You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. INFRARED SENSOR AND IMAGING SYSTEM

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    N/A

    SBIR Phase II 1992 Department of DefenseMissile Defense Agency
  2. MICROWAVE PROPAGATION

    SBC: METRATEK, INC.            Topic: N/A

    THIS PROPOSAL ADDRESSES PHASE I OF AN EFFORT TO PROVIDE COMPREHENSIVE QUANTITATIVE MEASUREMENTS OF MICROWAVE PROPAGATION AT LOW ALTITUDES (I.E., BELOW SEVERAL HUNDRED FEET) ABOVE THE SURFACE OF THE OCEAN. THE OVERALL OBJECTIVE OF THE EFFORT IS TO PROVIDE EXPERIMENTAL DATA FOR USE IN THE VERIFICATION OF EXISTING COMPUTER PROGRAM MICROWAVE PROPAGATION MODELS. THE PROPOSED APPROACH DRAWS UPON AN EXIS ...

    SBIR Phase II 1992 Department of DefenseNavy
  3. Phase separated enzyme inhibitor electrode for mercury compounds

    SBC: ALDERON BIOSCIENCES, INC.            Topic: N/A

    MERCURY IS A HIGHLY TOXIC MATERIAL THAT OCCURS IN BOTH ORGANIC AND INORGANIC FORMS. BECAUSE OF ITS WIDESPREAD INDUSTRIAL USE THE WHOLE POPULATION IS EXPOSED TO MERCURY COMPOUNDS EVERYDAY. THERE IS A NEED FOR A FAST, EASY TO USE, INEXPENSIVE, SENSITIVE METHOD FOR THE DETECTION OF MERCURY TO REDUCE THE RISK OF CHRONIC EXPOSURE. OUR OBJECTIVE IS TO DEVELOP A NEW TECHNIQUE FOR THE SELECTIVE DETECTION ...

    SBIR Phase II 1992 Department of DefenseArmy
  4. HIGH-RESOLUTION WAVEFORM LFAA ACOUSTO-OPTIC SONAR PROCESSOR

    SBC: Signal Corp.            Topic: N/A

    THE WORK PROPOSED INVOLVES A NEW PROPRIETARY, HIGH THROUGHPUT,ACOUSTO-OPTIC SIGNAL PROCESSING TECHNIQUE WHICH WILL ENHANCE THE NAVY-S FUTURE WARFARE CAPABILITIES IN UNDERSES SURVEILLANCE AND ASW. WEPROPOSE TO DEVELOP AN ACOUSTO-OPTIC SONAR CORRELATOR THAT CAN EASILY PROVIDE THE EQUIVALENT OF 50 GFLOPS OF DOPPLER CHANNEL CORRELATION SEARCH PROCESSING AT LOW COST, SMALL SIZE, AND LOW POWER. THIS NEW ...

    SBIR Phase II 1992 Department of DefenseNavy
  5. URBAN WARFARE DIGITAL DATABASE

    SBC: Mrj Inc.            Topic: N/A

    THE DEPARTMENT OF DEFENSE HAS IDENTIFIED THE INCREASING LIKELIHOOD OF COMBAT IN URBAN ENVIRONMENTS. RECENT YEARS ARE RICH WITH EXAMPLES OF THE MILITARY'S NEED TO PERFORM SUCCESSFULLY IN BUILT-UP AREAS. THE LOGISTICS REQUIREMENTS UNIQUE TO A MILITARY OPERATION IN AN URBAN AREA CALL FOR CAREFUL PLANNING AND WELL TRAINED, WELL REHEARSED FORCES. CREATING A THREE-DIMENSIONAL MODEL OF THE AREA OF INTERE ...

