You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Next Generation Portable Power Amplifier
SBC: MAXENTRIC TECHNOLOGIES LLC Topic: SOCOM131004MaXentric proposes the GAU2x2 wideband power amplifier system. The design combines MaXentric’s wideband RF PA technology with advanced digital signal processing in a single small footprint package. This tight integration is made possible through the extremely high efficiency and low power dissipation. Since very little power is dissipated as heat, the package and heat sink size can be minimized. ...
SBIR Phase II 2019 Department of DefenseSpecial Operations Command -
Seat/Bolster/Other
SBC: ACTIVE SHOCK, INC. Topic: N/AA shock mitigating suspended seat, which places the Special Forces Operator in an optimal ergonomic position, will be developed for use in the NSW 11M RIB. It will feature a semi-actively controlled shock absorber to optimize the suspension for a broadrange of operator weights and sea states. In the Phase I effort, a conceptual design and architecture for both control hardware and software was d ...
SBIR Phase II 2003 Department of DefenseSpecial Operations Command -
Advanced Lightweight NBC Protective Clothing
SBC: UTILITY DEVELOPMENT CORP Topic: N/AN/A
SBIR Phase II 2003 Department of DefenseSpecial Operations Command -
Development of Frequency Hopper/DSSS Detection Algorithms
SBC: Herrick Technology Laboratories Inc. Topic: N/AThe development of a hardware module for installation in DRT Receiver hardware to allow for the real-time detection and identification of FH and DSSS spread spectrum signals using the FDDM algorithm developed under Phase I.
SBIR Phase II 2003 Department of DefenseSpecial Operations Command -
Team Short Range Day/Night Motion Sensors and Display System
SBC: American Creative Machine Enterprise.llc Topic: SOCOM15006ACME and subcontractor OPTICS 1 offer an approach to the Team Short Range Day/Night Motion Sensors and Display System topic called NoMADS. NoMADS, the Networked Motion And Display System, is a networked array of sensor nodes that can be deployed to provide information on the location and movements of enemy personnel outside of the Operators line of sight. At its core NoMADS consists of a sensor ...
SBIR Phase I 2015 Department of DefenseSpecial Operations Command -
SOF Micro Lab
SBC: F&H APPLIED SCIENCE ASSOC., INC. Topic: N/AThe overall goal of this program is to build a compact, lightweight, portable laboratory kit that can be used to analyze chemistries, cell counts, parasites, bacteria, and other pathogens in blood, urine, and body fluids. Our proposed Portable Micro-Lab(PML) kit will be composed of two sub-systems:1) Environmentally stable microdot test strips smaller than a stick of chewing gum and containing th ...
SBIR Phase I 2003 Department of DefenseSpecial Operations Command -
SOF Life Support Monitor
SBC: EXTREME ENDEAVORS AND CONSULTING, LLC Topic: N/ASpecial Operations Command has divided patient care into three phases, evacuation from the hazardous region, triage and transport, and hospital care. A device is required for Phase Two that can sample, monitor and display vital signs, log the parametersin memory for up to twenty-four hours and download vital sign information once the patient has arrived at the medical facility. This system will ...
SBIR Phase I 2003 Department of DefenseSpecial Operations Command -
Battery Modulation for Communications Equipment
SBC: Policell Technolpgies, Inc. Topic: N/APolicell Technologies Inc. proposes 6 month research effort to demonstrate the feasibility of replacing the lithium BA-5590 with a rechargeable battery. It is proposed to design and develop basic pouch lithium-ion cells that are suitable for assembly ofBA-5590 battery and deliver some basic pouch cells to SOCOM by the end of the Phase I program. The battery system will be based on Policell Technol ...
SBIR Phase I 2003 Department of DefenseSpecial Operations Command