You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. High Accuracy Mortar Fire Control System

    SBC: PRECISION TARGETING, LLC            Topic: SOCOM172006

    The Precision Targeting High Accuracy Mortar Fire Control System (HAM-FCSt) is a sensor suite and ballistic solution providing equipment that is mounted to the mortar tube and provides the user with real-time critical system information on the fire solution. The intuitive user controls and display system allow the user to focus on the employment of the mortar system and less on the positioning and ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
  2. Next Generation Portable Power Amplifier

    SBC: MAXENTRIC TECHNOLOGIES LLC            Topic: SOCOM131004

    MaXentric proposes the GAU2x2 wideband power amplifier system. The design combines MaXentric’s wideband RF PA technology with advanced digital signal processing in a single small footprint package. This tight integration is made possible through the extremely high efficiency and low power dissipation. Since very little power is dissipated as heat, the package and heat sink size can be minimized. ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
  3. Conformal Appliqué Antennas for Unmanned Aerial Vehicles and Aircraft

    SBC: Wang Electro-Opto Corporation            Topic: SOCOM06002

    This SBIR phase-II proposal is to develop conformal appliqué antennas mounted on Unmanned Aerial Vehicles (UAV) and aircraft for FM/TV broadcast in PSYOPS (psychological-operations). The technical problem is very challenging, especially for that on UAVs, because of the constraints on antenna size and form factor by the platform, and since the gain-bandwidth of an antenna is fundamentally limited ...

    SBIR Phase II 2007 Department of DefenseSpecial Operations Command
  4. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    THE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  5. HIGH SENSITIVITY LANDFILL MONITOR

    SBC: Shonka Research Associates            Topic: N/A

    THE PROPOSED RESEARCH WILL PROVIDE PROOF OF PRINCIPLE OF NEWRADIATION DETECTION TECHNOLOGY THAT WHEN FULLY DEVELOPED WILL PREVENT INADVERTENT DISPOSAL OF RADIOACTIVE MATERIAL INLANDFILLS AND SEWAGES. THE TECHNOLOGY WILL PROVIDE ORDER OFMAGNITUDE IMPROVEMENT IN DETECTION OVER CONVENTIONAL SYSTEMS. THE TECHNOLOGY WILL PROVIDE FIELD RUGGED AND COST COMPETITIVE DEVICES. THE PROPOSED RESEARCH WILL PROV ...

    SBIR Phase II 1992 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government