You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 3117 results
  1. THIS PHASE I, 6-MONTH FEASIBILITY STUDY IS TO ADDRESS PROBLEMS OUTLINED BY THE FUNDAMENTAL NEUROSCIENCES PROGRAM OF THE NATIONAL INSTITUTE OF NEUROLOGICAL AND COMMUNICATIVE DISORDERS AND STROKE (NINCDS).

    SBC: Biomaterials International Inc            Topic: N/A

    THIS PHASE I, 6-MONTH FEASIBILITY STUDY IS TO ADDRESS PROBLEMS OUTLINED BY THE FUNDAMENTAL NEUROSCIENCES PROGRAM OF THE NATIONAL INSTITUTE OF NEUROLOGICAL AND COMMUNICATIVE DISORDERS AND STROKE (NINCDS). ULTIMATE LONG TERM SUCCESS OF AN AUDITORY PROSTHESIS REQUIRES AN ELECTRODE DESIGN WHICHIS FLEXIBLE ENOUGH FOR EASY INSERTION, CAN BOND SUFFICIENTLYWITH METALS TO WITHSTAND BENDING AND ELIMINATE WI ...

    SBIR Phase I 1983 Department of Health and Human Services
  2. SIX-COMPONENT ROBOTIC FORCE-TORQUE SENSOR

    SBC: BONNEVILLE SCIENTIFIC, INC.            Topic: N/A

    N/A

    SBIR Phase I 1983 National Aeronautics and Space Administration
  3. DEVELOPMENT OF NB(X)TI(1-X)O(2-D) SEMICONDUCTING ELECTRODES FOR PHOTOELECTROLYSIS OF WATER

    SBC: Technology Holding, LLC            Topic: N/A

    N/A

    SBIR Phase I 1983 National Science Foundation
  4. HIGH ENERGY HIGH POWER DENSITY SODIUM\MIXED CHALCOGENIDE BATTERIES FOR POWER APPLICATIONS.

    SBC: Technology Holding, LLC            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseAir Force
  5. APPLICATION OF FLUID BEARINGS TO TURBINE FLOW METERS

    SBC: Intermoutain Technologies            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Energy
  6. INOCULATED TRANSFER PLUG FOR MASS PRODUCTION OF TISSUE CULTURED TREES.

    SBC: Native Plants Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of Agriculture
  7. WILD RELATIVES OF MANY OF OUR ECOMICALLY-VALUABLE PLANTS POSSESS MANY USEFUL TRAITS, BUT INTRODUCTION OF THESE TRAITSINTO OUR MODERN CULTIVARS IS CURRENTLY HAMPERED BY THE FACT THAT MANY OF THESE TRAITS ARE BOTH QUANTATIVE AND MULTIGENIC.

    SBC: Npi            Topic: N/A

    WILD RELATIVES OF MANY OF OUR ECOMICALLY-VALUABLE PLANTS POSSESS MANY USEFUL TRAITS, BUT INTRODUCTION OF THESE TRAITSINTO OUR MODERN CULTIVARS IS CURRENTLY HAMPERED BY THE FACT THAT MANY OF THESE TRAITS ARE BOTH QUANTATIVE AND MULTIGENIC. OUR PROPOSAL WILL EXAMINCE THE FEASIBILITY OF UTILIZING DNA RESTRICTION FRAGMENT POLYMORPHISMS TO GENETICALLY ANALYZE BOTH QUANTATTIVE AND MULTIGENIC TRAITS IN U ...

    SBIR Phase I 1983 National Science Foundation
  8. BACTERIA

    SBC: Plant Resources Institute            Topic: N/A

    THE NEEDFOR MORE RAPID, PRECISE DETECTION OFPLANT PATHOGENS IN PLANT MATERIALS IN ORDER TO ASSURE HIGH CROP PRODUCTIVITY AND PROTECT AGAINST EPIDEMICS OF IMPORTANT PLANT PATHOGENS HAS BEENSTRESSED BY THOSE CONCERNED WITH CROP GERMPLASM RESOURCES CERTIFICATION OF VEGETATIVELY PROPAGATED MATERIALS AND SEED LOT ANALYSIS. WE PROPOSE TO TEST THE FEASIBILITY OF DEVELOPING A NEW DIAGNOSTIC PROCEDURE FOR ...

    SBIR Phase I 1983 National Science Foundation
  9. PLANTS

    SBC: Plant Resources Institute            Topic: N/A

    THE NEED FOR NEW CHEMICALS WITH WHICH TO CONTROL AGRICULTURAL INSECT PESTS IS IMMEDIATE DUE TO PROBLEMS OF INSECT RESISTANCE, RESURGENCE, AND ENVIRONMENTAL CONTAMINATION ASSOCIATED WITH CONVENTIONAL INSECTICIDES. THEELUCIDATION OF BIOLOGICAL ACTIVE CHEMICAL CONSTITUENCY OF PLANTS, ESPECIALLY THOSE STRESSED ENVIRONMENTS SUCH AS ARID AND SEMI-ARID REGIONS, IS EXPECTED TO PROVIDE MODELS FOR, ORTO BE ...

    SBIR Phase I 1983 National Science Foundation
  10. ALTERNATIVES TO CONVENTIONAL SOLVENT EXTRACTION OF BIOMASS

    SBC: Plant Resources Institute            Topic: N/A

    IN VIEW OF THCURRENT WORLD SITUATION WITH REGARD TO THE AVAILABILITY AND PRICE INSTABILITY OF FOREIGN OIL, THERE IS AN URGENT NATIONAL NEED TO DEVELOP RENEWABLE DOMESTIC ENERGYSOURCES SUCH AS HYDROCARBON-PRODUCING CROPS (BIOMASS). HOWEVER, EFFICIENT AND COST-EFFECTIVE METHODS FOR THE SIMULTANEOUS EXTRACTION OF BOTH THE POLAR AND NON-POLAR CONSTITUTIENTS OF HYDROCARBON-PRODUCING CROPS NEED TO BE DE ...

    SBIR Phase I 1983 Department of Energy
US Flag An Official Website of the United States Government