You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High Fidelity Modeling of Building Collapse with Realistic Visualization of Resulting Damage and Debris

    SBC: Thornton Tomasetti, Inc.            Topic: DTRA082005

    The proposed Phase II effort investigates innovative finite element formulations, alternative structural modeling procedures and modern parallel computational strategies to improve the computational performance of high fidelity simulation software for modeling the progressive collapse behavior of blast damaged buildings. Its goal is to reduce the time required to compute and visualize high fideli ...

    SBIR Phase II 2010 Department of DefenseDefense Threat Reduction Agency
  2. A HIGH RANGE PARTICLE VELOCITY TRANSDUCER DEVELOPMENT

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THERE IS AN ESTABLISHED NEED FOR A SIMPLE ROBUST TRANSDUCER TO MEASURE PARTICLE VELOCITY IN SEVERE BLAST AND SHOCK ENVIRONMENTS SUCH AS NUCLEAR AND HIGH EXPLOSIVE TESTS. A GAGE CONCEPT IS PROPOSED FOR DEVELOPMENT, BASED ON THE PROVEN MEASUREMENT PRINCIPLES USED IN THE HIGHLY SUCCESSFUL DX GAGE, BUT RECONFIGURED MECHANICALLY AND ELECTRICALLY TO WITHSTAND THE HARSH SHOCK ENVIRONMENTS. THE CONCEPT RE ...

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  3. DEVELOPMENT OF A HIGH DYNAMIC RANGE DOWNHOLE SIGNAL CONDITIONING MODULE

    SBC: Applied Research Associates, Inc.            Topic: N/A

    HIGH RANGE (200,000 G) ACCELEROMETERS ARE THE ONLY TRANSDUCERS THAT PROVIDE THE REQUIRED LONG-TERM DATA IN THE ENVIRONMENTS OF INTEREST TO THE BLAST AND SHOCK COMMUNITY. THESE GAGES HAVE A VERY LARGE DYNAMIC RANGE AND NOISE OFTEN MASKS THE LATE TIME (BUT EXTREMELY IMPORTANT) DATA. WE PROPOSE TO DEVELOP A CLOSE COUPLED LOGARITHMIC GAIN SIGNAL CONDITIONING SYSTEM THAT WILL CORRECT THE LATE TIME NOIS ...

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  4. DEVELOPMENT OF AN EULERIAN FINITE ELEMENT CODE

    SBC: Intelligent Systems Research, Inc.            Topic: N/A

    CURRENT NUMERICAL COMPUTATIONS TO DESCRIBE NUCLEAR GROUND SHOCK ENVIRONMENTS, NUCLEAR CRATER FORMATION, IMPACT DYNAMICS AND PENETRATION MECHANISMS PRESENTLY EMPLOY EULERIAN-BASED FINITE DIFFERENCE CODES BECAUSE OF THEIR ABILITY TO MODEL THE MASS FLUX PHENOMENA IN TRACKING MATERIAL MOVEMENT THROUGH THE DISCRETIZED SPACE. THE FINITE DIFFERENCE CODES SUFFER IN COMPARISON TO FINITE ELEMENT CODES, HOWE ...

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  5. N/A

    SBC: North Star Research Corp.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseDefense Threat Reduction Agency
  6. NUCLEAR SURVIVABILITY AWARENESS AND TRAINING

    SBC: SCIENCE & ENGINEERING ASSOC., INC.            Topic: N/A

    THE INTENT OF DOD INSTRUCTION 4245.4, "ACQUISITION OF NUCLEAR SURVIVAL SYSTEMS" IS TO PROVIDE FOR NUCLEAR SURVIVABILITY THROUGHOUT THE LIFE CYCLE OF WEAPON SYSTEMS WHICH ARE REQUIRED TO SURVIVE THE EFFECTS OF NUCLEAR WEAPONS. ONE KEY TO IMPLEMENTING THIS INTENT IS TO INSURE THAT ALL THE PEOPLE INVOLVED ARE FAMILIAR WITH THEIR RESPONSIBILITIES TO IMPLEMENT AND PRESERVE THIS SURVIVABILITY. THIS STUD ...

    SBIR Phase II 1988 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government