You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MAINTENANCE-AND-VIBRATION-FREE SOLID ELECTROLYTE CRYOGENIC COOLER

    SBC: LONE PEAK ENGINEERING COMPANY            Topic: N/A

    THE COOLING REQUIRED FOR THE PROPER OPERATION OF VARIOUS SENSORS AND INSTRUMENTS IS A KEY PROBLEM IN SPACE-BASED FACILITIES. A NOVEL CONCEPT HAS BEEN DEVELOPED AT LONE PEAK ENGINEERING BASED ON THE COMPRESSION OF A GAS TO HIGH PRESSURES USING A SOLID ELECTROLYTE COMPRESSOR. RAPID EXPANSION OF THE COMPRESSED GAS (JOULE-THOMSON EFFECT) CAN BE USED TO COOL SPACECRAFT INSTRUMENTS AND EQUIPMENT. SOME O ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  2. DEVELOPMENT OF A RESIDUAL IN-SITU STRESS GAUGE

    SBC: Terra Tek Inc.            Topic: N/A

    QUANTITATIVE VERIFICATION OF THE RESIDUAL IN-SITU STRESS FIELD WHICH CREATES THE CONTAINMENT CAGE IS NEEDED TO ASSESS THE FACTOR OF SAFETY AGAINST HYDRAULIC FRACTURING FROM THE CAVITY WALL. PHASE I WILL ESTABLISH THE FEASIBLITY OF DEVELOPING A PASSIVE STRESS GAUGE, ABSENT OF ACTIVE INSTRUMENTATION, AND CAPABLE OF RECORDING THE RESIDUAL IN-SITU STRESS FIELD IMMEDIATELY FOLLOWING THE NUCLEAR DEVICE ...

    SBIR Phase II 1991 Department of DefenseDefense Threat Reduction Agency
  3. DYNAMIC RESPONSE OF PILES IN SATURATED SOIL

    SBC: Terra Tek Inc.            Topic: N/A

    THE PROPOSED RESEARCH PROGRAM WILL STUDY SOIL-PILE FOUNDATION INTERACTION INDUCED BY THE DETONATION OF CONVENTIONAL WARPONS. THE ULTIMATE GOAL OF THE PROGRM IS TO ESTABLISH A SET OF GENERAL GUIDELINES FOR FOUNDATION DESIGN OF FUTURE STRATEGIC STRUCTURES AS WELL AS THE ASSESSMENT OF THE VULNERABILITY OF EXISTING STRUCTURES. THE PHASE I EFFORT WILL INVOLVE ANALYSIS OF THE EXISTING EXPERIMENTAL DATA, ...

    SBIR Phase I 1991 Department of DefenseDefense Threat Reduction Agency
  4. DEVELOPMENT OF A RESIDUAL IN-SITU STRESS GAUGE

    SBC: Terra Tek Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government