You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. IMPROVED POLLUTION CONTROL USING RAMAN SCATTERING GAS ANALYSIS

    SBC: Albion Instruments            Topic: N/A

    REAL TIME ON-LINE ANALYSIS OF STACK GASSES IS NECESSARY TO MONITOR EFFLUENTS AND TO PERMIT FEEDBACK CONTROL OF COMBUSTION PROCESS AND DOWN STREAM SCRUBBER SYSTEMS. MULTIMEDIA POLLUTION ANALYSIS REQUIRES MULTIPLE SENSOR TECHNOLOGY WITH PRESENT COMMERCIALLY AVAILABLE INSTRUMENTATION. CURRENTLY, COMPLEX ANALYTICAL SYSTEMS MUSTBE ASSEMBLED THAT ARE EXPENSIVE, PRONE TO DRIFT, AND DIFFICULT TO OPERATE A ...

    SBIR Phase I 1989 Environmental Protection Agency
  2. DESTRUCTION OF ORGANIC HAZARDOUS WASTE BY THE HDI ELECTRIC ARC PROCESS 11490

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THE DESTRUCTION OF ORGANIC HAZARDOUS WASTE BY ELECTRIC ARC PYROLYSIS HAS BEEN DEMONSTRATED TO BE TECHNICALLY FEASIBLE BY OTHERS. THE PRINCIPAL PROBLEMS LIE IN (1) THE SHORT LIFEOF THE ELECTRODES (AND RELATED STRUCTURES) DUE TO THE HIGH TEMPERATURES INVOLVED, AND (2) THE RELATIVELY HIGH COST OF THE ELECTRIC POWER NEEDED. APPLIED RESEARCH ASSOCIATES, INC. PROPOSE TO DESTROY ORGANIC HAZARDOUS WASTE B ...

    SBIR Phase I 1989 Environmental Protection Agency
  3. HIGH TEMPERATURE SUPERCONDUCTORS WITH IMPROVED CURRENT DENSITIES

    SBC: Cryopower Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
  4. HIGH POWER SHORT PULSE BATTERY/CAPACITOR

    SBC: ERNEST MEADOWS INDUSTRIAL DESIGN            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
  5. HEAVY METAL REMOVAL AT THE PPB LEVEL FROM CULINARY WATER USING A NOVEL MACROCYCLE-SILICA GEL DEVICE

    SBC: IBC ADVANCED TECHNOLOGIES, INC            Topic: N/A

    IT IS DESIRABLE TO HAVE A MTHOD FOR EFFICIENT, COST EFFEC- TIVE, AND SIMULTANEOUS REMOVAL OF PB(II), AG(I), CD(II) AND HG(II) FROM POTABLE WATER TO LEVELS WELL BELOW THEIR EPA LIMITS. SUCH A METHOD COULD BE USED BY BOTH MUNICIPAL WATER WASTE TREATMENT PLALNTS. THE INTERACTION OF THE MACROCYCLE TETRAAZA-18CROWN WITH THE METALS OF INTEREST IS OF SUFFI- CIENT STRENGTH AND SELECTIVITY TO REMOVE THE ME ...

    SBIR Phase II 1989 Environmental Protection Agency
  6. SIDEBAND SUPPRESSION IN HIGH POWER FREE ELECTRON LASERS

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
  7. MICROSTACK INSULATOR FOR HIGH VOLTAGE PULSED SYSTEMS

    SBC: Tetra Corporation            Topic: N/A

    POLYMERIC OR CERAMIC INSULATORS CONVENTIONALLY ARE BEING USED IN HIGH VOLTAGE PULSED SYSTEMS. NEW APPROACHES ARE NEEDED THAT WOULD REDUCE INSULATORS RING THICKNESSES AND INCREASE CORRESPONDING GRADING RINGS FLASHOVER VOLTAGE. SUCH AN APPROACH WOULD POSSESS IN COMPARISON TO CONVENTIONAL INSULATORS: HIGHER SURFACE FLASHOVER FIELD STRENGTH; SMALLER PHYSICAL DIMENSIONS FOR EQUIVALENT VOLTAGE HOLDOFF; ...

    SBIR Phase II 1989 Department of DefenseMissile Defense Agency
  8. HIGH POWER LOW IMPEDANCE LIGHT WEIGHT TRANSMISSION LINES

    SBC: Tetra Corporation            Topic: N/A

    THE DEVELOPMENT OF HIGH POWER, LOW IMPEDANCE, LIGHTWEIGHT ENERGY STORAGE TRANSMISSION LINES FOR PULSE-POWER APPLICATIONS IS CRUCIAL FORSMALLER, LIGHTWEIGHT, SPACE-BASED, PULSE-POWER SYSTEMS. DEVELOPMENT OF HIGH DIELECTRIC ENERGY STORAGE LINE TECHNOLOGY WOULD GREATLY REDUCETHE SIZE, WEIGHT, AND COMPLEXITY OF PULSE POWER SYSTEMS UTILIZING THESE TYPES OF COMPONENTS. EFFICIENT TRANSPORT OF 400KV, 100K ...

    SBIR Phase II 1989 Department of DefenseMissile Defense Agency
  9. PLASMA CATHODE FOR HIGH POWER PHOTOIONIZED LASERS AND PLASMA SWITCHES

    SBC: Tetra Corporation            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
  10. MEGAVOLT MEGAHERTZ PULSE GENERATOR TECHNOLOGY

    SBC: Tetra Corporation            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government