You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: Aastrom Biosciences, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of Health and Human ServicesNational Institutes of Health
  2. N/A

    SBC: Aastrom Biosciences, Inc.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of Health and Human ServicesNational Institutes of Health
  3. N/A

    SBC: Aastrom Biosciences, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of Health and Human ServicesNational Institutes of Health
  4. N/A

    SBC: Aastrom Biosciences, Inc.            Topic: N/A

    N/A

    SBIR Phase II 2000 Department of Health and Human ServicesNational Institutes of Health
  5. EXPERT SYSTEM FOR JOINING COMPOSITE MATERIALS

    SBC: Abaris            Topic: N/A

    AN EXPERT SYSTEM REQUIREMENTS AND DEVELOPMENT PROGRAM IS PROPOSED TO ACHIEVE AN EXPERT SYSTEM FOR JOINING COMPOSITE MATERIALS. THE NEED IS TO ASSIST DESIGN ENGINEERS TO ACCESS LARGE AMOUNTS OF JOINT DESIGN AND DATA THAT IS AVAILABLE. THE EXPERT SYSTEM WILL PROVIDE ALPHANUMERIC AND GRAPHICS INFORMATION TO THE DESIGNER TO ASSIST IN THE OPTIMUM SELECTION OF COMPOSITE MATERIALS JOINING TECHNIQUES. THE ...

    SBIR Phase I 1989 Department of DefenseNavy
  6. NEW CONCEPTS AND INNOVATIONS TO ENHANCE THE COST ESTIMATION OF AERONAUTICAL SYSTEMS/SUBSYSTEMS

    SBC: Abaris            Topic: N/A

    ABARIS PROPOSES AN EXPERT SYSTEM TO AID THE AVIATION PLANNER AND COST ESTIMATOR IN DEALING WITH THE IMPACT OF NEW MATERIALS AND TECHNOLOGY AVAILABLE FOR THE DESIGN AND SUBSEQUENT MANUFACTURE OF NEW AIRCRAFT. THE NEW ADVANCED COMPOSITES; GRAPHITE AND KEVLAR FIBERS, EPOXY AND BISMALEIMIDE RESINS, ETC., OFFER SIGNIFICANT WEIGHT REDUCTIONS AND OTHER OPERATIONAL ADVANTAGES, BUT REQUIRE DIFFERENT DESIGN ...

    SBIR Phase I 1989 Department of DefenseAir Force
  7. N/A

    SBC: DATAWARE            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  8. N/A

    SBC: (DCS) DIMENSIONAL CONTROL SYSTEMS            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseNavy
  9. 500 Watt Solar AMTEC Power System for Small Spacecraft

    SBC: ADVANCED MODULAR POWER SYSTEMS            Topic: N/A

    The small spacecraft power system proposed in this program provides significant advantages over state-of-the-art systems including: (1) use of a high efficiency (25%-35%) AMTEC, static power conversion system, (2) reduced planform area, and vulnerability, (3) mass efficient phase change material for thermal energy storage during solar eclipse periods, (4) high reliability with no vibration, (5) si ...

    SBIR Phase II 1996 Department of DefenseAir Force
  10. N/A

    SBC: ADVANCED SENSOR TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government