You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MICROSTACK INSULATOR FOR HIGH VOLTAGE PULSED SYSTEMS

    SBC: Tetra Corporation            Topic: N/A

    POLYMERIC OR CERAMIC INSULATORS CONVENTIONALLY ARE BEING USED IN HIGH VOLTAGE PULSED SYSTEMS. NEW APPROACHES ARE NEEDED THAT WOULD REDUCE INSULATORS RING THICKNESSES AND INCREASE CORRESPONDING GRADING RINGS FLASHOVER VOLTAGE. SUCH AN APPROACH WOULD POSSESS IN COMPARISON TO CONVENTIONAL INSULATORS: HIGHER SURFACE FLASHOVER FIELD STRENGTH; SMALLER PHYSICAL DIMENSIONS FOR EQUIVALENT VOLTAGE HOLDOFF; ...

    SBIR Phase II 1989 Department of DefenseMissile Defense Agency
  2. HIGH POWER LOW IMPEDANCE LIGHT WEIGHT TRANSMISSION LINES

    SBC: Tetra Corporation            Topic: N/A

    THE DEVELOPMENT OF HIGH POWER, LOW IMPEDANCE, LIGHTWEIGHT ENERGY STORAGE TRANSMISSION LINES FOR PULSE-POWER APPLICATIONS IS CRUCIAL FORSMALLER, LIGHTWEIGHT, SPACE-BASED, PULSE-POWER SYSTEMS. DEVELOPMENT OF HIGH DIELECTRIC ENERGY STORAGE LINE TECHNOLOGY WOULD GREATLY REDUCETHE SIZE, WEIGHT, AND COMPLEXITY OF PULSE POWER SYSTEMS UTILIZING THESE TYPES OF COMPONENTS. EFFICIENT TRANSPORT OF 400KV, 100K ...

    SBIR Phase II 1989 Department of DefenseMissile Defense Agency
  3. Space Qualified, Fast Steering Mirror (SQ_FSM)

    SBC: A-TECH CORPORATION            Topic: MDA08011

    Many steering mirrors have been developed over the years, but never has one been explicitly designed for high dose radiation environments or long-term space operations. As a result, deployed spaced based optical systems for line-of-sight stabilization or beam control have not benefited from the higher bandwidth control and better error rejection that can result from designs incorporating fast ste ...

    SBIR Phase II 2010 Department of DefenseMissile Defense Agency
  4. Compact High Power Microwave Payloads

    SBC: KTECH CORP.            Topic: MDA08047

    Design and build compact, pulsed power devices for High Power Microwave (HPM) Payloads for small rockets and/or the Multiple Kill Vehicles (MKVs).The overall requirements for this solicitation are very demanding. Overall, an explosive pulsed power system is required to be able to drive an RF source. This eventually will include prime power, the generator, and a pulse forming circuit. While the ...

    SBIR Phase II 2010 Department of DefenseMissile Defense Agency
  5. Sentient Connectors for Enhanced, Integration, Test, and Mission Assurance

    SBC: MANAGEMENT SCIENCES INC            Topic: MDA08001

    Management Sciences, Inc., with support of Raytheon Missile Systems (RMS), proposes to build and demonstrate pre-production article of a “Smart Missile Connector” that will provide a Built In Test (BIT), diagnostics and prognostics capability for the Standard Missile III Block 2B. (BIT is a requirement of the 2B upgrade contract.) RMS will assist MSI to prepare a Performance Specification. MSI ...

    SBIR Phase II 2010 Department of DefenseMissile Defense Agency
  6. Advanced LADAR Modeling

    SBC: TAU TECHNOLOGIES LLC            Topic: MDA08051

    This Small Business Innovative Research (SBIR) addresses simulation modeling of optical Laser Radar (LADAR) systems. Because of the tremendous wavelength advantages provided by modern LADAR systems over conventional RADAR technologies, more advanced directed energy (DE) and surveillance systems are beginning to incorporate laser based active imaging and ranging technologies. There is a need to eva ...

    SBIR Phase II 2010 Department of DefenseMissile Defense Agency
  7. Space Qualified, Fast Steering Mirror (SQ_FSM)

    SBC: A-TECH CORPORATION            Topic: MDA08011

    Many steering mirrors have been developed over the years, but never has one been explicitly designed for high dose radiation environments or long-term space operations. As a result, deployed spaced based optical systems for line-of-sight stabilization or beam control have not benefited from the higher bandwidth control and better error rejection that can result from designs incorporating fast ste ...

    SBIR Phase II 2010 Department of DefenseMissile Defense Agency
  8. Dual-Band Focal Plane Arrays with Double Unipolar Barrier InAs/GaSb Superlattices

    SBC: SK Infrared LLC            Topic: MDA10012

    In this Phase II effort, SK Infrared LLC, is collaborating with Raytheon Vision Systems (RVS) to demonstrate a dual color 512x512 30 um pitch long wave/long wave (LW/LW) pBp focal plane array (FPA) hybridized to a RVS SB410 Read Out Integrated Circuit (ROIC). The SB410 is a 512x512 30 micron pitch dual band ROIC developed by RVS. The final deliverable at the end of the two year project would be a ...

    SBIR Phase II 2013 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government