You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Data-Driven Technology Discovery Methodologies
SBC: Semandex Networks Inc. Topic: DTRA162005During the Phase I effort, Semandex Networks and its team developed a prototype capability to detect trends in research publications by automatically identifying emerging concepts within the data. The implemented capability provides insights into past and
SBIR Phase II 2019 Department of DefenseDefense Threat Reduction Agency -
Next Generation Portable Power Amplifier
SBC: MAXENTRIC TECHNOLOGIES LLC Topic: SOCOM131004MaXentric proposes the GAU2x2 wideband power amplifier system. The design combines MaXentric’s wideband RF PA technology with advanced digital signal processing in a single small footprint package. This tight integration is made possible through the extremely high efficiency and low power dissipation. Since very little power is dissipated as heat, the package and heat sink size can be minimized. ...
SBIR Phase II 2019 Department of DefenseSpecial Operations Command -
Hybrid Reactive Materials for Thermobaric Weapons
SBC: REACTIVE METALS, INC. Topic: DTRA06010It is proposed to produce and evaluate hybrid powders containing highly reactive filler coated by or embedded into a matrix of readily boiling, combustible binder. The binder material, such as paraffin wax and Viton-like rubber, are expected to ignite and burn within the expanding fireball while the reactive filler remains at the relatively low temperature at which the binder boils, and thus rema ...
SBIR Phase II 2007 Department of DefenseDefense Threat Reduction Agency -
Battery Modulation for Communications Equipment
SBC: Policell Technolpgies, Inc. Topic: SOCOM03013This SBIR Phase II proposal to DOD SOCOM requests $749,985.49 of support for Policell Technologies, Inc. to design and develop a safe rechargeable battery replacement for the Lithium BA-5590 battery to eliminate hazards resulting from water exposure under SOCOM specific missions. This proposal responds to SBIR Topic Number 03-013“Battery Modulation for Communication Equipment”. In addition, a ...
SBIR Phase II 2005 Department of DefenseSpecial Operations Command -
The development of a Single-Event upset immune, re-programmable and non-volatile field programmable gate array (r-NV-FPGA)
SBC: STRUCTURED MATERIALS INDUSTRIES, INC. Topic: MDA03056Radiation tolerant Field Programmable Gate Arrays (FPGA’s) have gained wide and rapid acceptance by military and aerospace equipment suppliers; however, there are presently a limited number of chip-sets available for production and they are limited to one time programming; hence if program changes are subsequently required a backup or chip replacement is required. The lack of FPGA alternatives ...
SBIR Phase II 2005 Department of DefenseDefense Threat Reduction Agency -
Advanced Lightweight NBC Protective Clothing
SBC: UTILITY DEVELOPMENT CORP Topic: N/AN/A
SBIR Phase II 2003 Department of DefenseSpecial Operations Command