    SBIR Phase II 1992 Department of DefenseArmy
  6. PROTOTYPE COMPUTER AIDED TOOL FOR C3I ARCHITECTURE DESIGN

    SBC: Trident Systems Incorporated            Topic: N/A

    THE CONTINUING EVOLUTION OF NAVAL WARFARE SYSTEM C3I REQUIREMENTS HAS REMAINED AHEAD OF THE MODELING CAPABILITIES OF THE STANDARD NAVY TOOLS FOR THE PAST SEVERAL GENERATIONS. NAVY SYSTEMS ENGINEERS REQUIRE A TOOL WHICH ALLOWS THEM TO EFFICIENTLY CAPTURE AND ANALYZE CANDIDATE C3I HARDWARE AND SOFTWARE DESIGNS WHICH ARE PROPOSED FOR REAL-TIME FEDERATED AND/OR DISTRIBUTED WARFARE SYSTEMS ARCHITECTURE ...

    SBIR Phase II 1992 Department of DefenseNavy
  7. TERNARY KEYBOARD CONCEPT EVALUATION

    SBC: Vatell Corporation            Topic: N/A

    PROPOSAL TO CONTRUCT PTOTOTYPE AND TEST CONCEPT FOR TERNARY KEYBOARD WHICH MIGHT BE GENRALLY USEFUL FOR DATA ENTRY. KEYBOARD IS UNCONVENTIONAL IN CONSTRUCTION AND CAN ONLY BE EVALUATED EXPERIMENTALLY BECAUSE HUMAN FACTORS WILL REGULATE ITS UTILITY.

    SBIR Phase II 1987 Department of DefenseNavy
  8. INTEGRATED TRAINING SYSTEM ARCHITECTURE IN SUPPORT OF ACTIVE SONAR SYSTEMS

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    THE U.S. FLEET MUST DEPLOY MOBILE ACTIVE SONAR SURVEILLANCE ASSETS, INCLUDING MONOSTATIC, BISTATIC, AND MULTISTATIC PLATFORMS. CRITICAL TO EFFECTIVE EMPLOYMENT OF THESE ASSETS IS THE AVAILABILITY OF A TRAINING PROCESS WHICH EFFECTIVELY ADDRESSES THE UNIQUE NEEDS OF MOBILE ACTIVE SONAR PERSONNEL. THIS RESEARCH AND DEVELOPMENT PROJECT WILL DEVELOP AN INTEGRATED TRAINING SYSTEM ARCHITECTURE DERIVEDFR ...

    SBIR Phase II 1992 Department of DefenseNavy
  9. PERFORMANCE ANALYSIS TOOLS

    SBC: Vance Systems Inc.            Topic: N/A

    THIS PROPOSAL DEMONSTRATES THE REQUIREMENT FOR AND ADDRESSES THE DEVELOPMENT OF A MODEL OF AN IEEE 802.4 TOKEN PASSING BUS PROTOCOL WHICH OPERATES IN REAL TIME. THE ADVANTAGE OF THE REAL TIME APPROACH IS THAT IT EXTENDS THE EFFECTIVE LIFE OF THE MODEL TO INCLUDE NOT ONLY THE SYSTEM DESIGN PHASE, BUT ALSO THE SYSTEM MODIFICATION AND UPGRADE PHASES WHICH TYPICALLY OCCUR DURING THE LIFE CYCLE OF MILI ...

    SBIR Phase II 1987 Department of DefenseNavy
  10. INTELLIGENT RDT&E MANAGEMENT INFORMATION SYSTEMS

    SBC: Strata Various Product Design            Topic: N/A

    THIS PROPOSAL IS TO CREATE A PROTOTYPE INTELLIGENT RDT&E MANAGEMENT INFORMATION SYSTEMS USING ARTIFICIAL INTELLIGENCE TECHNIQUES, IBM-PC'S AND COMMERCIALLY AVAILABLE SOFTWARE. THE SPECIFIC TECHNICAL OBJECTIVE OF THIS EFFORT IS TO CREATE PROTOTYPE NETWORK STRUCTURE SUITABLE FOR EXPERT SYSTEM DEVELOPMENT, DEMONSTRATE PROBLEM SOLVING PROCEDURES USING THIS NETWORK STRUCTURE, AND ASSESS THE FEASIBILITY ...

    SBIR Phase II 1992 Department of DefenseNavy
US Flag An Official Website of the United States Government