You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DISTRIBUTED INTERACTIVE SIMULATION PROTOCOL EXTENSIONS FOR LOGISTICS SIMULATION

    SBC: MAK TECHNOLOGIES            Topic: N/A

    THIS PROJECT PROPOSES TO INCREASE THE FIDELITY OF LOGISTICS IN DISTRIBUTED INTERACTIVE SIMULATIONS (DIS). THE SIMNET SYSTEM AND PROTOCOLS ARE USED AS A WORKING MODEL. SIMNET (SHORT FOR SIMULATOR NETWORKING) IS A SYSTEM OF NETWORKED COMBAT VEHICLE SIMULATORS DESIGNED FOR COMBINED ARMS TACTICAL TRAINING. THE LOGISTICS PORTIONOF SIMNET IS A LOW FIDELITY MODEL, SUPPLYING THE BARE MINIMUM LOGISTICS SUP ...

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  2. NOVEL SOLID ELECTROLYTES FOR LITHIUM BATTERIES

    SBC: EIC LABORATORIES, INC.            Topic: N/A

    NOVEL CONCEPTS ARE PROPOSED TO PREPARE LI+-CONDUCTIVE SOLID POLYMER ELECTROLYTES WITH IONIC CONDUCTIVITIES OF THE ORDER OF 10-3 TO 10-2 OHM-L.CM-1 AT ROOM TEMPERATURE AND BELOW. HIGH IONIC CONDUCTIVITY IN THESE ELECTROLYTES IS EXPECTED TO RESULT FROM THE USE OF ELECTROLYTE COMPONENTS WHICH ENHANCE THE MOBILITY AND CONCENTRATION OF THE IONIC CHARGE CARRIERS. THE SYNTHESIZED ELECTROLYTES WILL BE CHA ...

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  3. NEW DISCHARGE PUMPING METHOD FOR CO2 LASERS

    SBC: Science Research Laboratory, Inc            Topic: N/A

    A NEW PULSED LASER DISCHARGE CONCEPT IS PROPOSED TO MEET MILITARY AND CIVILIAN REQUIREMENTS FOR EFFICIENT OPERATION OF COMPACT, HIGH ENERGY CO(2) LASERS. THIS DISCHARGE CONCEPT PROMISES PULSE LENGTHS OF UP TO 100 MICROSECONDS DURATION, SCALABILITY TO MULTI-KILOJOULE SINGLE PULSED ENERGY, HIGH VOLUMETRIC EFFICIENCY (> OR = 50 JOULES/LITERATM) AND HIGH ELECTRICAL EFFICIENCY (< OR = 20%). THIS DISCHA ...

    SBIR Phase II 1987 Department of DefenseDefense Advanced Research Projects Agency
  4. EFFICIENT, RELIABLE ARF LASER DRIVERS FOR 193 NM PROJECTION LITHOGRAPHY

    SBC: Science Research Laboratory, Inc            Topic: N/A

    THE OBJECTIVE OF THIS EFFORT IS TO DEVELOP NEW ARF LASER TECHNOLOGY FOR USE IN 193 NM PROJECTION LITHOGRAPHIC SYSTEMS. THESE LITHOGRAPHIC SYSTEMS WILL ENABLE COST-EFFECTIVE FABRICATION OF MILITARY APPLICATION SPECIFIC INTEGRATED CIRCUITS WITH FEATURE SIZES AT OR BELOW 0.25FM. IN THE PROPOSED PROGRAM, NEW ALL-SOLID-STATE ARF LASER DRIVER TECHNOLOGY WILL BE DEVELOPED TO REPLACE THYRATRON-BASED DRIVE ...

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  5. DEMONSTRATION OF CAPABILITY ACCURACY AND VERSATILITY OF A TECHNIQUE FOR HIGH RESOLUTION DOPANT...

    SBC: Recognition Technology Inc.            Topic: N/A

    RECOGNITION TECHNOLOGY, UNDER THE DIRECTION OF THOMAS BUSHMAN - PRINCIPAL INVESTIGATOR, WITH MASSACHUSETTS INSTITUTE OF TECHNOLOGY CONSULTANTS, DR. AUGUST WITT AND DR. DOUGLAS CARLSON, PROPOSE THE ESTABLISHMENT OF NIR ABSORPTION AND COMPLEMENTARY PHOTOLUMINESCENCE IMAGING CAPABILITY FOR THE NEAR REAL TIME, NONDESTRUCTIVE DOPANT CHARACTERIZATION OF ELEMENTARY AND COMPOUND SEMICONDUCTOR WAFERS IN A ...

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  6. RAPID MODELING, SCHEDULING, AND REAL-TIME CONTROL OF SEMICONDUCTOR FACTORIES

    SBC: NETWORK DYNAMIC, INC.            Topic: N/A

    THIS PROPOSAL RESPONDS TO THE STATED GOALS OF DARPA SBIR TOPIC 91-181 BY PROPOSING THREE NOVEL APPROACHES: (A) DEVELOP RAPID MODELING TECHNOLOGY (RMT) TOOLS FOR DESIGN, PLANNING, AND DECISION SUPPORT OF SEMICONDUCTOR FACTORIES, (B) RECOGNIZING THE MULTIPRODUCT COMPLEXITY IN SEMICONDUCTOR MANUFACTURING, DEVELOP SCHEDULING TOOLS BASED ON LAGRANGIAN RELAXATION TECHNIQUES WITH SIGNIFICANT POTENTIAL AD ...

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  7. ELECTRICALLY CONTROLLABLE REFLECTIVITY/TRANSMISSIVITY OF VISUAL AND INFRARED WITH COATED THIN FILM

    SBC: Display Science Inc.            Topic: N/A

    N/A

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  8. SUPERCRITICAL FLUID PROCESSING OF AEROGELS

    SBC: CF Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  9. PROBE PARTICLES FOR IN-SITU DIRECT MEASUREMENT OF VORTICITY VECTORS

    SBC: PHYSICAL SCIENCES INC.            Topic: N/A

    SCIENTISTS AT PHYSICAL SCIENCES, INC. HAVE DEVELOPED AN OPTICAL TECHNIQUE, KNOWN AS THE VORTICITY OPTICAL PROBE, OR VOP, FOR DIRECTLY MEASURING VORTICITY VECTORS IN WATER FLOWS. THE VORTICITY OPTICAL PROBE OPERATES BY SEEDING INTO LIQUID FLOW TRANSPARENT SPHERICAL PARTICLES THAT ARE TENS OF MICRONS IN DIAMETER WITH EACH CONTAINING ONE OR MORE EMBEDDED LEAD CARBONATE CRYSTALS THAT ACT AS PLANAR REF ...

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  10. VORTICITY OPTICAL PROBE DEVELOPMENT: PARTICLE MANUFACTURING TECHNOLOGY AND APPLICATIONS

    SBC: PHYSICAL SCIENCES INC.            Topic: N/A

    N/A

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government