You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Applications of AI to ensemble forecasts of compound extreme weather events in support of operational adaptation of electric utilities
SBC: CLIMATE FORECAST APPLICATIONS NETWORK, LLC Topic: 91We propose a high-impact innovation for weather forecasting that integrates global ensemble weather forecasts with an AI-driven post-processing model of extreme weather indices. This innovation will provide the basis for skillful probabilistic forecasts of compound extreme weather events at extended lead times. Extreme weather/climate events of relevance to electric utilities focused on in Phase I ...
SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration -
Enhanced Ride Performance- M997A3 Chassis
SBC: ROD HALL LICENSED PRODUCTS, LLC Topic: A224005Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
Armament System AI Data Logger & Architecture
SBC: ALTRON, INC. Topic: A224002Redacted
SBIR Phase II 2023 Department of DefenseArmy -
BeaverFit
SBC: BEAVERFIT NORTH AMERICA LLC Topic: A234005Proposed Approach: BeaverFit seeks to satisfy the requirements of this proposal and subsequent SBIR phases through four main technical objectives (TO). Metrics of success will be applied to each TO to validate the effectiveness of the project and track progress toward accomplishment of the desired end state. Key measures of performance identified within the TO include cost, timelines, and throughp ...
SBIR Phase I 2023 Department of DefenseArmy -
Alane-powered Carbon-Free 50W Soldier Power Generator (C-SPG)
SBC: FUELX INNOVATION INC Topic: A224020Redacted
SBIR Phase II 2023 Department of DefenseArmy -
Tool-Agnostic Digital Engineering Platform Ontology Design
SBC: ISTARI, INC. Topic: A22002We propose to build a Tool-Agnostic Digital Engineering Platform Ontology that will allow for faster and more intelligent use of digital engineering tools and allow non-subject matter experts to leverage models and simulations expertly. Our approach has three novel aspects to it: First, the Tool-Agnostic Digital Engineering Platform Ontology will be designed such that the models and digital ...
SBIR Phase I 2023 Department of DefenseArmy -
DES- Advanced Circuit Breaker Tech for PDM Solutions
SBC: DEFENSE ENGINEERING SERVICES LLC Topic: A224021Redacted
SBIR Phase II 2023 Department of DefenseArmy -
Synthetic Platform for Device-Agnostic Quantum Dot IR Photodectors
SBC: TETRAMER TECHNOLOGIES LLC Topic: A22BT019The objective of this Phase I STTR is to identify materials and methods for the development of a highly robust, predictive synthetic model that will be used to manufacture on-demand Colloidal Quantum Dot (CQD) as absorbers for infrared (IR) photodetectors. The goal for the STTR program is to identify materials that will enable uncooled or thermoelectrically cooled, small and low-weight IR sensors ...
STTR Phase I 2022 Department of DefenseArmy -
Enhanced Ride Performance- M997A3 Chassis
SBC: ROD HALL LICENSED PRODUCTS, LLC Topic: A224005Redacted
SBIR Phase I 2022 Department of DefenseArmy -
Engineered Beads for Chem-Bio Defense (CBD) Personal Protective Equipment (PPE)
SBC: TETRAMER TECHNOLOGIES LLC Topic: CBD202001The current Joint Service Lightweight Integrated Suit Technology (JSLIST) chemical protective ensemble for the US military is nearing the end of its mission life, requiring the development of new personal protective equipment (PPE) suits for all of the Armed Services. While new suit designs have addressed many design drawbacks of the JSLIST MOPP suits such as thermal stress and flexibility, they s ...
SBIR Phase II 2022 Department of DefenseOffice for Chemical and Biological Defense