You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Handheld FT-IR/Photoacoustic Chemical Agent Detector
SBC: MANNING APPLIED TECHNOLOGY Topic: CBD05112Manning Applied Technology proposes development of the MP-100 handheld FT-infrared photoacoustic chemical agent detector, following a highly successful Phase I effort. Chemical attacks and accidents can be mitigated partially by cost-effective sensors. High priority programs will benefit from a sensor compliant to Joint Warning & Reporting Network (JWARN) standards. The device is ideally suited to ...
SBIR Phase II 2006 Department of DefenseOffice for Chemical and Biological Defense -
HYDROGEN GENERATION AND BLANKETING ASSESSMENT FOR SEVERE ACCIDENTS
SBC: ENGINEERING SCIENCE ANALYSIS CORP Topic: N/AN/A
SBIR Phase I 1985 Nuclear Regulatory Commission -
NUCLEAR PLANT DATA BANK (NPDB) PLANT DESCRIPTION DEVELOPMENT
SBC: Ybarrondo & Associates Topic: N/ATHE NUCLEAR REGULATORY COMMISSION (NRC) HAS SPONSORED THE DEVELOPMENT OF THE NUCLEAR PLANT DATA BANK (NPDB) SYSTEM AT TECHNOLOGY DEVELOPMENT OF CALIFORNIA (TDC) FOR APPROXIMATELY THE LAST FIVE YEARS. THIS WORK IS ESSENTIALLYCOMPLETE AND IS AN INTEGRAL PART OF THE NUCLEAR PLANT A (NPA). TO MAKE THE NPDB A USEFUL AND PRODUCTIVE SYSTEM, REPRESENTATIVE DESCRIPTIONS OF NUCLEAR POWER PLANTS MUST BE ENTE ...
SBIR Phase II 1985 Nuclear Regulatory Commission