You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. VECSEL Based NV Diamond Magnetometry for Brain Machine Interfacing

    SBC: CThru Lasers Inc.            Topic: AF224D028

    Recent interest in high sensitivity magnetic sensing has spurred the development of several technologies, but none are ideal for Magnetoencephalography (MEG) imaging systems.  The development of engineered diamonds with defects such as NV centers has been

    SBIR Phase II 2023 Department of DefenseAir Force
  2. Ultra-Wideband Voltage Controlled Oscillator with Multi-Mode Operations

    SBC: ALPHACORE INC            Topic: DMEA231006

    The U.S. Dept of Defense is seeking a low power (< 30mA @ 3V), US-sourced, ultra-wideband voltage-controlled oscillator (VCO). Fuzing applications that employ Height of Burst (HOB) sensors utilize specialized chipsets that set the operating range and output power for these systems, and different applications require specific parameters given operational environments, input power, form factor, etc. ...

    SBIR Phase I 2023 Department of DefenseDefense Microelectronics Activity
  3. Fast-Response Event-Based Image Sensor and Camera

    SBC: ALPHACORE INC            Topic: X22DOTCSO1

    Event-based cameras are novel sensors that output brightness changes in the form of a stream of asynchronous "events" instead of intensity frames. Compared to conventional image sensors, they offer significant advantages: high temporal resolution, high dy

    STTR Phase II 2023 Department of DefenseAir Force
  4. Light Weight Modular Perception Enhancement (LIMPET) TACFI Sequential Phase II

    SBC: KATALYST SPACE TECHNOLOGIES, LLC            Topic: AF20CTCSO1

    The United States Space Force has identified Space Domain Awareness (SDA) as a critical mission domain to ensure domestic space superiority. Threats posed by passive debris and active counter-space assets are rapidly evolving. Katalyst proposes a TACFI en

    SBIR Phase II 2023 Department of DefenseAir Force
  5. A Prototype for Geosynchronous Satellite Surveillance using Passive RF Collection

    SBC: RINCON RESEARCH CORPORATION            Topic: SF224D007

    As is well noted, GEODSS telescopes are unable to perform their primary space surveillance mission during daytime and weather outages. Passive RF provides a needed augmentation to the GEODSS mission with its ability to maintain custody and support routine

    SBIR Phase II 2023 Department of DefenseAir Force
  6. Mobile Enterprise Readiness and Accountability System (MERAS)- Sequential

    SBC: ADYTON PBC INC            Topic: AF203CSO1

    This proposed TACFI effort will be both a continuation and enhancement of the current Phase II MERAS work - one that would expand the impact and value potential for the Total Force by many multiples. Extensive interaction with End-Users during the previou

    SBIR Phase II 2023 Department of DefenseAir Force
  7. DART: Detector Arrays with high Radiometric accuracy and NIST Traceability

    SBC: ALPHACORE INC            Topic: AF2310008

    In response to Department of defense SBIR topic AF231-008, Alphacore Inc. will develop a versatile Radiometric Calibration system for imaging system calibration using its own proprietary two color infrared readout integrated circuit (ROIC). This ROIC will

    SBIR Phase I 2023 Department of DefenseAir Force
  8. 10X Better Space Solar Power

    SBC: SOLESTIAL, INC.            Topic: AFX235CSO1

    50% of the entire cost to put a million-dollar satellite into orbit comes from the satellite’s solar panels. Even worse, these panels lose 10-15% efficiency each YEAR from radiation exposure. These Chinese manufactured solar panels put U.S. national secur

    SBIR Phase I 2023 Department of DefenseAir Force
  9. Fuel Stability

    SBC: PERCEPTIVE SENSOR TECHNOLOGIES, INC.            Topic: AFX235CSO1

    The Fuel Stability program will enable the Air Force to identify fundamental jet fuel chemical properties in real-time and in the field, for properties such as Thermal Stability. The Fuel Stability model development effort will focus on building a compreh

    SBIR Phase I 2023 Department of DefenseAir Force
  10. Interoperable Cislunar Observation Network (ICON)

    SBC: KATALYST SPACE TECHNOLOGIES, LLC            Topic: AFX23DTCSO1

    The proliferation of space objects and the advancement of adversarial capabilities has created a space domain that is increasingly contested, congested, and complex. In this dynamic threat environment, new approaches to space domain awareness (SDA) that e

    STTR Phase I 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government