You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Accurate Ranging and Time Transfer (ARTT)

    SBC: Setter Research, Inc.            Topic: A19025

    The Global Positioning System (GPS) has revolutionized military operations by providing global access to high-quality position, navigation, and time (PNT) data. Along with the rise in GPS usage has been a parallel increase in threats to GPS data availability. GPS signals are easily jammed due to their low signal power and fixed frequency of operation. Spoofing attacks threaten military systems bei ...

    SBIR Phase I 2019 Department of DefenseArmy
  2. A COMPACT LIGHTWEIGHT AND RUGGED VOLTAGE MULTIPLIED HOMOPOLAR GENERATOR FOR RELIABLE HIGH SPEED...

    SBC: InterScience, Inc.            Topic: N/A

    AS ELECTRONICS BECOME SMALLER THROUGH MINIATURIZATION, THE ABILITY TO FLY ELECTRONIC PACKAGES OVER LARGE DISTANCES IS BECOMING MORE LIMITED BY THE LACK OF GENERATORS DESIGNED TO OPERATE IN THE LOW POWER, HIGH RPM RANGE. IN RESPONSE TO THIS PROBLEM, A PROGRAM TO DEVELOP A VOLTAGE MULTIPLIED HOMOPOLAR GENERATOR (VMHPG) IS PROPOSED. THE SYSTEM IS BASED ON THE WELL KNOWN HOMOPOLAR GENERATOR PRINCIPLE ...

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  3. ACT-BASED SIGINT RECEIVER 1F SIGNAL PROCESSOR

    SBC: Lnr Communications Inc.            Topic: N/A

    N/A

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  4. Adaptive Radio for RObotic Warfare (ARROW)

    SBC: Andro Computational Solutions LLC            Topic: A18153

    Reliable communication system is the backbone of every tactical mission. From deployed troops to law enforcement officials, lack of reliable communication increases risk and compromises safety. These challenges are further exacerbated when unmanned ground robot vehicles are operated in urban scenarios with severe multipath due to cluster of buildings along with active transmissions from unfriendly ...

    SBIR Phase I 2019 Department of DefenseArmy
  5. ADVANCED AI TECHNIQUES FOR MULTIACUITY ATR

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    A FUNDAMENTAL PROBLEM IN AUTOMATIC TARGET RECOGNITION (ATR) IS THE OVERWHELMING AMOUNT OF SENSOR DATA WHICH MUST BE PROCESSED. MANY ADVANCED ATR ALGORITHMS WHICH REDUCE THE FALSE ALARM RATE CANNOT BE EXECUTED IN REAL TIME DUE TO COMPUTATIONAL COMPLEXITY. THIS LIMITS OVERALL SYSTEM PERFORMANCE. IN ATR, THE FEATURES THAT MUST BE RESOLVED ARE LOCALIZED WITHIN THE FIELD-OF-VIEW (FOV) OF THE SENSOR. UN ...

    SBIR Phase II 1992 Department of DefenseAir Force
  6. Advanced Artillery & Mortar personnel Blast Gauge System

    SBC: Blackbox Biometrics, Inc.            Topic: A18078

    B3 proposes to develop and build a prototype sensor that can be used to track individual BOP exposure from artillery. The technical objectives will be accomplished over a two-year period of performance (PoP), which include the base (Year 1) and option period (Year 2). The base will result in an alpha prototype, of which five (5) sets will be delivered to PEO Ammo. The alpha will be tested using B3 ...

    SBIR Phase II 2019 Department of DefenseArmy
  7. ADVANCED FUEL CELLS

    SBC: Treadwell Corp            Topic: N/A

    THE MOST CRITICAL ASPECT OF THE RADIO FREQUENCY POWER SUPPLY FOR THE NEUTRAL PARTICLE BEAM INTEGRATED EXPERIMENT IS ITS POWER TO WEIGHT RATIO. IN ADDITION, THE SPACE-QUALIFIED 45V POWER SUPPLY MUST BE ABLE TO SUPPLY 27,000 AMP PULSES DOWN TO 350 MICROSECONDS WITH ONLY A 2 - 3% VOLTAGE DROP. PROTON EXCHANGE MEMBRANE FUEL CELLS HAVE POTENTIALLY THE HIGHEST POWER TO WEIGHT RATIO OF ANY TYPE OF FUEL C ...

    SBIR Phase I 1987 Department of DefenseAir Force
  8. ADVANCED GUN BARREL DESIGN

    SBC: Veritay Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseNavy
  9. A HIGH POWER THERMAL BATTERY

    SBC: Technochem Company            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseNavy
  10. A HIGH SPEED SOLDER PASTE PRINTER FOR SURFACE MOUNT APPLICATIONS

    SBC: Schuyler Dynamics, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1992 Department of DefenseArmy
US Flag An Official Website of the United States Government