You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACCELERATION HARDENED 84 GHZ TRANSMITTER

    SBC: Epsilon Lambda Electronics Corp.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseAir Force
  2. Accurate and Efficient Computation of Electromagnetic Fields and Waves over Unbounded Regions in 3D

    SBC: COMPUTATIONAL SCIENCES LLC            Topic: AF081001

    The proposed project will rectify the current bottleneck in the simulation of 3D magnetic fields around high-current pulsed power devices. In the existing software, fields in the air are approximated by an artificial magnetic diffusion equation, which is both computationally expensive and nonphysical. The proposed solution avoids any nonphysical quantities and relies on exact conditions for the qu ...

    SBIR Phase I 2008 Department of DefenseAir Force
  3. A Computational Framework for Multiscale Simulations of Weakly Ionized Plasmas

    SBC: CFD RESEARCH CORPORATION            Topic: AF07T022

    The goal of the proposed research is to develop a unified computational framework integrating adequate physical models for simulating complex non-equilibrium plasmas. Plasma dynamics is characterized by disparate spatial and temporal scales each described by appropriate physical models. The project aims to classify possible scenarios and develop general recipes for clustering phase space to dynami ...

    STTR Phase I 2007 Department of DefenseAir Force
  4. Active Resource Manager (ARM)

    SBC: SENTAR, INC.            Topic: OSD05NC5

    The Active Resource Manager (ARM) will perform dynamic decision-making for self-managing networks. To accomplish this, ARM will access information from a wide range of network resources and cyber-defense sensors, and it will use this information to generate and maintain a situation awareness model. The situation model will consist of a structured, dynamic representation of significant situation p ...

    SBIR Phase II 2007 Department of DefenseAir Force
  5. Adapting Information Extraction Technology to Computer-Mediated, Dynamic Text Data

    SBC: Janya Inc.            Topic: AF06050

    The goal of this project is to develop an information extraction (IE) application that can process military chat data. This application will be developed as a version of Janya's existing IE engine, Semantex, with a new chat-specific architecture. This architecture will allow automated monitoring of streaming real-time chat conversation and rapid generation of alerts when objects of interest are ...

    SBIR Phase II 2007 Department of DefenseAir Force
  6. Advanced Analog Micro-lens Technology

    SBC: GRASSMERE DYNAMICS            Topic: AF071003

    This proposal will demonstrate the feasibility of producing diffraction-limited anamorphic microlens arrays for Shack-Hartmann wavefront sensors used on very large aperture astronomical telescopes with multiple off-axis laser guide stars. A high-quality lenslet arrays will be fabricated with gray scale mask lithography and reactive chemical etching. Four advanced gray scale photolithographic mask ...

    SBIR Phase I 2007 Department of DefenseAir Force
  7. Advanced Analog Micro-lens Technology

    SBC: GRASSMERE DYNAMICS            Topic: AF071003

    To better quantify the benefits from the advanced microlens technology developed in the Phase I we plan to have microlenses installed in three astronomical telescopes. In Phase II we are planning to complete the fabrication of the remaining 4 microlenses needed for Gemini telescope and ,also fabricate microlenses for SOR telescopes in New Mexico (NGAS)and Hawaii. This will provide a direct evalua ...

    SBIR Phase II 2008 Department of DefenseAir Force
  8. Advanced Combat Simulation for More Effective Anti-Terrorist Operations

    SBC: John Tiller Software, Inc            Topic: AF07T023

    This proposal is for the development of an architecture for asymmetric and anti-terrorist simulations and the application of that architecture in the design and development of multiple user-friendly, PC-based, artificially intelligent asymmetric combat simulation systems. This effort will utilize a number of existing, mature computer wargames and will focus on enhancements to those game systems u ...

    STTR Phase I 2007 Department of DefenseAir Force
  9. Advanced Combustor Designs Utilizing Inlet Swirl for High Acceleration of Gravity (G) Combustion

    SBC: SPYTEK AEROSPACE CORP            Topic: AF071179

    The recent incorporation of high g combustor designs in gas turbine engines at Spytek Aerospace has presented the need for the further optimization of the compressor/combustor interface (i.e. diffuser). Legacy combustor designs remove the inherent swirl out of the gas stream at the compressor exit, introducing aerodynamic losses and structural weight penalties. High g combustors utilize circumfe ...

    SBIR Phase I 2007 Department of DefenseAir Force
  10. Advanced Combustor Designs Utilizing Inlet Swirl for High Acceleration of Gravity (G) Combustion

    SBC: SPYTEK AEROSPACE CORP            Topic: AF071179

    Spytek Aerospace will soon become a low cost supplier of small high performance gas turbines for expendable UAV military operations, university research centers and hobbyists. During Phase I Spytek Aerospace analytically examined and experimentally assessed two `swirl-maintained' diffuserless high g combustor designs in our ATG-2 combustion rig and engine. Both Phase I concepts feature ultra-low ...

    SBIR Phase II 2008 Department of DefenseAir Force
US Flag An Official Website of the United States Government