You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
HIGH RESOLUTION DIGITAL RADIOGRAPHIC NDE OF LAMINAR BONDS IN COMPOSITE MATERIALS USING DISCRETE DETECTORS
SBC: BIO-IMAGING RESEARCH, INC. Topic: N/ATHIS PHASE I SBIR PROGRAM PROPOSES TO DETERMINE THE FEASIBILITY OF USING HIGH-RESOLUTION DIGITAL RADIOGRAPHY (DR), LAMINOGRAPHY, AND COMPUTED TOMOGRAPHY (CT) TO EXAMINE LAMINAR BONDS IN COMPOSITE SAMPLES SUPPLIED BY THE ARMY. THE PROJECT WILL UTILIZE DISCRETE, SOLID-STATE X-RAY DETECTORS DESIGNED AND BUILT BY BIO-IMAGING RESEARCH, INC. THE PHASE I PROGRAM WILL ALSO RECOMMEND A PRELIMINARY DESIGN F ...
SBIR Phase I 1987 Department of DefenseArmy -
LARGE-SCALE SOILS LABORTORY STRESS CELL
SBC: Engineers International Inc Topic: N/ATHE DESIGN AND CONSTRUCTION OF A LARGE SCALE SOIL LABORATORY FACILITY CAPABLE OF IMPOSING AXISYMMETRIC STRESSES UP TO 1,000 PSI ON CYLINDRICAL SOIL SPECIMENS AS LARGE AS THREE METERS IN DIAMETER IS PROPOSED. THE OPTION OF PHASED CONSTRUCTION OF A 1-1/2 METER DIAMETER, FOLLOWED BY CONSTRUCTION OF A THREE METER DIAMETER FACILITY IS OFFERED. THE DESIGN WILL INCLUDE ALL ANCILLARY SPECIAL EQUIPMENT TO ...
SBIR Phase I 1987 Department of DefenseArmy -
INSULAR WAVEGUIDE INTEGRATED MILLIMETER FRONT END FOR FM-CW TYPE RADAR SYSTEMS
SBC: Epsilon Lambda Electronics Corp. Topic: N/AVARIOUS RADAR AND TARGET SEEKER SYSTEMS ARE BEING DEVELOPED TO OPERATE AT MILLIMETER SYSTEMS. LOW COST, HIGHLY RELIABLE FRONT END HARDWARE IS REQUIRED FOR THESE MUNITIONS. DIELECTRIC INSULAR WAVEGUIDE PLANAR INTEGRATED CIRCUITS FOR THIS PURPOSE WERE DESCRIBED INITIALLY BY EPSILON LAMBDA PERSONNEL IN 1970. SOME OF THESE RADARS ARE OF THE FM-CW TYPE, AND THIS PROPOSAL ADDRESSES THE NEED FOR DEMONSTR ...
SBIR Phase II 1987 Department of DefenseArmy -
IMPROVED REPAIR TECHNIQUES FOR FIBER OPTIC CONNECTORS AND CABLES
SBC: Koford Engineering Topic: N/ACURRENTLY A PRIMARY DRAWBACK OF FIBER OPTIC SYSTEMS FOR MILITARY USE IS THE DIFFICULTY OF REPAIRING AND SERVICING THESE SYSTEMS. THE OBJECTIVE OF THIS PROJECT WILL BE TO DEVELOP TECHNIQUES FOR RAPID, RELIABLE FIELD REPAIR OF FIBER OPTIC CONNECTORS AND CABLES, TO PUT MAINTENANCE OF THESE SYSTEMS ON PAR WITH COPPER WIRE INTERCONNECTIONS.TECHNIQUES FOR RELIABLE HIGH PERFORMANCE TERMINATION OF GLASS F ...
SBIR Phase I 1987 Department of DefenseArmy -
DYNAMIC BORESIGHT MENSURATION
SBC: Lsi Inc. Topic: N/AA TECHNIQUE IS PROPOSED WHEREBY THE BORESIGHT ALIGNMENT BETWEEN A HELICOPTER MISSILE OR ROCKET LAUNCH SUPPORT STRUCTURE AND THE REFERENCE SYSTEM CAN BED DETERMINED IN THREE AXES. THE TECHNIQUE EMPLOYS NEWLY-DEVELOPED FAST SCANNING ELECTRO-OPTICAL SENSORS AND FAST SPECIALMICROPROCESSOR SUBSYSTEMS. THE WORKPLAN INCLUDES DESIGN AND EVALUATION OF THE APPROPRIATE ALGORITHMS, SCALED EXPERIMENTS USING A ...
