You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A HIGH RANGE PARTICLE VELOCITY TRANSDUCER DEVELOPMENT

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THERE IS AN ESTABLISHED NEED FOR A SIMPLE ROBUST TRANSDUCER TO MEASURE PARTICLE VELOCITY IN SEVERE BLAST AND SHOCK ENVIRONMENTS SUCH AS NUCLEAR AND HIGH EXPLOSIVE TESTS. A GAGE CONCEPT IS PROPOSED FOR DEVELOPMENT, BASED ON THE PROVEN MEASUREMENT PRINCIPLES USED IN THE HIGHLY SUCCESSFUL DX GAGE, BUT RECONFIGURED MECHANICALLY AND ELECTRICALLY TO WITHSTAND THE HARSH SHOCK ENVIRONMENTS. THE CONCEPT RE ...

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  2. DEVELOPMENT OF A HIGH DYNAMIC RANGE DOWNHOLE SIGNAL CONDITIONING MODULE

    SBC: Applied Research Associates, Inc.            Topic: N/A

    HIGH RANGE (200,000 G) ACCELEROMETERS ARE THE ONLY TRANSDUCERS THAT PROVIDE THE REQUIRED LONG-TERM DATA IN THE ENVIRONMENTS OF INTEREST TO THE BLAST AND SHOCK COMMUNITY. THESE GAGES HAVE A VERY LARGE DYNAMIC RANGE AND NOISE OFTEN MASKS THE LATE TIME (BUT EXTREMELY IMPORTANT) DATA. WE PROPOSE TO DEVELOP A CLOSE COUPLED LOGARITHMIC GAIN SIGNAL CONDITIONING SYSTEM THAT WILL CORRECT THE LATE TIME NOIS ...

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  3. HIGH TEMPERATURE SUPERCONDUCTORS WITH IMPROVED CURRENT DENSITIES

    SBC: Cryopower Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
  4. HIGH POWER SHORT PULSE BATTERY/CAPACITOR

    SBC: ERNEST MEADOWS INDUSTRIAL DESIGN            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
  5. DEVELOPMENT OF AN EULERIAN FINITE ELEMENT CODE

    SBC: Intelligent Systems Research, Inc.            Topic: N/A

    CURRENT NUMERICAL COMPUTATIONS TO DESCRIBE NUCLEAR GROUND SHOCK ENVIRONMENTS, NUCLEAR CRATER FORMATION, IMPACT DYNAMICS AND PENETRATION MECHANISMS PRESENTLY EMPLOY EULERIAN-BASED FINITE DIFFERENCE CODES BECAUSE OF THEIR ABILITY TO MODEL THE MASS FLUX PHENOMENA IN TRACKING MATERIAL MOVEMENT THROUGH THE DISCRETIZED SPACE. THE FINITE DIFFERENCE CODES SUFFER IN COMPARISON TO FINITE ELEMENT CODES, HOWE ...

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  6. SIDEBAND SUPPRESSION IN HIGH POWER FREE ELECTRON LASERS

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
  7. LABORATORY STUDY OF EXTENSION FAILURE IN NEVADA TEST SITE TUFFS

    SBC: Terra Tek Inc.            Topic: N/A

    CALCULATED GROUND MOTION FROM NUCLEAR EXPLOSIONS PREDICT THAT AT LOCATIONS NEAR THE CAVITY THE ROCK FAILURE SURFACE WILL BE ENCOUNTERED IN EXTENSION DURING LATER STAGES OF UNLOAD. THE RESULTING HOOP FRACTURES WILL PRODUCE A FAILED ROCK ZONE SURROUNDING THE CAVITY. HIGH PRESSURE CAVITY GASES COULD INITIATE A HYDRAULIC FRACTURE THROUGH THE FRACTURE ROCK WHICH, UNDER THE WORST CONDITION, WOULD LEAD T ...

    SBIR Phase I 1989 Department of DefenseDefense Threat Reduction Agency
  8. MICROSTACK INSULATOR FOR HIGH VOLTAGE PULSED SYSTEMS

    SBC: Tetra Corporation            Topic: N/A

    POLYMERIC OR CERAMIC INSULATORS CONVENTIONALLY ARE BEING USED IN HIGH VOLTAGE PULSED SYSTEMS. NEW APPROACHES ARE NEEDED THAT WOULD REDUCE INSULATORS RING THICKNESSES AND INCREASE CORRESPONDING GRADING RINGS FLASHOVER VOLTAGE. SUCH AN APPROACH WOULD POSSESS IN COMPARISON TO CONVENTIONAL INSULATORS: HIGHER SURFACE FLASHOVER FIELD STRENGTH; SMALLER PHYSICAL DIMENSIONS FOR EQUIVALENT VOLTAGE HOLDOFF; ...

    SBIR Phase II 1989 Department of DefenseMissile Defense Agency
  9. HIGH POWER LOW IMPEDANCE LIGHT WEIGHT TRANSMISSION LINES

    SBC: Tetra Corporation            Topic: N/A

    THE DEVELOPMENT OF HIGH POWER, LOW IMPEDANCE, LIGHTWEIGHT ENERGY STORAGE TRANSMISSION LINES FOR PULSE-POWER APPLICATIONS IS CRUCIAL FORSMALLER, LIGHTWEIGHT, SPACE-BASED, PULSE-POWER SYSTEMS. DEVELOPMENT OF HIGH DIELECTRIC ENERGY STORAGE LINE TECHNOLOGY WOULD GREATLY REDUCETHE SIZE, WEIGHT, AND COMPLEXITY OF PULSE POWER SYSTEMS UTILIZING THESE TYPES OF COMPONENTS. EFFICIENT TRANSPORT OF 400KV, 100K ...

    SBIR Phase II 1989 Department of DefenseMissile Defense Agency
  10. PLASMA CATHODE FOR HIGH POWER PHOTOIONIZED LASERS AND PLASMA SWITCHES

    SBC: Tetra Corporation            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government