You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Innovative CubeSat Payloads for USSOCOM Space Missions

    SBC: A-TECH CORPORATION            Topic: SOCOM17003

    Small satellites have proven capable and cost effective, and innovative payloads and technologies will expand the mission space that CubeSats can support. ATA proposes to build a CubeSat-sized laser communications prototype payload, adapting high photon efficiency optical communications techniques to achieve data transfer rates up to 100 mega-bits per second (Mbps) with the small apertures require ...

    SBIR Phase II 2018 Department of DefenseSpecial Operations Command
  2. Rotorcraft Fuel Bladder Weight and Total Ownership Cost Reduction

    SBC: Response Technologies, LLC            Topic: DLA182001

    Response Technologies will attempt to qualify to MIL-DTL-27422Fs phase I performance testing criteria for thefuel cell test cubes[Class BSemi rigid or self-supporting fuel construction, Type ISelf-sealing, and Protection Level CFull self-sealing against 50 caliber and partial self-sealing against 14.5 mm] .Response Technologiesuses an additive manufacturing process that initially creates a textile ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  3. Reverse Engineering of MILSTAR Battery Pack

    SBC: MAINSTREAM ENGINEERING CORP            Topic: DLA182003

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) for the MILSTAR system battery assembly. Mainstream Engineerings unique integration of engineering, manufacturing, quality control, and integrated logistics support (ILS) provides the government with the best value for the proposed NSN.The MILSTAR nickel-metal hydride battery pack lacks sufficient comme ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  4. Heating Hydrating Combat Ration (HHYCOR)

    SBC: MAINSTREAM ENGINEERING CORP            Topic: DLA163001

    There is a critical need in the DLA subsistence supply chain for a convenient and compact device to purify and heat water for the warfighter. Mainstreams HHYCOR device provides a reliable and cost-effective method to increase the warfighters mobility, safety, and operational capability. The HHYCOR device is flameless (no visual signature), and safe (no Class 3 items). In addition, the HHYCOR devic ...

    SBIR Phase II 2018 Department of DefenseDefense Logistics Agency
  5. Reheating Air Inside Diving Equipment and Regulators (RAIDER)

    SBC: PARAGON SPACE DEVELOPMENT CORPORATION            Topic: SOCOM182003

    Military divers are experiencing negative medical side effects from inhalation of cold air or mixed gas (HeO2) while diving with a closed-circuit breathing apparatus.Therefore, SOCOM is looking for an innovative device that will reheat a divers inspired breathing gas to prevent a diver from experiencing hypothermia.Paragon will apply relevant experience in the design and manufacturing of active an ...

    SBIR Phase I 2018 Department of DefenseSpecial Operations Command
  6. Additively Manufactured Inflatable Hulls- Improved Survivability- 20% Total Ownership Cost Reduction

    SBC: Response Technologies, LLC            Topic: DLA152001

    Seam failures of flexible inflatable hulls is the primary reason for failures of military RHIBS and CRCs.These failures are a result of the current manufacturing methods being used, and which have been in place for over fifty years.Whats more, the manufacturing methods and fragmented supply chain of these hulls result in very long and unreliable lead times.These shortcomings impact the survivabili ...

    SBIR Phase II 2018 Department of DefenseDefense Logistics Agency
  7. Additive Manufacturing Process Monitoring and Control Technologies

    SBC: VIBRANT CORP            Topic: DLA181002

    The DLA requires a set of procedures for acceptance of repairs and replacement parts made with additive manufacturing (AM). A critical component of that acceptance procedure will be tools for monitoring and control of AM processes. Vibrant Corporation provides process monitoring and control and nondestructive evaluation (NDE) services based on its Process Compensated Resonance Testing (PCRT) techn ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  8. Source Approval for B-52 Wing to Fairing Seal

    SBC: MAINSTREAM ENGINEERING CORP            Topic: DLA181007

    Increased competition and improved lead times are desired by the Defense Logistics Agency (DLA) for a number of NESO items with annual demand values over $10,000 and fewer than two approved sources. Mainstream Engineerings unique integration of engineering, manufacturing, quality control, and integrated logistics support (ILS) provides the government with the best value for the proposed NSN.The B- ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  9. Additive Manufacturing Process Monitoring and Control Technologies

    SBC: Made In Space, Inc.            Topic: DLA181002

    Made In Space, Inc. (MIS) and Siemens PLM Software propose an integrated Automated Processing. Monitoring, Control and Remediation System (Aul) to provide a process monitoring and control capability. Made In Space, Inc. leads the effort based on integrating Made In Space, Inc., proven inspection sensors systems with a Digital Thread for Additive Manufacturing (DTAM) system, co-developed by Siemens ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  10. IF Conversion System for High-Bandwidth Multiplexed Sensors Arrays

    SBC: ALPHACORE INC            Topic: NA

    Alphacore will develop an Intermediate Frequency (IF) Conversion System for High-Bandwidth Multiplexed Sensors Arrays for NIST’s 2018 solicitation for Exploratory Measurement Science Topic 9.04.02.68. The proposing team has already successfully developed and evaluated a similar printed-circuit board (PCB)-based system for NIST (ROACH2 BLAST-TNG, refer section 1.2). The goal in Phase I is therefo ...

    SBIR Phase I 2018 Department of CommerceNational Institute of Standards and Technology
US Flag An Official Website of the United States Government