You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A Novel Low Cost, High Efficiency, Algal Biomass Harvest and Dewatering Technology for Biodiesel Production
SBC: ACENT LABORATORIES LLC Topic: N/AGovernments and industry have recently placed significant emphasis on finding affordable renewable fuels to supplement and/or replace fossil fuel use. Biodiesel produced from microalgae has been identified as a highly attractive option for affordable renewable fuel. This project will develop a low cost, high-efficiency algal biomass harvest and dewatering process. In Phase I, a small scale syst ...
SBIR Phase II 2009 Department of Energy -
Improved Superconducting Accelerator System for Next Generation Light Sources
SBC: Advanced Energy Systems, Inc Topic: N/AModern synchrotron light sources have come to rely upon superconducting radio frequency (SRF) acceleration to achieve high luminosity. To date, the workhorse in this area has been the SRF system developed by Cornell in the mid-1990¿s for the CESR-B machine. However, as the quest for higher performance continues, this system is being stretched beyond its design limits. Required increases in inp ...
SBIR Phase II 2009 Department of Energy -
High Power Fundamental Power Coupler for Next Generation Light Sources
SBC: Advanced Energy Systems, Inc Topic: N/AFuture third generation light sources, such as the NSLS-II synchrotron light source proposed for Brookhaven National Laboratory (BNL), push the operating current and subsequent beam power to levels beyond the capabilities of single CESR-B/KEKB cavities. The proposed light source requires 500mA and 1000kW of radiated beam power that must be provided through the power couplers/windows. The develop ...
SBIR Phase II 2009 Department of Energy -
Development of Alternative Reduced-Cost Helium Vessels for ILC Cavities
SBC: Advanced Energy Systems, Inc Topic: N/AThe International Linear Collider (ILC) represents the next great undertaking for the worldwide high energy physics community. In addition to technical challenges posed by the project, the political realities demand a reduction in the cost of the components of this massive facility. The helium vessels that enclose each of the 16,000 superconducting cavities have been identified as a cost driver ...
SBIR Phase II 2009 Department of Energy -
Optically Pumped High Power Solid State Switch
SBC: APPLIED PULSED POWER, INC. Topic: N/AAdvanced high-power solid state switches are desired to improve energy efficiency, increase lifetime, and decrease operating costs of RF accelerators. This project will develop compact, low cost, optically pumped silicon switches that can achieve (1) current risetimes less than 50 ns while operating at up to 10 kA peak current, (2) di/dt > 100 kA/µs, and (3) a capability of blocking >5 kV. The ...
SBIR Phase II 2009 Department of Energy -
A HIGH RANGE PARTICLE VELOCITY TRANSDUCER DEVELOPMENT
SBC: Applied Research Associates, Inc. Topic: N/ATHERE IS AN ESTABLISHED NEED FOR A SIMPLE ROBUST TRANSDUCER TO MEASURE PARTICLE VELOCITY IN SEVERE BLAST AND SHOCK ENVIRONMENTS SUCH AS NUCLEAR AND HIGH EXPLOSIVE TESTS. A GAGE CONCEPT IS PROPOSED FOR DEVELOPMENT, BASED ON THE PROVEN MEASUREMENT PRINCIPLES USED IN THE HIGHLY SUCCESSFUL DX GAGE, BUT RECONFIGURED MECHANICALLY AND ELECTRICALLY TO WITHSTAND THE HARSH SHOCK ENVIRONMENTS. THE CONCEPT RE ...
SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency -
DEVELOPMENT OF A HIGH DYNAMIC RANGE DOWNHOLE SIGNAL CONDITIONING MODULE
SBC: Applied Research Associates, Inc. Topic: N/AHIGH RANGE (200,000 G) ACCELEROMETERS ARE THE ONLY TRANSDUCERS THAT PROVIDE THE REQUIRED LONG-TERM DATA IN THE ENVIRONMENTS OF INTEREST TO THE BLAST AND SHOCK COMMUNITY. THESE GAGES HAVE A VERY LARGE DYNAMIC RANGE AND NOISE OFTEN MASKS THE LATE TIME (BUT EXTREMELY IMPORTANT) DATA. WE PROPOSE TO DEVELOP A CLOSE COUPLED LOGARITHMIC GAIN SIGNAL CONDITIONING SYSTEM THAT WILL CORRECT THE LATE TIME NOIS ...
SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency -
A High Current, High Gradient, Laser Excited, Pulsed Electron Gun
SBC: Brookhaven Technology Group, I Topic: N/A146 A High Current, High Gradient, Laser Excited, Pulsed Electron Gun--Brookhaven Technology Group, Inc., 25 East Loop Road, Stony Brook, NY 11790-3350; (516) 751-7410 Mr. Kenneth Batchelor, Principal Investigator Dr. J. Paul Farrell, Business Official DOE Grant No. DE-FG02-97ER82336 Amount: $71,695 Physics research centers need high intensity, high brightness electron beams to study the effe ...
SBIR Phase II 1998 Department of Energy -
Leveraging Wikipedia to Create a Comprehensive Science & Technology Encyclopedia
SBC: Deep Web Technologies, Llc Topic: N/AThe Department of Energy, particularly through the Office of Scientific and Technical Information (OSTI), provides access to high quality scientific and technical content to scientists, researchers, and the public through a number of science portals. Despite this service, thousands of additional information sources are hard to identify and access; yet, the availability of such sources would lead ...
SBIR Phase II 2009 Department of Energy -
High Performance Hydroxyl Conductive Membrane For Advanced Rechargeable Alcaline Batteries
SBC: Enogetek, Inc. Topic: N/AIncreasingly, strict environmental regulations, surging energy demand and oil prices, and the proliferation of the internet and electronic devices have given rise to a growing market demand for efficient, clean, and renewable energy sources, such as solar and wind energy. However, the electricity generated from these renewable sources suffers from the drawback of fluctuation. To solve this probl ...
SBIR Phase II 2009 Department of Energy