You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Thermal Control for Resilient Spacecraft

    SBC: LOADPATH, LLC            Topic: AF103107

    The overall goal of this effort is to support high-power SmallSats by maturing resilient thermal control technologies. Technologies include both Advanced Thermal Model (ATM) software and Resilient Thermal Control (RTC) hardware. The ATM software utilizes a reduced-order modeling (ROM) approach to greatly reduce thermal modeling overhead. New features will be added to the ATM software to enhance it ...

    SBIR Phase II 2018 Department of DefenseAir Force
  2. Bearings for High-Speed Cruise Missile Engine

    SBC: MOHAWK INNOVATIVE TECHNOLOGY, INC.            Topic: AF121169

    ABSTRACT:The overall objective of this proposed effort is to demonstrate bearing technology to meet the requirements for a high performance 1000 lbf thrust gas turbine engine.MiTi and its engine company subcontractor will establish simulator designs of two candidate engines representative of near and longer term applications of the advanced bearings to be demonstrated under this program.The engine ...

    SBIR Phase II 2014 Department of DefenseAir Force
  3. Kitware Image and Video Retrieval (KWIVER) Large Volume Motion Imagery (LVMI) Analytics

    SBC: KITWARE INC            Topic: AF131151

    Large Volume Motion Imagery (LVMI) is currently collected in areas of US military operations to provide data for analysis of patterns of life and for forensic analysis of human activity in the form of vehicular track. The process for analyzing LVMI data is primarily a manual one, but the volume of data collected by LVMI sensors has far exceeded the ability of analysts to completely process; typica ...

    SBIR Phase II 2018 Department of DefenseAir Force
  4. Military PNT Augmentation (MPNTA)

    SBC: A-TECH CORPORATION            Topic: AF141133

    Applied Technology Associates (ATA) proposes a cost-effective solution by developing a robust effective military position, navigation, and timing (PNT) capability with the addition of a military-unique augmentation to GPS.The Military PNT Augmentation (MPNTA) Phase II effort will include the use of Electronic Warfare (EW) techniques (frequency hopping, frequency shift from GPS, wartime reserve, et ...

    SBIR Phase II 2018 Department of DefenseAir Force
  5. Air Riding Thrust Balance System

    SBC: Florida Turbine Technologies Inc.            Topic: NonDOD

    The objective of the air riding thrust balance system is to limit the axial displacement of the rotor relative to the stator.By limiting the axial displacement between rotor and stator the force on the foil bearing can be limited such that it will not be damaged under high maneuver loads or landing loads.A force balance system is created by using a high pressure source air from compressor discharg ...

    SBIR Phase II 2018 Department of DefenseAir Force
  6. Embedded Cognitive Bayesian Prognostic Health Management for RPA Propulsion Systems

    SBC: MANAGEMENT SCIENCES INC            Topic: AF121170

    ABSTRACT: The Air Force is facing severe budget cuts which force the need to cut operating costs of aircraft and manpower. One way to do this is to increase reliability of systems and components which would reduce maintenance and increase operational availability, which reduces the number of aircraft needed to complete missions. The Air Force desires a new prognostic health management (PHM) appro ...

    SBIR Phase II 2014 Department of DefenseAir Force
  7. Vision with a Purpose: Inferring the Function of Objects in Video

    SBC: KITWARE INC            Topic: SB082021

    ABSTRACT: ISR analysts are faced with severe challenges due to the volume of data, the speed at which it arrives, and the variety in sensor signatures and scene content. FMV and WAMI analysts face a fire hose of pixel data. Kitware has developed significant capabilities for ISR video exploitation, with a focus on understanding the function of objects and regions in the scene. These function-bas ...

    SBIR Phase II 2014 Department of DefenseAir Force
  8. A High Power Density Rotary Engine for Unmanned Aerial Vehicles

    SBC: ATS-MER, LLC            Topic: N10AT001

    In Phase I MER demonstrated the superior performance and power-to-weight ratios of the VS-Rotary engine. In Phase II MER will team with the University of Arizona who will provide engine modeling, simulation, and analysis along with advanced precision machining and fabrication. MER will also team with NCE of Tucson to provide test and systems integration development of the engine to the applicatio ...

    STTR Phase II 2014 Department of DefenseSpecial Operations Command
  9. Prognostics Approaches for Remote Piloted Aircraft (RPA) Propulsion and Vehicle Systems in Harsh Environments

    SBC: MANAGEMENT SCIENCES INC            Topic: AF121170

    This is a follow-on SBIR Phase II as a result of a fully executed SBIR Technology Transition Plan to transition MSI’s COgnitive Stochastic MOdeling System (COSMOS) in a microsystem hardware to increase reliability of systems and components which would reduce maintenance and increase operational availability, which reduces the number of aircraft needed to complete missions. ACC and the AFRL ...

    SBIR Phase II 2018 Department of DefenseAir Force
  10. Multi-Source Integrated Cooling Heating and Power System

    SBC: ENERGY QUEST TECHNOLOGIES INC            Topic: AF112219

    ABSTRACT: The purpose of the project is to develop and deliver an integrated cooling, heating, and power system that operates from multiple energy sources can be easily incorporated onto a building similar to a standard air conditioning system. The objective of the project is to build a prototype system that will demonstrate significant reduction in the energy used by a building for heating and ...

    SBIR Phase II 2014 Department of DefenseAir Force
US Flag An Official Website of the United States Government