You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACCELERATOR CONCEPT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    THE PLASMA BEATWAVE ACCELERATOR IS ONE OF A NUMBER OF PARTICLE ACCELERATOR CONCEPTS UTILIZING THE HIGH FIELDS INHERENT IN INTENSE LASER BEAMS. IN THIS CASE, EM WAVES INTERACT NONLINEARLY WITH AN UNDERDENSE PLASMA THROUGH OPTICAL MIXING OR RAMAN FORWARD SCATTERING (RFS) TO EXCITE LARGE AMPLITUDE PLASMA WAVES. THE PLASMA SELF-FIELDS PROVIDE THE ACCELERATION. THUS, THE CONCEPT IS A COLLECTIVEEFFECT A ...

    SBIR Phase I 1983 Department of Energy
  2. ALTERNATIVES TO CONVENTIONAL SOLVENT EXTRACTION OF BIOMASS

    SBC: Plant Resources Institute            Topic: N/A

    IN VIEW OF THCURRENT WORLD SITUATION WITH REGARD TO THE AVAILABILITY AND PRICE INSTABILITY OF FOREIGN OIL, THERE IS AN URGENT NATIONAL NEED TO DEVELOP RENEWABLE DOMESTIC ENERGYSOURCES SUCH AS HYDROCARBON-PRODUCING CROPS (BIOMASS). HOWEVER, EFFICIENT AND COST-EFFECTIVE METHODS FOR THE SIMULTANEOUS EXTRACTION OF BOTH THE POLAR AND NON-POLAR CONSTITUTIENTS OF HYDROCARBON-PRODUCING CROPS NEED TO BE DE ...

    SBIR Phase I 1983 Department of Energy
  3. FASTBUS SEGMENT EXTENSION AS A CRATE COUPLING TECHNIQUE

    SBC: SCIENTIFIC SYSTEMS CO INC            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Energy
  4. PROCESSING AND CHARACTERIZATION OF SILICON CARBIDE-ALUMINUM OXYCARBIDE CERAMICS

    SBC: Technology Holding, LLC            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Energy
  5. ELIMINATION OF TURBULENCE-INDUCED STRUCTURAL FAILURE AND CONTROL LOSS IN VERY LIGHT AIRCRAFT

    SBC: Daedalus Research Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
  6. LINEAR INDUCTION ACCELERATORS ARE THE MEANS BY WHICH PULSED ELECTROSTATIC ACCELERATOR TECHNOLOGY CAN BE SCALED TO HIGH ENERGIES.

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    LINEAR INDUCTION ACCELERATORS ARE THE MEANS BY WHICH PULSED ELECTROSTATIC ACCELERATOR TECHNOLOGY CAN BE SCALED TO HIGH ENERGIES. WE PROPOSE STUDYING ION FOCUSING OF ELECTRONS IN LINEAR INDUCTION ACCELERATORS WITH GOALS OF REDUCING ACCELERATOR COMPLEXITY, COST AND SIZE, DECREASING BEAM EMITTANCE AND IMPROVING STABILITY TO TRANSVERSE DISRUPTIVE BEAM MODES. IN PHASE I RESEARCH, A SMALL INDUCTION LINA ...

    SBIR Phase I 1984 Department of Energy
  7. FASTBUS SEGMENT EXTENSION AS A CRATE COUPLING TECHNIQUE

    SBC: SCIENTIFIC SYSTEMS CO INC            Topic: N/A

    THE FASTBUS (MODULAR, HIGH-SPEED DATA ACQUISITION) SYSTEM SPECIFICATION FOR HIGH-ENERGY PHYSICS AND OTHER DATA SYSTEMSAPPLICATIONS HAS DETAILED A SEGMENT INTERCONNECT CONCEPT THAT ALLOWS A USER TO EXPAND A FASTBUS SYSTEM BEYOND THE 26 SLOT BASIC SEGMENT. THIS PROPOSAL DESCRIBES THE DEVELOPMENT OF A DIFFERENT TECHNIQUE, CALLED THE SEGMENT EXTENSION CONCEPT FOR FASTBUS CRATE COUPLING, THAT WILL ALLO ...

    SBIR Phase II 1984 Department of Energy
  8. COBALT IS A STRATEGICALLY IMPORTANT ELEMENT, AND MINIMIZING ITS USE IS A PROBLEM OF NATIONAL SIGNIFICANCE.

    SBC: Technical research Associates, Inc.            Topic: N/A

    COBALT IS A STRATEGICALLY IMPORTANT ELEMENT, AND MINIMIZING ITS USE IS A PROBLEM OF NATIONAL SIGNIFICANCE. COBALT IS USED IN CEMENTED CARBIDES, PARTICULARLY TUNGSTEN CARBIDE-COBALT, WHICH ARE IN TURN USED FOR METAL CUTTING, MINING TOOLS, WIRE DRAWING DIES AND THE LIKE. IN THIS PROPOSAL, TRA SUGGESTS A NOVEL WAY TO IMPROVE THE PROPERTIES OF WC-CO ALLOYS, AND THUS IMPROVE THE USE LIFE OF SUCH ALLOYS ...

    SBIR Phase I 1984 Department of Energy
  9. THE COST OF DRILLING A GEOTHERMAL WELL IS SIGNIFICANTLY HIGHER THAN THE COST OF DRILLING AN OIL AND GAS WELL AT COMPARABLE DEPTHS.

    SBC: Terra Tek Inc.            Topic: N/A

    THE COST OF DRILLING A GEOTHERMAL WELL IS SIGNIFICANTLY HIGHER THAN THE COST OF DRILLING AN OIL AND GAS WELL AT COMPARABLE DEPTHS. THE HIGHER COST IS DUE PRINCIPALLY TO TWOFACTORS: THE HARDNESS OF THE ROCK FORMATIONS BEING DRILLED AND THE HIGH TEMPERATURES ENCOUNTERED IN DRILLING. THESE TWO FACTORS REDUCE THE RATES OF PENETRATION, THEREBY IN- CREASING THE DRILLING COST. A KEY LIMITATION TO UNDERST ...

    SBIR Phase I 1984 Department of Energy
  10. 3157 February 6, 1997 SatCon Technology Corporation The inherent limitation of chemical batteries to store and release energy has proven to be the most significant obstacle in the commercialization of hybrid

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Energy
US Flag An Official Website of the United States Government