You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ASSESSMENT OF MECHANICAL SHOCK SENSOR CAPABILITIES

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    THERE HAS BEEN LITTLE, IF ANY, DEVELOPMENT IN RECENT YEARS IN THE AREA OF MECHANICAL SHOCK (MS) SENSORS, ESPECIALLY SENSORS WITH HIGH FREQUENCY AND HIGH-G RESPONSE. IT IS PROPOSED THAT THROUGH THE USE OF LITERATURE SOURCES AN ASSESSMENT BE MADE OF THE STATE-OF-THE-ART IN MS SENSORS AND OF THE IMPROVABILITY OF THE MOST ADVANCED DEVICES TO EXTEND THEIR FREQUENCY AND DYNAMIC RANGE. IT IS ALSO PROPOSE ...

    SBIR Phase II 1989 Department of DefenseArmy
  2. CONTROL OF HELICOPTER ROTORBLADE AERODYNAMICS

    SBC: AEDAR CORPORATION            Topic: N/A

    THE PROPOSAL IS CONCERNED WITH THE DEVELOPMENT OF A NEW CONCEPT FOR THE CONTROL OF THE AERODYNAMICS OF HELICOPTER ROTOR BLADES. SUCH A CONTROL DEVICE WILL MAKE IT POSSIBLE TO MECHANIZE THE HELICOPTER ROTOR AIR FOIL MUCH IN THE SAME WAY THAT THE WINGS OF FIXED WING AIRCRAFT ARE MECHANIZED TO ACHIEVE HIGH LIFT, STALL-FREE PERFORMANCE AT LOW SPEEDS. EXISTING METHODS FOR ACTIVE CONTROL OF HELICOPTER R ...

    SBIR Phase I 1989 Department of DefenseArmy
  3. TARGET PREDICTION ALGORITHMS AND IMPLEMENTATION

    SBC: A-TECH CORPORATION            Topic: N/A

    THE INTENT OF THIS WORK IS TO DEVELOP AN ADVANCED ESTIMATED ALGORITHM FOR MANEUVERING TARGET STATE ESTIMATION AND PREDICTION FOR FIRE CONTROL AND TO DEVELOP A DESIGN OF A VHSIC SYSTOLIC ARRAY FOR IMPLEMENTATION OF THE ALGORITHM. THE DESIGN OF THE ALGORITHM WILL CONSIDER MANEUVERING TARGETS INCLUDING AIRCRAFT AND HELICOPTERS. IT WILL INCLUDE THE USE OF ADVANCED SENSOR INFORMATION SUCH AS AN IMAGERY ...

    SBIR Phase II 1989 Department of DefenseArmy
  4. GROWTH AND CHARACTERIZATION OF CD(1-X)ZN(X)TE SINGLE CRYSTALS

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    MERCURY CADMIUM TELLURIDE (MCT) HAS EMERGED AS THE SUPERIOR MATERIAL FOR INFRARED APPLICATIONS IN IMPORTANT 3-5 MICROMETER AND 8-13 MICROMETER RANGES CORRESPONDING TO ATMOSPHERIC WINDOWS. BULK GROWTH METHODS CANNOT PROVIDE DEVICE GRADE LARGE AREA CRYSTALS OF THIS MATERIAL. HENCE, IN ORDER TO REALIZE THE STATE-OF-THE-ART LARGE AREA DEVICES, EPITAXIAL GROWTH IS THE ONLY PLAUSIBLE TECHNIQUE AT THE PR ...

    SBIR Phase II 1989 Department of DefenseArmy
  5. PICO-SECOND OPTICAL HARDWARE IMPLEMENTATION FOR NEURAL NETWORK SYSTEMS

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
  6. NOZZLE ASSEMBLY FOR ARMY MASS DELOUSING OUTFIT

    SBC: CARDINAL SCIENTIFIC INC.            Topic: N/A

    PROPOSES A RECONFIGURED KIORITZ DM-9 BACKPACK SPRAYER THAT WILL (1) DISPENSE METERED VOLUME OF PEDICULICIDE, (2) EMPLOY EXISTING SYSTEM ENERGY SOURCE, (3) ACCESS 17 DISPERSAL SITES/PERSON, AND (4) MAINTAIN ADEQUATE FLOW DIAMETERS. A DESIGN IS POSTULATED THAT INCORPORATES VACUUM ACTUATED SLIDE VALVES, A METERING CHAMBER, AND NOZZLE EFFECTIVENESS. A SURVEY OF PREVIOUS RESEARCH AND TESTING WILL BE CO ...

    SBIR Phase I 1989 Department of DefenseArmy
  7. TESTING EMBEDDED AND PARALLEL SYSTEMS

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    SOFTWARE SYSTEMS FOR MANY MILITARY AND SPACECRAFT EMBEDDED AND PARALLEL (DISTRIBUTED) SYSTEMS APPLICATIONS ARE EXTENSIVE AND HIGHLY COMPLEX, MAKING DESIGN, SAFETY ANALYSIS, VERIFICATION AND TESTING DIFFICULT. SIMILAR PROBLEMS HAVE PLAGUED VLSI HARDWARE DEVELOPERS, AND LIKE IN SPACE AND MILITARY CONTEXTS, THE COST FOR REWORK DUE TO SYSTEMS DESIGN ERRORS HAS DRIVEN DEVELOPMENT OF VALIDATION AND VERI ...

    SBIR Phase I 1989 Department of DefenseArmy
  8. A COMPACT ROBOTIC COMMAND CENTER PHASE II: IMPLEMENTING A HARDENED COMPACT UNIT

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseArmy
  9. HIGH TEMPERATURE SUPERCONDUCTORS WITH IMPROVED CURRENT DENSITIES

    SBC: Cryopower Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
  10. CONCEPTS FOR SPATIALLY ENCODING MILLIMETER WAVE BEAM

    SBC: Defense Systems Inc.            Topic: N/A

    A CONCEPT FOR USING SIDEBAND MODULATIONS TO CREATE A MONOPULSE LIKE GUIDANCE SIGNAL SUITABLE FOR USE BY A MISSILE IN FLIGHT IS PRESENTED. THIS APPROACH OFFERS ADVANTAGES OVER A TRUE MONOPULSE WHICH INCLUDE: VERY LOW COST/SIMPLE ON-BOARD RECEIVER; REDUCE MULTI-PATH PROBLEMS DUE TO LOW ANGLE CLUTTER; AND, GROWTH POTENTIAL TO INCLUDE RANGE INFORMATION NECESSARY FOR USE WITH AN ACTIVE TERMINAL GUIDANC ...

    SBIR Phase I 1989 Department of DefenseArmy
US Flag An Official Website of the United States Government