You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
META COMPILER FOR VERY HIGH LEVEL LANGUAGE IN BATTLE MANAGEMENT
SBC: Space Tech Corp Topic: N/AANY VERY HIGH LEVEL LANGUAGE (VHLL) FOR STRATEGIC DEFENSE REQUIRES A COMPILER. NEW META COMPILERS USING ADVANCED ARTIFICIAL INTELLIGENCE METHODS ARE BEING STUDIED SO THAT EVENTUAL VHLL APPLICATION SOFTWARE CAN BE EFFECTIVELY PORTED TO THE SEVERAL GROUND-BASED/SATELLITE-BASED MACHINES. TO DO SO REQUIRES A META COMPILER THAT CAN COMPILE CODE TO DIVERSE ARCHITECTURES. RESEARCH WITH META COMPILERS DEM ...
SBIR Phase II 1989 Department of DefenseMissile Defense Agency -
MICROSTACK INSULATOR FOR HIGH VOLTAGE PULSED SYSTEMS
SBC: Tetra Corporation Topic: N/APOLYMERIC OR CERAMIC INSULATORS CONVENTIONALLY ARE BEING USED IN HIGH VOLTAGE PULSED SYSTEMS. NEW APPROACHES ARE NEEDED THAT WOULD REDUCE INSULATORS RING THICKNESSES AND INCREASE CORRESPONDING GRADING RINGS FLASHOVER VOLTAGE. SUCH AN APPROACH WOULD POSSESS IN COMPARISON TO CONVENTIONAL INSULATORS: HIGHER SURFACE FLASHOVER FIELD STRENGTH; SMALLER PHYSICAL DIMENSIONS FOR EQUIVALENT VOLTAGE HOLDOFF; ...
SBIR Phase II 1989 Department of DefenseMissile Defense Agency -
HIGH POWER LOW IMPEDANCE LIGHT WEIGHT TRANSMISSION LINES
SBC: Tetra Corporation Topic: N/ATHE DEVELOPMENT OF HIGH POWER, LOW IMPEDANCE, LIGHTWEIGHT ENERGY STORAGE TRANSMISSION LINES FOR PULSE-POWER APPLICATIONS IS CRUCIAL FORSMALLER, LIGHTWEIGHT, SPACE-BASED, PULSE-POWER SYSTEMS. DEVELOPMENT OF HIGH DIELECTRIC ENERGY STORAGE LINE TECHNOLOGY WOULD GREATLY REDUCETHE SIZE, WEIGHT, AND COMPLEXITY OF PULSE POWER SYSTEMS UTILIZING THESE TYPES OF COMPONENTS. EFFICIENT TRANSPORT OF 400KV, 100K ...
SBIR Phase II 1989 Department of DefenseMissile Defense Agency -
High Temperature Optoelectronics
SBC: ASTRALUX, INC. Topic: N/AThere are no commercial amplifiers that can operate at temperatures above 125 degrees Celsius. We will combine two comparable wide bandgap semiconducting materials to make electronic amplifiers and switches that operate at high temperatures (at least 500 degrees Celsius). These devices can be controlled remotely by a light beam. Hence wireless coupling to a room temperature macroprocessor is possi ...
