You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ANALYSIS OF BALLISTIC RANGE DATA USING ARTIFICIAL INTELLIGENCE
SBC: ARROW TECH ASSOCIATES, INC. Topic: N/ATHE ANALYSIS OF AEROBALLISTIC RANGE DATA IS A TEDIOUS AND TECHNICALLY CHALLENGING TASK. THE SOPHISTICATED ANALYSIS PROCEDURES AND REQUIRED SOFTWARE (COMPUTER PROGRAMS) HAVE BEEN REFINED EXTENSIVELY DURING THE PAST FIFTEEN TO TWENTY YEARS WITH THE ADDITION OF THE SIX-DEGREE-OF-FREEDOM CODES EMPLOYING THE MAXIMUM LIKELIHOOD METHOD. THE REQUIRED PROFICIENCY TAKES BETWEEN THREE AND FIVE YEARS UNDER TH ...
SBIR Phase II 1990 Department of DefenseAir Force -
FEASIBILITY STUDY FOR HIGH-DATA-RATE NONDENIABLE COMMUNICATIONS
SBC: Green Mountain Radio Research Company Topic: N/AMAINTAINING COMMAND-AND-CONTROL COMMUNICATIONS CONNECTIVITY CONTINUOUSLY THROUGH PRE-, TRANS-, AND POST-ATTACK PERIODS IS ESSENTIAL. COMMUNICATION LINKS FOR THIS APPLICATION SHOULD BE NONDENIABLE (BY NUCLEAR DETONATION) AND NONINTERRUPTABLE, AND SHOULD ALSO ALLOW COMMUNICATIONS WHILE IN MOTION AND HIGH DATA RATES. HOWEVER, CONVENTIONAL COMMUNICATION TECHNIQUES ARE ILL SUITED FOR USE IN THIS APPLIC ...
SBIR Phase I 1990 Department of DefenseAir Force