED FOR PREMATURE AND PHYSICALLY DISABLED INFANTS

    SBC: HARTLEY ASSOCIATES, INC.            Topic: N/A

    IT IS A UNIVERSALLY ACCEPTED FACT THAT THE PROPER USE OF WELL DESIGNED INFANT AND CHILD RESTRAINT SYSTEMS CAN SIGNIFICANTLY DECREASE THE RISK OF DEATH AND SERIOUS INJURY IN MOTOR VEHICLE CRASHS INVOLVING NORMAL CHILDREN. HOWEVER,WHEN PREMATURE INFANTS ARE PLACED IN SEMI-RECLINED INFANT SAFETY SEATS THERE IS A POTENTIAL FOR RESPIRATORY COMPROMISE. IN ADDITION, MANY DISABLED INFANTS ARE UNABLE TO TR ...

    SBIR Phase I 1987 Department of Transportation
  8. A PROOF-OF-CONCEPT PROJECT SHOWING FEASIBILITY OF A SEMIAUTOMATIC SYSTEM INTEGRATING ILS, MLS AND EN ROUTE NAVIGATION FOR LIGHT AIRCRAFT IS PROPOSED.

    SBC: Genovese Associates            Topic: N/A

    A PROOF-OF-CONCEPT PROJECT SHOWING FEASIBILITY OF A SEMIAUTOMATIC SYSTEM INTEGRATING ILS, MLS AND EN ROUTE NAVIGATION FOR LIGHT AIRCRAFT IS PROPOSED. THE PURPOSE OF THE SYSTEM IS TO INCREASE NAVIGATION PRESISION AND S D SIMPLICITY, ESPECIALLY IN THE RNAV AND MLS ENVIRONMENTS. THESYSTEM WOULD ALSO ENHANCE AIR TRAFFIC CONTROL CAPACITY, REDUCE PILOT WORKLOAD, AND IMPROVE SAFETY MARGINS. INFORMATION W ...

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government