SBIR Phase II 1993 Department of DefenseMissile Defense Agency -
VIRTUAL PROTOTYPING TOOLS FOR SEMICONDUCTOR FABRICATION EQUIPMENT
SBC: CFD RESEARCH CORPORATION Topic: N/ATHE EXISTING METHODOLOGY OF DESIGN AND FABRICATION OF SEMICONDUCTOR MANUFACTURING EQUIPMENT IS AN EXPENSIVE AND TIME CONSUMING PROCESS. TO KEEP PACE WITH THE RAPIDLY ADVANCING SEMICONDUCTOR INDUSTRY, IT IS NECESSARY TO DEVELOP A COMPUTER BASED ENVIRONMENT TO QUICKLY SIMULATE THE FEATURES OF THE MANUFACTURING EQUIPMENT BEFORE IT IS TURNED INTO A PHYSICAL PROTOTYPE. APART FROM ACHIEVING CONSIDERABLE ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
DEVELOPMENT OF A COMPACT 2 UM COHERENT LASER RADAR VIBRATION SENSOR
SBC: COHERENT TECHNOLOGIES, INC. Topic: N/AREMOTE SENSING OF VIBRATIONS USING COHERENT LASER RADAR (CLR) HAS BEEN IDENTIFIED AS A MEANS OF IDENTIFYING REMOTE TARGETS BY ANALYSIS OF CHARACTERISTIC VIBRATION SPECTRA. CO2 LASER TECHNOLOGY HAS BEEN USED IN EFFORTS UP TO THE PRESENT. RECENT ADVANCES IN EYESAFE ( 1.4 UM) SOLID-STATE LASER AND LASER RADAR TECHNOLOGY POINT TO A MORE SENSITIVE, COMPACT, SHORTER WAVELENGTH ALTERNATIVE, HIGHLY COMPAT ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
FEASIBILITY OF UAV AIRFOIL & CONTROL SURFACE MANUFACTURING USING CONTINUOUS MANUFACTURING MACHINES
SBC: Daedalus Research Inc. Topic: N/ACONTRACTOR WILL EXAMINE THE FEASIBILITY OF UTILIZING PULTRUSION-TYPE CONTINUOUS TAPE LAYING MANUFACTURING EQUIPMENT TO FABRICATE COMPOSITE SANDWICH STRUCTURE WINGS AND STABILIZERS FOR CLOSE RANGE AND SHORT RANGE CLASS UNMANNED AERIAL VEHICLES. DURING PHASE I A SMALL PROOF-OF-CONCEPT MANUFACTURING MACHINE WILL BE DESIGNED, BUILT, AND EVALUATED. IN ADDITION, THE QUALITY OF THE MANUFACTURED PRODUCT F ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
FLEXIBLE MANUFACTURING OF ADVANCED STRUCTURAL CERAMICS USING LAMINATED OBJECT MANUFACTURING TECHNIQUES
SBC: LONE PEAK ENGINEERING COMPANY Topic: N/AFABRICATING CERAMIC PROTOTYPES OR MANUFACTURING LOW VOLUME QUANTITIES OF CERAMIC PARTS IS A COSTLY, TIME-CONSUMING, AND INFLEXIBLE PROCESS. THESE RESTRICTIONS LIMIT THE USE OR EVEN THE CONSIDERATION OF CERAMICS IN SOME APPLICATIONS. A VARIETY OF TECHNIQUES HAVE BEEN DEVELOPED TO PRODUCE PAPER- AND POLYMER-BASED PARTS DIRECTLY FROM A COMPUTER-AIDED DRAWING WITHOUT ANY HARD TOOLING, DIES, OR MOLDS. ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
HIGH SPEED IMAGE CAPTURE OF THE 3-D PEEL POINT GEOMETRY DURING PAYOUT
SBC: MORGAN RESEARCH CORP. Topic: N/AAN ACCURATE KNOWLEDGE OF THE MAXIMUM FIBER STRESS OCCURRING DURING PAYOUT IS CRITICAL TO IMPROVE THE RELIABILITY OF CURRENT AND FUTURE DISPENSER DESIGNS FOR FIBER OPTIC GUIDED VEHICLES. THE FIBER DEFORMATIONS OCCURRING AT THE PEEL POINT ARE A DIRECT INDICATION OF THE MAXIMUM FIBER STRESSES UNDER NORMAL PAYOUT CONDITIONS. IN ADDITION, THE FIBER DEFORMATIONS AT THE PEEL POINT PROVIDE AN INVALUABLE M ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
Capillary Discharge X-Ray Laser Driver
SBC: Multilayer Optics And X-ray Topic: N/AA compact x-ray laser driver with a high repetition rate is the subject of this phase I project. Most existing x-ray laser drivers are huge (1000s of square feet of floor space), expensive ($10,000,000+), have a low repetition rate (1/hr), are complex and require several PhDs to keep them working. Thus applications of present x-ray lasers are limited. In contrast, the proposed laser will occupy on ...
SBIR Phase II 1993 Department of DefenseMissile Defense Agency