You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Manufacturing Methods for Sulfur Concrete Sewer Pipe
SBC: Brimstone Pipe Company Topic: N/AThis Phase I research is intended to evaluate the feasibility of manufacturing low-cost, acid-resistant sanitary sewer pipe from sulfur concrete. Sulfur is an abundant mineral recovered from coking, natural gas processing, and petroleum refining. Secondary recovery of sulfur, resulting from environmental regulation, produces more material than is needed by U.S. industry. The U.S. Bureau of Mines ...
SBIR Phase II 1998 Environmental Protection Agency -
The Manaufacture of Carbon Black Oils Derived from Scrap Tires
SBC: ADVANCED FUEL RESEARCH, INC. Topic: N/AN/A
SBIR Phase I 1998 Environmental Protection Agency -
IMPROVED POLLUTION CONTROL USING RAMAN SCATTERING GAS ANALYSIS
SBC: Albion Instruments Topic: N/AREAL TIME ON-LINE ANALYSIS OF STACK GASSES IS NECESSARY TO MONITOR EFFLUENTS AND TO PERMIT FEEDBACK CONTROL OF COMBUSTION PROCESS AND DOWN STREAM SCRUBBER SYSTEMS. MULTIMEDIA POLLUTION ANALYSIS REQUIRES MULTIPLE SENSOR TECHNOLOGY WITH PRESENT COMMERCIALLY AVAILABLE INSTRUMENTATION. CURRENTLY, COMPLEX ANALYTICAL SYSTEMS MUSTBE ASSEMBLED THAT ARE EXPENSIVE, PRONE TO DRIFT, AND DIFFICULT TO OPERATE A ...
SBIR Phase I 1989 Environmental Protection Agency -
DESTRUCTION OF ORGANIC HAZARDOUS WASTE BY THE HDI ELECTRIC ARC PROCESS 11490
SBC: Applied Research Associates, Inc. Topic: N/ATHE DESTRUCTION OF ORGANIC HAZARDOUS WASTE BY ELECTRIC ARC PYROLYSIS HAS BEEN DEMONSTRATED TO BE TECHNICALLY FEASIBLE BY OTHERS. THE PRINCIPAL PROBLEMS LIE IN (1) THE SHORT LIFEOF THE ELECTRODES (AND RELATED STRUCTURES) DUE TO THE HIGH TEMPERATURES INVOLVED, AND (2) THE RELATIVELY HIGH COST OF THE ELECTRIC POWER NEEDED. APPLIED RESEARCH ASSOCIATES, INC. PROPOSE TO DESTROY ORGANIC HAZARDOUS WASTE B ...
SBIR Phase I 1989 Environmental Protection Agency -
MEMBRANE PERVAPORATION FOR REMOVAL OF ORGANIC CONTAMINANTS FROM DRINKING WATER SUPPLIES
SBC: BEND RESEARCH, INC. Topic: N/ACONTAMINATION OF THE NATION'S DRINKING WATER SUPPLIES BY HAZARDOUS, SYNTHETIC VOLATILE ORGANIC CHEMICALS (VOCS) IS BECOMING A WIDESPREAD PROBLEM. THIS PROBLEM IS OF GREAT CONCERN WITH RESPECT TO CONTAMINATED GROUNDWATER. GROUNDWATER IS THESOURCE OF DRINKING WATER FOR ABOUT HALF THE NATION. THE EPAESTIMATES THAT UP TO 20% OF THE DRINKING WATER THAT COMES FROM GORUNDWATER CONTAINS VOCS. METHODS FOR ...
SBIR Phase II 1989 Environmental Protection Agency -
NOVEL SENSORS FOR METAL-ION DETECTION AND QUANTIFICATION
SBC: BEND RESEARCH, INC. Topic: N/AMETALS AND METAL COMPLEXES PLAY AN IMPORTANT ROLE IN MANY INDUSTRIAL PROCESSES. DUE TO THE WIDESPREAD AND LARGE-SCALEUSE OF METALS, MONITORING THEIR PRESENCE IN WASTE STREAMS AND CONTROLLING THEIR LEVELS OF DISCHARGE INTO THE ENVIRON-MENT ARE DIFFICULT AND COSTLY TASKS--TASKS THAT ARE ALL THE MORE IMPORTANT GIVEN THE TOXICITY OF MANY COMMONLY USED METALS. CURRENTLY AVAILABLE SENSOR TECHNOLOGY FOR ...
SBIR Phase II 1989 Environmental Protection Agency -
DEVELOPMENT OF IMPROVED COUPLED-TRANSPORT MEMBRANES FOR THE RECOVERY AND RECYCLE OF METAL IONS
SBC: BEND RESEARCH, INC. Topic: N/AVAST QUANTITIES OF INDUSTRIAL ACIDS, BASES, PROCESSING SOLUTIONS, AND SLUDGES CONTAIN HEAVY METALS. THESE ARE OFTEN HAZARDOUS, AND IF LEFT UNREGULATED, PRESENT A SERIOUS THREAT TO GROUNDWATER AND THE SURROUNDING ENVIRONMENT. TECHNOLOGIES AVAILABLE FOR TREATING INDUSTRIAL WASTES ARE TYPICALLY INADEQUATE AND EXTREMELY EXPENSIVE. NEW METHODS ARE CLEARLY NEEDED FOR REMOVING TOXIC METALS FROM PROCESS S ...
SBIR Phase I 1989 Environmental Protection Agency -
A Liquid Absorbent for In-Process Recycling of Ethylene Purge Streams
SBC: BEND RESEARCH, INC. Topic: N/AN/A
SBIR Phase I 1998 Environmental Protection Agency -
Hybrid Electrochemical-Piezoelectric Sensor for RCRA Metals in Water
SBC: BIODE, INC. Topic: N/AN/A
SBIR Phase I 1998 Environmental Protection Agency -
RAPID ENZYME IMMUNOASSAY FOR ENVIRONMENTAL CHEMICAL HAZARDS
SBC: SURMODICS, INC. Topic: N/AMONITORING ENVIRONMENTAL SAMPLES FOR VARIOUS PESTICIDES AND OTHER HAZARDOUS CHEMICALS HAS BECOME NECESSARY INORDER TO PROTECT THE POPULACE FROM THE CARCINOGENIC AND TOXIC EFFECTSOF THESE MATERIALS. THERE IS CONSIDERABLE CONCERN REGARDINGTHE POSSIBILITY OF THE MATERIALS BECOMING INCORPORATED IN FOODS AND IN WATER SUPPLIES DESTINED FOR HUMAN CONSUMPTION. SINCE THE COSTS OF DOING ENVIRONMENTAL ANALYS ...
SBIR Phase II 1989 Environmental Protection Agency