You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 15858 results
  1. Development and Commercialization of Novel Two-Color X-ray Photon Counting Pixel Array Detector

    SBC: RAYONIX, L.L.C.            Topic: 09a

    Advanced new and upgraded synchrotron X-ray beamlines and sources are being constructed worldwide, and these facilities require fast new X-ray detectors to complement them and foster new scientific applications. In particular, new detector capabilities are desirable in the time domain, for the study of fast material and molecular kinetics, in the intensity domain for keeping up with brighter X-ray ...

    SBIR Phase II 2018 Department of Energy
  2. Wide dynamic range x-ray Mixed-Mode Pixel Array Detector

    SBC: Sydor Instruments, LLC            Topic: 09a

    Synchrotron light sources and X-ray free electron lasers are now generating shorter pulses with more intense light than ever before possible. The capabilities of these new sources grant unprecedented access into the workings of the natural world. X-ray detectors, as they currently stand, cannot accommodate the large dynamic range of collected x-rays in modern scattering experiments. This capabilit ...

    SBIR Phase II 2018 Department of Energy
  3. "LAPPD Commercialization Fully Integrated Sealed Detector Devices

    SBC: INCOM, INC.            Topic: 38a

    The high energy physics (HEP) community, the scientific and medical communities and the public at large, require the availability of high sensitivity photo- sensors with improved spatial and temporal resolution that can be scaled to large areas, and manufactured in a robust, durable, and compact package at a low cost. Phase I successfully demonstrated the underlying enabling scientific and techni ...

    SBIR Phase II 2014 Department of Energy
  4. Low Cost Transportation Batteries

    SBC: XILECTRIC INC            Topic: 1

    "The US imports over $300 billion dollars of oil every year. Electrification of the US fleet would reduce our dependency on foreign oil and could help curb carbon dioxide emissions through increased renewable energy integration. However, current battery technology is too expensive and offers insufficient range to drive broad market acceptance of electric vehicles. ARPA-E has responded by chall ...

    SBIR Phase II 2012 Department of EnergyARPA-E
  5. Liquefied Gas Electrolytes for Next-Gen EV Batteries

    SBC: SOUTH 8 TECHNOLOGIES, INC.            Topic: 1

    This combined phase SBIR I,II,IIS proposal seeks to develop and demonstrate high power lithium battery cells having up to 330 Wh-kg specific energy with capability to fast charge using a novel Liquefied Gas Electrolyte (LiGas) technology. The LiGas electrolyte uses safe and non-toxic, non-corrosive gasses which are liquefied under moderate pressures and are easily contained in standard cylindrical ...

    SBIR Phase II 2023 Department of EnergyARPA-E
  6. High SYmmetric PowER (HYPER) Battery

    SBC: TYFAST ENERGY CORP            Topic: 1

    This proposal aims to rethink the fundamental design of a high-power lithium-ion battery to realize the combined properties of high energy density, ultrafast charging and long cycle life. The team of Tyfast, 2matls, SpectraPower and UC San Diego have demonstrated electrode breakthroughs, experience in designing fast-charging batteries and use of novel electrolytes to deliver a battery cell exceedi ...

    SBIR Phase II 2023 Department of EnergyARPA-E
  7. PREFAB MODULAR LIQUID-COOLED MICRO DATA CENTER

    SBC: Flexnode Inc            Topic: 1

    "To enable the future needs of efficient computing for edge data centers, Flexnode and its partners, the University of Maryland (UMD), Boeing, Iceotope, SHoP Architects, and Arup, propose to develop a prefabricated modular micro data center with unprecedented energy efficiency and power density. The proposed system leverages four key component and system-level technology advancements: (a) a novel, ...

    STTR Phase II 2024 Department of EnergyARPA-E
  8. Thermally Modulated Solid-State Batteries for Ultra-Safe Fast-Charging Electric Vehicles

    SBC: Ampcera Inc.            Topic: 1

    Heatable solid-state batteries (SSBs) have the potential to enable high energy density and ultra-safe fast charging in electric vehicles (EVs) during cold weather overcoming many of the consumer acceptance barriers hindering widespread adoption. With proper material and system optimization, they are expected to reach desired charging rates of 4C or higher with 80% capacity retention at ambient tem ...

    SBIR Phase II 2023 Department of EnergyARPA-E
  9. Ultramafic Tailings Leaching and Lateritization with Electrolytic Acid Recycling for Critical Metal Recovery and Enhanced Mineral Carbonation

    SBC: Travertine Technologies, Inc.            Topic: 1

    Ultramafic rocks host two resources that are key to avoiding catastrophic climate warming: (1) elements essential for mineral carbonation with gigatonne-scale carbon dioxide removal and sequestration (CDRS) potential, and (2) first-row transition elements including nickel and cobalt that are critical for the renewable energy transition. These elements are chemically bound within solid mineral phas ...

    SBIR Phase II 2023 Department of EnergyARPA-E
  10. Remotely Installed Anchorages for MHK Cost Reduction

    SBC: LITTORAL POWER SYSTEMS, INC.            Topic: 1

    To advance in-current marine and riverine hydrokinetic energy conversion through a step change in levelized cost of energy (LCOE), Littoral Power Systems, Inc. and its team members GE Global Research, European Marine Energy Centre Ltd., National Renewable Energy Laboratory and Eclipse Group, Inc. propose to design, fabricate and test a novel hydrokinetic energy turbine that reduces LCOE by as much ...

    SBIR Phase II 2021 Department of EnergyARPA-E
US Flag An Official Website of the United States Government