You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Next Generation Portable Power Amplifier

    SBC: MAXENTRIC TECHNOLOGIES LLC            Topic: SOCOM131004

    MaXentric proposes the GAU2x2 wideband power amplifier system. The design combines MaXentric’s wideband RF PA technology with advanced digital signal processing in a single small footprint package. This tight integration is made possible through the extremely high efficiency and low power dissipation. Since very little power is dissipated as heat, the package and heat sink size can be minimized. ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
  2. Innovative CubeSat Payloads for USSOCOM Space Missions

    SBC: A-TECH CORPORATION            Topic: SOCOM17003

    Small satellites have proven capable and cost effective, and innovative payloads and technologies will expand the mission space that CubeSats can support. ATA proposes to build a CubeSat-sized laser communications prototype payload, adapting high photon efficiency optical communications techniques to achieve data transfer rates up to 100 mega-bits per second (Mbps) with the small apertures require ...

    SBIR Phase II 2018 Department of DefenseSpecial Operations Command
  3. Next Generation Portable Power Amplifier

    SBC: MAXENTRIC TECHNOLOGIES LLC            Topic: SOCOM13004

    Special Operations Forces (SOF) currently must carry multiple power amplifiers and associated batteries for all required communications equipment to conduct their missions.These portable power amplifiers and batteries add weight, heat, and bulk to an already burdened SOF operator.Technology advances have realized incremental improvements in each of these three factors but an ideal innovative solut ...

    SBIR Phase II 2016 Department of DefenseSpecial Operations Command
  4. Directed Energy Tactical Mission Analysis Code

    SBC: APPLIED SCIENCES LABORATORY, INC.            Topic: SOCOM03007

    The Directed Energy Tactical Mission Application Code (DETMAC) is a mission planning simulation tool to model directed-energy weapon capabilities, target vulnerabilities, and environmental constraints. It will be used by mission planners to visualize an entire mission timeline and prompt development of optimal tactics, techniques and procedures for successful employment of new weapon capabilities ...

    SBIR Phase II 2005 Department of DefenseSpecial Operations Command
  5. Battery Modulation for Communications Equipment

    SBC: Policell Technolpgies, Inc.            Topic: SOCOM03013

    This SBIR Phase II proposal to DOD SOCOM requests $749,985.49 of support for Policell Technologies, Inc. to design and develop a safe rechargeable battery replacement for the Lithium BA-5590 battery to eliminate hazards resulting from water exposure under SOCOM specific missions. This proposal responds to SBIR Topic Number 03-013“Battery Modulation for Communication Equipment”. In addition, a ...

    SBIR Phase II 2005 Department of DefenseSpecial Operations Command
  6. Alternative Power Sources

    SBC: SmartSpark            Topic: SOCOM04008

    This project will develop fully functional prototypes of a battery-free portable power source that can be deployed in remote, unattended locations. The power source will provide up to five watt-hours per day under extreme weather conditions for a minimum of four years without maintenance. The design relies on solar energy, and uses ultracapacitors for energy storage. A modular interconnect ...

    SBIR Phase II 2005 Department of DefenseSpecial Operations Command
  7. Composite Stuff-Proof Windshield and Lightweight Pilothouse Assembly

    SBC: PACKER TECHNOLOGIES INTERNATIONAL (FORME            Topic: N/A

    The Phase II effort builds on Phase I. Phase II starts with an integrated product and process design and engineering analysis of the baseline structure described in the Phase I report and variants that may reduce cost and risk. The emphasis is on use ofnonlinear FEA with continuum analysis to handle stiffeners, window frames, and connectors. After review and approval by SOCOM, the design is fab ...

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
  8. Advanced Lightweight NBC Protective Clothing

    SBC: UTILITY DEVELOPMENT CORP            Topic: N/A

    N/A

    SBIR Phase II 2003 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government