SBIR Phase II 1987 Department of DefenseArmy -
TACTICAL DECEPTION INFRARED SIGNATURE GENERATOR ALTERNATIVES
SBC: Nichols Research Corp Topic: N/AA TWO DIMENSIONAL PANEL WHOSE THERMAL IMAGE (WHEN HEATED BY AN EXTERNAL POWER SOURCE) IS SIMILAR TO AN OPERATING VEHICLE WHEN VIEWED AT DIFFERENT ASPECT AND ELEVATION ANGLES IS PROPOSED. THE PANEL WOULD ACT AS A DECOY FOR THE COMBAT VEHICLE AND SHOULD PROVIDE A CREDIBLE IMAGE TO AN IR SENSOR. IN ADDITION, THE PANEL WILL BE LIGHTWEIGHT, COMPACT AND EASILY DEPLOYABLE.
SBIR Phase I 1987 Department of DefenseArmy -
CERAMIC COMPONENT NON-DESTRUCTIVE TESTING TECHNOLOGY
SBC: Nichols Research Corp Topic: N/AOPTICAL SIGNATURE ANALYSIS WILL BE APPLIED TO MASS-PRODUCTION QUALITY CONTROL OF ENGINEERING CERAMICS. ADAPTATION OF PROVEN EFFECTIVE OPTICAL TECHNIQUES TO MASS PRODUCTION REQUIRES INNOVATION IN RAPID DATA ACQUISITION AND PROCESSING. THE PROPOSED INNOVATION APPLIES STRATEGIC DEFENSE INITIATIVE (SDI) DISCRIMINATION TECHNIQUES. LIFETIME OF CERAMIC WEAR PARTS, SUCH AS BEARING AND CAMS, CAN DEPEND ON ...
SBIR Phase I 1987 Department of DefenseArmy -
PLUME MODELING AND TESTING
SBC: Physicon Inc Topic: N/ATACTICAL MANEUVERING INTERCEPTORS OPERATE IN THE ATMOSPHERE BUT MAY BE AT A HIGH ENOUGH ALTITUDE TO ENCOUNTER FREE MOLECULAR FLOW. PLUME MODELS USED TO SIMULATE VARIOUS CONDITIONS ENCOUNTERED DURING FLIGHT REQUIRE INCREASINGLY COMPLEX COMPUTATIONAL RESOURCES TO ADVANCE THE STATE-OF-THE-ART. AS THESE MODELS BECOME MORE AND MORE COMPLEX THE RESULTS PREDICTED BY THE MODEL ARE NOT EASILY RELATED TO TH ...
SBIR Phase I 1987 Department of DefenseArmy -
FLEXIBLE DYNAMIC IR TARGET
SBC: Remtech Inc. Topic: N/AAN INEXPENSIVE, PROGRAMMABLE, 3-D THERMAL TARGET WHICH SIMULATES THE IR SIGNATURE OF VARIOUS VEHICLES IS NEEDED TO ASSIST IN DESIGNING MISSILE SEEKERS, TAILORING IR SIGNATURES TO IMPROVE STEALTH CHARACTERISTICS OF VEHICLES, AND FOR DEVELOPING IR IMAGERY DEVICES. THE PURPOSE OF THIS PHASE I STUDY IS TO DEVELOP A FEASIBLE (P) PROGRAMMABLE (IR) (T) TARGET (OR "PIRT") DESIGN, AND TO PRODUCE A WORKABLE ...
SBIR Phase I 1987 Department of DefenseArmy -
Next Generation First Responder Communication Hub
SBC: Integrated Solutions for Systems, Inc. Topic: HSB0151005As technology advances, First Responders are presented with a growing suite of increasingly sophisticated sensors and communication tools that provide vital, up-to-the-minute situational awareness information about their surroundings, location and status of nearby First Responders, and personal well-being. For example, programs such as the Department of Homeland Security (DHS) Apex Next Generation ...
SBIR Phase I 2015 Department of Homeland Security