You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
High-Temperature, Lightweight, Rad-Hard Silicon Carbide (SiC) DC/DC Converters for Missile Defense Satellite Power Management and Distribution Systems
SBC: Arkansas Power Electronics International, Inc. Topic: MDA06017Power electronic converters are essential in every MDA vehicle, with use in critical systems ranging from electric power management applications, to power distribution, to on-board servo motor/actuator drivers. Advancing state-of-the-art power electronics technologies through the use of SiC semiconductors will produce significant savings across the board in almost all areas of MDA power management ...
SBIR Phase I 2007 Department of DefenseMissile Defense Agency -
HIGH POWER SHORT PULSE BATTERY/CAPACITOR
SBC: ERNEST MEADOWS INDUSTRIAL DESIGN Topic: N/ABIPOLAR BATTERIES CAN, IN PRINCIPLE, YIELD ORDERS OF MAGNITUDE HIGHER SPECIFIC POWER THAN CONVENTIONAL, PARALLEL PLATE BATTERIES. SUCH BATTERIES BEGIN TO HAVE PERFORMANCE CHARACTERISTICS SIMILAR TO CAPACITORS AND COULD POSSIBLY BE USED TO REPLACE CAPACITOR FOR SOME APPLICATIONS. BATTERY PERFORMANCE OF BETWEEN 5 AND 2 A/CM2 AT 1.0 V CELL POTENTIAL FOR A TIME PERIOD OF 500 MICROSECONDS WITH ELECTROD ...
SBIR Phase II 1990 Department of DefenseMissile Defense Agency -
HIGH POWER SHORT PULSE BATTERY/CAPACITOR
SBC: ERNEST MEADOWS INDUSTRIAL DESIGN Topic: N/AN/A
SBIR Phase I 1989 Department of DefenseMissile Defense Agency