You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Silicon Carbide (SiC) Foam for Molten Salt Containment in CSP-Gen3 Systems
SBC: TOUCHSTONE RESEARCH LABORATORY, LTD. Topic: 18cPhase I analysis results show that in order to potentially meet the round trip and exergetic efficiencies as required by the Department of Energy’s Solar Energy Technology Office, for thermal energy storage in concentrated solar plants, a composite of porous silicon carbide and molten salt phase change material is needed.For a 100 megawatt (electrical) concentrated solar power plant with 12 hour ...
SBIR Phase II 2019 Department of Energy -
Commercial Solutions for Weather Forecasting
SBC: NEXTGEN FEDERAL SYSTEMS LLC Topic: AF182001Soil moisture is an important parameter for AF weather measurements and forecasting. It impacts Army operations (off-road mobility, land operations) and Intelligence Community’s knowledge (agriculture: social unrest). AF has classified soil moisture measurements and data as a DoD space-based environmental monitoring gap. If unmitigated, the lack of soil moisture data will diminish our asymm ...
SBIR Phase I 2019 Department of DefenseAir Force -
Commercial Solutions for Weather Forecasting
SBC: NEXTGEN FEDERAL SYSTEMS LLC Topic: AF182001The proposed Soil Moisture Advancements from Research to Transition (SMART) solution will adapt IBM’s Physical Analytics Integrated Repository and Services (PAIRS) Geoscope and the Watson Agriculture Package commercial technologies and use them as the basis for a novel Machine-learning (ML) system. SMART will establish a containerized service to build and deliver machine-learned soil moistu ...
SBIR Phase II 2019 Department of DefenseAir Force -
Biometric Enhancement of Army Standard Force Protection Sensors
SBC: AZIMUTH INC Topic: A18127This proposal is aiming to cover the capability gap in the following two main areas. These are (1) the sensitive site exploitation (i.e. screening of biometrics and identity intelligence at the point of capture) and (2) the exploitation of existing traditional and non-traditional sensors, namely using close, i.e. up to 30 feet, long, i.e. 30-1000 feet, and extreme range, i.e. 1000 feet plus, day a ...
SBIR Phase I 2019 Department of DefenseArmy -
Intelligent Multirotor Autonomous Ground Relocatable Sensor (IMAGRS)
SBC: NEXTGEN FEDERAL SYSTEMS LLC Topic: A18022Intelligent Multirotor Autonomous Ground Relocatable Sensor (IMAGRS) is an innovative and highly capable small Unmanned Aircraft System (sUAS) that enables unattended multi-spectral imaging and processing. IMAGRS integrates existing technologies into a micro, transforming multirotor platform which autonomously acts as a relocatable imaging sensor. Critical enabling technologies, such as dual-use c ...
SBIR Phase II 2019 Department of DefenseArmy -
Autonomous Environmental Routing Onboard (AERO)
SBC: NEXTGEN FEDERAL SYSTEMS LLC Topic: A17026The Autonomous Environmental Routing Onboard (AERO) system is an innovative software-hardware solution that performs onboard processing of environmental information from multiple sources to execute autonomous route adjustments for Unmanned Aircraft Systems (UASs). This processing and resulting autonomy minimizes negative environmental impacts while leveraging advantageous conditions for executing ...
SBIR Phase II 2019 Department of DefenseArmy -
Advanced Solid Rocket Motor Technology for Tactical Missiles
SBC: KNOBLEY TECHNICAL ASSOCIATES, LLC Topic: AF112102ABSTRACT:Knobley Technical Associates Phase Il Advanced Solid Rocket Motor Technologies for Tactical Missiles program includes design, analysis, development and testing efforts to define and mitigate technical and operational challengesto be investigated and resolved for successful maturation ofthe performance enhancing burn-rate augment highly loaded propellant grain technology for next generatio ...
SBIR Phase II 2015 Department of DefenseAir Force -
Carbon Foam Lightning and Thermal Protection System
SBC: TOUCHSTONE RESEARCH LABORATORY, LTD. Topic: MDA14014Touchstone proposes to build on past thermal protection system (TPS) efforts and develop an innovative lightweight and low-cost system that provides protection from lightning strikes as well as from heat and atmospheric debris. This will be accomplished by utilizing a lightweight carbon foam (CFOAM) as the foundational material and varying the properties of the foam through choice of precursor an ...
SBIR Phase I 2015 Department of DefenseMissile Defense Agency -
Inferring Mission Perils using Aggregate Cube Thresholds (IMPACT)
SBC: NEXTGEN FEDERAL SYSTEMS LLC Topic: AF151041ABSTRACT:Historically, including weather advice within on-going deliberations and planning has relied largely on a time consuming process of disconnected mental fusion of various sources from different systems to gain a shared understanding of the natural battlespace. The application of weather advice on a near real-time basis has been largely ignored except for very specific missions and location ...
SBIR Phase I 2015 Department of DefenseAir Force -
Lightweight Non-Corrosive Exhaust System
SBC: TOUCHSTONE RESEARCH LABORATORY, LTD. Topic: N151002Touchstone proposes to build on past vehicle exhaust system experience to develop an innovative lightweight, corrosion-resistant, and low-cost system that provides an alternative to the heavy metallic exhaust systems that are currently being used on amphibious assault vehicles and that gives better corrosion performance than the aluminum and composite design envisioned for the EFV. This effort wil ...
SBIR Phase I 2015 Department of DefenseNavy