You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Robotic Utility Mapping and Installation System (RUMI)

    SBC: Intelligent Automation, Inc.            Topic: 141FH3

    Today, urban underground spaces are shared by multiple utility companies for laying power lines, gas lines, water supply/sewage pipes, fiber-optic cables, etc. The recordings of such buried utilities are often erroneous, inadequate, or outdated (if they ever exist) due to insufficient surveying methodologies and as-built recording practices. Ability to accurately locate and provide awareness of bu ...

    SBIR Phase II 2019 Department of Transportation
  2. An Artificial Intelligence (AI) Based System for Advanced Freeway Data Collection and Analysis

    SBC: Intelligent Automation, Inc.            Topic: 18FH4

    Planned or unplanned traffic events, such as work zones, collision accidents, sporting games and stormy/snowy weather, arise along our roadway systems and affect normal traffic operations. These anomaly events cause various magnitude of traffic congestion and safety impact to road users. Thus, local or regional Traffic Management Centers (TMCs) have spent tremendous amount of resources responding ...

    SBIR Phase II 2019 Department of Transportation
  3. Machine Vision System to Support Vehicle to Infrastructure (V21) Safety Applications

    SBC: Intelligent Automation, Inc.            Topic: 18FH1

    To keep drivers and passengers of vehicles safe, especially in rural areas with limited access to Information and Communications Technology (ICT), the DOT and the commercial automotive industry are keenly interested in machine vision based V2I and CAV technology to perform functions such as navigating assistance in areas where GPS or detailed maps are unavailable, caution and warning systems capab ...

    SBIR Phase II 2019 Department of Transportation
  4. Automated Processing, Exploitation and Dissemination

    SBC: PARRY LABS, LLC            Topic: SOCOM181001

    Parry Labs proposes the continued development of a distributed, scalable, heterogeneous system to perform Automated Processing, Exploitation, and Dissemination (APED) of multi-INT sensor feeds. The system will run as a distributed cluster that employs Serverless function execution and containers to enable the reliable, scalable running of applications. The cluster will employ a peer-to-peer overla ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
  5. Next Generation Portable Power Amplifier

    SBC: MAXENTRIC TECHNOLOGIES LLC            Topic: SOCOM131004

    MaXentric proposes the GAU2x2 wideband power amplifier system. The design combines MaXentric’s wideband RF PA technology with advanced digital signal processing in a single small footprint package. This tight integration is made possible through the extremely high efficiency and low power dissipation. Since very little power is dissipated as heat, the package and heat sink size can be minimized. ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
  6. Rapid Acquisition Demonstrator

    SBC: SURANY RESEARCH AND DEVELOPMENT LLC            Topic: SOCOM181004

    Development of a prototype application that using automation, transforms an initial Government Client statement of need (SoN) through the use of expert systems and a machine learning engine. The final product will transform broader SoN or Statement of Work (SOW) requirements into work products that are able to leverage the RAD Freelancer concept.

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
  7. Rapid Assessment of Air Void System in Fresh Concrete

    SBC: DYNAFLOW, INC.            Topic: 171FH2

    Proposal title: Rapid Assessment of Air Void in System in Fresh Concrete Air void parameters such as specific surface (SS) and spacing factor (SF) are essential in evaluating Freeze-Thaw (F-T) durability in fresh concrete. We have demonstrated the feasibility and viability of using an acoustic method to measure in near real time air void distributions in fresh concrete, the proposed solution is b ...

    SBIR Phase II 2018 Department of Transportation
  8. Innovative CubeSat Payloads for USSOCOM Space Missions

    SBC: A-TECH CORPORATION            Topic: SOCOM17003

    Small satellites have proven capable and cost effective, and innovative payloads and technologies will expand the mission space that CubeSats can support. ATA proposes to build a CubeSat-sized laser communications prototype payload, adapting high photon efficiency optical communications techniques to achieve data transfer rates up to 100 mega-bits per second (Mbps) with the small apertures require ...

    SBIR Phase II 2018 Department of DefenseSpecial Operations Command
  9. Portable Wireless Monitoring Station

    SBC: DIGITAL RECEIVER TECHNOLOGY, INC.            Topic: N/A

    Under phase I of this program, DRT identified a feasible design approach that very nearly meets or exceeds the requirements for this portable wireless receiving system. The critical areas of size, weight, power consumption, performance and ruggedness wereall addressed. Along with major breakthroughs in power and size reduction, the mechanical design was refined to implement an innovative, passiv ...

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
  10. Composite Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    The Phase II effort builds on Phase I. Phase II starts with an integrated product and process design and engineering analysis of the baseline structure described in the Phase I report and variants that may reduce cost and risk. The emphasis is on use ofnonlinear FEA with continuum analysis to handle stiffeners, window frames, and connectors. After review and approval by SOCOM, the design is fab ...

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government