You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A DIAMOND MICROSTRIP DETECTOR

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    SOLID-STATE IONIZATION DETECTORS INCREASINGLY FIND USE IN MEDICAL, NUCLEAR, AND HIGH ENERGY PHYSICS AND IN MAGNETIC FUSION RESEARCH. UNFORTUNATELY, SILICON-BASED DETECTORS ARE HIGHLY SUSCEPTIBLE TO RADIATION DAMAGE, CAN OPERATE ONLYIN A NARROW TEMPERATURE REGIME, AND HAVE UNDESIRABLE SIGNAL-TO-NOISE RATIOS EVEN AT ROOM TEMPERATURE. A NEW CLASS OF RADIATION-RESISTANT, HIGH TEMPERATURE DETECTORS BAS ...

    SBIR Phase I 1991 Department of Energy
  2. A HIGH EFFICIENCY VAPOR-FED ALKALI METAL THERMAL-TO-ELECTRICCONVERTER SYSTEM FOR DIRECT CONVERSION

    SBC: THERMACORE, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Energy
  3. A MORE ECONOMICAL LOW LOSS NB3SN FOR PULSED FIELD APPLICATIONS, MADE BY A MODIFIED "INTERNAL TIN" PROCESS.

    SBC: Intermagnetics General Corp            Topic: N/A

    THE AIM OF THE PROPOSED WORK IS TO MODIFY THE "INTERNAL TIN"PROCESS TO PROVIDE AN ECONOMICAL, HIGH JC, NB3SN MATERIAL WITH LOW LOSSES IN PULSED FIELD APPLICATIONS. IT WILL BE MANUFACTURED IN THE UNITED STATES TO COMPETE WITH THE OVERSEAS SUPPLIERS OF BRONZE PROCESSED MATERIAL WHICH HAS A HIGHER COST AND LOWER PERFORMANCE CAPABILITY. IGC/ASI HAS BEEN DEVELOPING THE INTERNAL TIN PROCESS FOR THEMANUF ...

    SBIR Phase II 1991 Department of Energy
  4. AN EFFICIENT LAGRANGIAN METHOD FOR THE COMPUTATION OF THREE-DIMENSIONAL REACTIVE FLOWS ON CONCURRENT COMPUTERS

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Energy
  5. AN EFFICIENT X-RAY WAVELENGTH SPECTROMETER FOR IMPROVED ELEMENTAL ANALYSIS ON THE ANALYTICAL ELECTRON MICROSCOPE

    SBC: Peak Instruments Inc.            Topic: N/A

    A NEW TYPE OF WAVELENGTH DISPERSIVE (WD) X-RAY SPECTROMETER IS PROPOSED. ITS ANTICIPATED ATTRIBUTES OF HIGH EFFICIENCY AND SMALL PHYSICAL SIZE MAKE IT SUITABLE FOR USE ON ANALYTICAL ELECTRON MICROSCOPES (AEMS), WHERE CURRENT WD SPECTROMETERS ARE GENERALLY INAPPROPRIATE. PRELIMINARY CALCULATIONS INDICATE THAT THE EFFICIENCY OF THE NEW DEVICE SHOULD BE, AT LOW ANGLES, ABOUT EQUAL TO A 200MM ROWLAND ...

    SBIR Phase II 1991 Department of Energy
  6. AN ELECTRON BOMBARDED SEMICONDUCTOR DEVICE

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Energy
  7. AN IMPROVED METHOD OF INTRODUCING ADDITIONAL ALLOYING ELEMENTS INTO NB3SN IN INTERNAL-TIN PROCESSES

    SBC: Intermagnetics General Corp            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Energy
  8. A PORTABLE, PULSED MHD POWER SUPPLY FOR GEOPHYSICAL MAPPING

    SBC: Coal Tech Corp.            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO APPLY TO GEOPHYSICAL MAPPING A NOVEL POWER SOURCE CONSISTING OF A MAGNETOHYDRODYNAMIC (MHD) GENERATOR DRIVEN BY A CHEMICALLY HEATED, NONEQUILIBRIUM GAS PLASMA. THIS APPLICATION REQUIRES 1 TO 3 MWE POWER PULSES OF 10- TO 30-SEC DURATION REPEATED SEVERAL TIMES PER HOUR. A COMBUSTOR DIRECTLY HEATSTHE MHD WORKING GAS TO CONDITIONS AT WHICH VERY HIGH POWER DENSITIES ...

    SBIR Phase I 1991 Department of Energy
  9. APPLICATION SPECIFIC INTEGRATED CIRCUIT TO IMPROVE RELIABILITY AND POWER QUALITY AND TO REDUCE COST OF PCS CONTROL

    SBC: Abacus Controls, Inc.            Topic: N/A

    POWER CONDITIONERS CURRENTLY IN USE IN PHOTOVOLTAIC COGENERATION INSTALLATIONS DO NOT USE LARGE SCALE INTEGRATION TECHNOLOGY. IT IS THE OBJECTIVE IN PHASE I TO RESEARCH THE FEASIBILITY OF IMPROVING THE ACCURACY, SPEED OF RESPONSE, AND THE RELIABILITY OF A POWER CONDITIONER BY UTILIZING A COMMERCIALLY AVAILABLE ASIC. MANUFACTURING COSTS WILL BE SIGNIFICANTLY REDUCED WITH THE ASIC IMPLEMENTED SAMPLE ...

    SBIR Phase II 1991 Department of Energy
  10. A THERMAL MANAGEMENT SYSTEM FOR A THERMOPHOTOVOLTAIC/GENERALPURPOSE HEAT SOURCE POWER SUPPLY

    SBC: THERMACORE, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Energy
US Flag An Official Website of the United States Government